Establishing Methodology for Simulation-based Ship Design and Construction Using Virtual Manufacturing Technologies |
Kim, Hong-Tae
(Korea Research Institute of Ships and Ocean Engineering/KORDI)
Lee, Jong-Gap (Korea Research Institute of Ships and Ocean Engineering/KORDI) Hwang, Kyu-Ok (Samsung Heavy Industry Co., LTD. Koje Shipyard) Jang, Dong-Sik (Department of Industrial Systems and Information Engineering. Korea University) |
1 | Jones, G. and Hankinson, T. (1994), Simulation Based Design for Ship Design and Acquisition, Proceedings of the 9th International Conference on Computer Application in Shipbuilding, Germany |
2 | Kim,H. (1998), Coolaborative Virtual Prototyping Technology for Engineering Simulation, journal of Ships and Ocean Engineering, 27, 97-104.(in Korean) |
3 | Behning, A., Cary, T. and Wittmeyer, J. (1997), Simulation and Visualization Opportunities in the Ship Production & Maritime Environment, Proceedings of 1997 Ship Production Symposium, SNAME |
4 | Cardner,J. (1998), Simulation of Mobile Offshore Base, Project Report, GCRMTC |
5 | Kim,K, Woo, S. and Han, H. (2001), A Study on the Erection Scheduling for Shipbuilding Cosindering Resource Constraints, IE interface, 14(3),218-226. (in Korean) |
6 | Baum, s. T. and Ramakrishnan, R.(1997), Applying 3D Product Modeling Technology to Shipbuilding, Marine Technology, 34(1), 56-65 |
7 | Beier, K (2000), Web-based Virtual Reality in Design and Manufacturing Applications, Proceedings of COMPIT2000, Germany |
8 | Vassalos, D., Kim, H, Christiansen, G. and Majumder,J. (2001), A Mesoscopic Model for Passenger Evacuation Simulation in a Virtual Ship Environment and Performance-based Evaluation, Proceedings of Conference on Pedestrian and Evacuation Dynamics, Germany |
9 | Lee, J-K. and Choi, H-R.(1993), Erection Scheduling at Shipbuilding Using Constraint Directed Graph Search; DAS-ERECT , Proceedings of 93 Korea Japan joint Conference on Expert Systems, Seoul, Korea |
10 | Hugan,J. C (2000), Using Simulation to Evaluate Cargo Ship Design on the Lpd17Program, Proceedings of the 2000Winter Simulation Conference, Orlando |
11 | Hong,Y-K, Jung, E-K,Jun,J. and Kim,So Y. (1997), Generation of Erection Sequence in Shipbuilding Process Planning ,IE Interface, 10(1), 189-207. (in Korean) |
12 | Ham, WoK, Kim, K-C., Shin, I-J., Urn, D-S. and Hong, B-K (1996), Ship Construction Engineering, The Society of Naval Architects of Korea. (in Korean) |
13 | Fast, K (1996), EVS at Electric Boat, Proceedings of I996 Deneb's User Group, Michigan |
14 | Shukla, C, Vazquez, M. and Chen F. F.(1996), Virtual Manufacturing : Overview, Computers and Industrial Engineering, 31(1/2), 79-82 |
15 | Kraftcheck, J., Dani, T. and Gadh,R.(1997), State of the Arrin Virtual Design And Manufacturing, VR News, 6(4), 16-22 |
16 | Aoyama K et aI. (1995), Development of Integrated CAE System for Design Ship Structure in CIM, journal of the Society of Naval Architects of Japan, 178, 749-762 |
17 | Angster, S.(1997), VEDAM : Virtual Environment for Design and Manufacturing, VR News, 6(5), 16-29 |
18 | Lee, J-K et al. (2000), Development of Model-based CAE and Simulation Technologies For Ships and Ocean Engineering (III), Project Report, Korea Research Institute Of Ships and Ocean Engineering, (in Korean) |
19 | Noh, S-D., Lee, C-H. and Han, H-S.(2001), Virtual Manufacturing for an Automotive Company(l), IE interface, 14(2), 120-126.(in Korean) |