Journal of the Korea Academia-Industrial cooperation Society
/
v.13
no.9
/
pp.3889-3894
/
2012
The platform of railroad station for domestic passenger train has been operated at two categories like the platforms if low level(500mm, mainline) and high level(1,135mm, metropolitan subway line). To operate both metropolitan subway line and mainline railroad safely, it is essential to develop the doorstep equipment of railway vehicle regardless of low and high level platforms. On the other hand, the domestic test standard at durability and reliability of doorstep equipment has not been existed until now. This study aims at the development on doorstep equipment of telescopic sliding type for low and high level platforms. Durability analysis with VPD(Virtual Product Development) techniques are performed and the durability standard & qualification life through the rig test during no failure test time is examined in accordance with reliability qualification test.
Transactions of the Korean Society of Mechanical Engineers A
/
v.35
no.6
/
pp.683-691
/
2011
In order to develop technology for an equipment qualification (EQ) test, which is an important process in localizing solenoid-operated valves used in nuclear power plants, we analyzed related regulations, test procedures, conditions, equipment, and acceptance criteria. EQ regulations for the solenoid-operated valve are classified as law, guide, and standard, and are subdivided according to test specimens and contents. The EQ test is composed of functional, normal-, and accident- condition tests. The solenoid-operated valve is aged under normal and accident conditions, which are predicted in the design conditions of a nuclear power plant, and the performance of the valve is measured by a functional test. The test method and procedure analyzed in this paper might be very useful for manufacturers as well as EQ testers.
Transactions of the Korean Society for Noise and Vibration Engineering
/
v.12
no.11
/
pp.856-863
/
2002
Seismic qualification of the main control board(MCB) for the nuclear power plant Ulchin 5 and 6 has been performed with the guideline of ASME Section III and IEEE 344 code. As the size and weight of the MCB are too large and heavy to excite using the excitation table, finite element analysis is used in order to investigate the dynamic behaviors and structural integrity of the MCB. As the fundamental frequencies of the equipment are found to be less than 33 Hz, which is the upper frequency limit for the dynamic analysis, response spectrum analysis using ANSYS is performed in order to combine the modal stresses within the frequency limit. In order to confirm the electrical stability of the major components of the MCB. modal analysis theory has been adopted to derive the required response spectra at the component locations. As the all combined stresses obtained from the above procedures are less than the allowable stresses and no mechanical or electrical failures are found from the seismic testing, the authors can confirm the safety of the nuclear equipment MCB under the given seismic loading conditions.
This paper describes QA methodologies for developed TBN control system that will be applied to nuclear power plants. The details are the development of QA Manual, QA Procedures, Equipment Qualification Procedure, Commercial Grade Items Dedication, and Software Verification & Validation Plan.
Validation specifies and coordinates all relevant activities to ensure compliance with good laboratory practices (GLP) according to suitable international standards. This includes validation activities of past, present and future for the best possible actions to ensure the integrity of non-clinical laboratory data. Recently, validation has become increasingly important, not only in good manufacturing practice (GMP) institutions but also in GLP facilities. In accordance with the guideline for GLP regulations, all equipments used to generate, measure, or assess data should undergo validation to ensure that this equipment is of appropriate design and capacity and that it will consistently function as intended. Therefore, the implantation of validation processes is considered to be an essential step in a global institution. This review describes the procedures and documentations required for validation of GLP. It introduces basic elements such as the validation master plan, risk assessment, gap analysis, design qualification, installation qualification, operational qualification, performance qualification, calibration, traceability, and revalidation.
A valve assembly used in nuclear power plants must be qualified and supervised. New technical standards such as ASME QME-1 2007 particularly require detailed qualification using experiment and analysis. Particularly, diagnostic tests and engineering studies are required for qualification of ASME QME-1 2007. Among these studies, the research on the measurement of friction coefficient and packing stress is important. The irregular change of packing stress along the stroke distance occurs because of the abnormal phenomenon, which must be found and studied with quantitative methods. Packing stress should be analyzed conservatively through experimentation and analysis. In this study, various formulas were applied to measure and calculate coefficient of friction and packing stress. This study can be used in relation to qualification and supervision of packing materials. And the calculation using static diagnosis test can be used to find the packing frictional force in dynamic diagnosis test with flow pressure in a pipe. This study has made it possible to reliably consider packing frictional force generated in a valve body. And so, it is believed that more margin can be secured when evaluating the capacity of valve actuator by applying the accurate frictional force generated in the valve assembly.
The Transactions of The Korean Institute of Electrical Engineers
/
v.59
no.2
/
pp.397-406
/
2010
Because diesel generator excitation systems in the nuclear power generating station are included among safety related c1asses(and Class 1E), they have been supposed to apply in the nuclear power generating stations through equipment qualification by nuclear law and so on. So, they has been controlled and assured completely by quality assurance throughout the total development journey. This paper looks into the journey of development of diesel generator excitation systems in the nuclear power generating station.
Testing evaluation is a part of process for design, production, evaluation, operation and abolition, and is the process of certifying system performance. The main purpose of testing evaluation is to reduce the risk factor under the determining process. Testing process has the three step such as design qualification, integration and validation test in factory, system integration and commissioning test. Design Qualification is to verify errors on the design process. Integration and validation test in factory is for the H/W and S/W of an equipment and is to verify interface of subsystem, communication protocol and main functions. System integration and commissioning test is a functional test to adjust successful installation of equipment. According to the testing process, briefly consideration for test item, test method and test contents about signalling system is carried out.
Journal of the Korean Society of Industry Convergence
/
v.22
no.6
/
pp.627-635
/
2019
In this study, we developed for processing complex features using CAM software that satisfies precision for example practice and related qualification tests suiTable for CNC training purposes. In addition, functions such as location control, speed control, and processing path generation, which are the main functions of CNC machining machines, were constructed using small equipment parts, servo motors, inverters, general purpose PCs, and commercial NC software and researched with the goal of developing low-cost education equipment. In the static accuracy inspection, the degree of machine when measuring the parallelism of the X, Y and Z axes and the vibration of the main shaft did not reach the allowable value. However, we have obtained a finished product that satisfies the CNC machine book sample shape machining, detailed functions of the position control function of the CNC machine tool, linear interpolation function, circular interpolation function, and tool offset function. In the qualification test shape processing, a shape with a degree of 1/100 mm was processed to obtain position accuracy that satisfied the tolerance.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.