• Title/Summary/Keyword: Equipment operation

Search Result 2,336, Processing Time 0.029 seconds

A Study on Decision-making of Equipment Procurement for Plant Operations & Maintenance (O&M) - Focused on Technology Strategy perspective - (플랜트 O&M을 위한 기자재 조달방식 의사결정에 관한 연구 - 기술전략 관점을 중심으로 -)

  • Hong, Daegeun;Lim, Yongtaek
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.15 no.1
    • /
    • pp.25-33
    • /
    • 2019
  • In the plant industry, the share of equipment accounts for 45 ~ 75%, which is very high. It is a traditional plant centered on processes and reactions like petroleum and chemical plants. Renewable energy generation plants such as wind power generation and solar power generation are equipment-centric plants. Equipment-centric plants are very important not only in the EPC phase but also in the operation and management phase. The procurement of equipment for plant operation and management can be divided into make and buy. Make is a method of producing equipment itself, and buy is a method of procuring equipment from the outside. The procurement method of the equipment directly affects the plant operation and management cost. In this study, the decision making of equipment procurement method for plant operation and management is defined as 4 phase. Each phase is selection of procurement decision-making objects, technology strategy perspective, finance perspective, and production perspective. In detail, we defined selection process of procurement decision-making objects and technology strategy perspective process. We will contribute to the enhancement of the competitiveness of the plant operation and management area by carrying out researches on the process and application examples of financial and production perspectives in the future.

The study on factor and model through error analysis to equipment operation (Focused on the Semiconductor industry) (설비 운영의 에러 분석을 통한 인자 및 모델연구 -반도체 산업중심-)

  • Yoon, Yong-Gu;Park, Peom
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2009.11a
    • /
    • pp.187-201
    • /
    • 2009
  • Semiconductor industry is based on equipment industry and timing industry. In particular, semiconductor process is very complex and as semiconductor-chip width tails and is becoming equipment gradually more as a high technology. Equipment operation is primarily engaged in semiconductor manufacturing (engineers and operator) of being conducted by, equipment errors have also been raised. Equipment operational data related to the error of korea occupational safety and health agency were based on data and production engineers involved in the operator's questionnaire was drawn through the error factor. Equipment operating in the error factor of 9 big item and 36 detail item detailed argument based on the errors down, and 9 big item the equipment during operation of the correlation error factor was conducted. Each of the significance level was correlated with the tabulation and analysis. Using the maximum correlation coefficient, the correlation between the error factors to derive the relationship between factors were analyzed. Facility operating with the analysis of error factors (big and detail item) derive a relationship between the model saw. The end of the operation of the facility in operation on the part of the two factors appeared as prevention. Safety aspects and ergonomics aspects of the approach should be guided to the conclusion.

  • PDF

Analysis of Interference Elements for the Integrated Equipment Operation in Tall Building Construction (초고층 골조공사의 통합 장비 운영을 위한 장비 간의 간섭요소 분석)

  • Lee, Dongyoon;Lim, Hyunsu;Kim, Baek-Joong;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.173-175
    • /
    • 2013
  • In tall building construction, the equipment operation plans have an effect on productivity. Equipment, used in tall building construction, has operating plans of each it and restrictively operate owing to the first placed equipment operation. Therefore the interference of equipment was occur frequently. As it, the productivity is less effective and the construction delay occurs. This research was analysis the interference elements between the equipment for constructing the efficient equipment associated operational processes. The interference elements between the equipment derive through expert advice and analysis using IPA. Through the IPA, this research deducted the interference elements located 'Concentrate Here' which is the highest importance and the lowest performance.

  • PDF

Optimization of Earthwork Operation for Energy-saving using Discrete Event Simulation

  • Yi, Chang-Yong;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.537-539
    • /
    • 2015
  • considerate operation is a major issue in the equipment-intensive operation. Identifying an optimal equipment combination is important to achieve low-energy operations. An Earthwork operation planning system, which measures the energy consumption of construction operations by taking into account construction equipments' engineering attributes (e.g., weight, capacity, energy consumption rate, etc.) and operation conditions (e.g., road condition, attributes of materials to be moved, geometric information, etc.), is essential to achieve the low-energy consumption. This study develops an automated computerized system which identifies an optimal earthmoving equipment fleet minimizing the energy consumption. The system imports a standard template of earthmoving operation model and compares numerous scenarios using alternative equipment allocation plans. It finds the fleet that minimizes the energy consumption by enumerating all cases using sensitivity analysis. A case study is presented to verify the validity of the system.

  • PDF

Exploration on Reform of Railway Transportation Management System Based on Separating Train Operation with Rail Equipment Management

  • Yu, Jie-Min
    • Proceedings of the KOR-KST Conference
    • /
    • 1998.09a
    • /
    • pp.36-42
    • /
    • 1998
  • This article analyzes Chinese railways transportation management system, uses the experiences of other countries' railway transportation management system for reference, as well as discusses the necessity of reform of railway transportation management system based on separating train operation with rail equipment management. Moreover, the article also puts forward an imagination on the reform scheme of railway transportation management system based on separating train operation with rail equipment management.

  • PDF

Optimum Allocation Model of Military Engineer Equipments for Artillery Position Development (포병진지 구축을 위한 공병장비 최적배정 모형)

  • Jang, Young Cho;Lee, Moon Gul
    • Korean Management Science Review
    • /
    • v.34 no.2
    • /
    • pp.103-113
    • /
    • 2017
  • The artillery is a key element of the ground forces operation during wartime, and the military engineers support the artillery position development operation to support the smooth operation of the artillery. In establishing the artillery position development operation plan, the commander requires more than his intuition to find the best option reflecting a number of elements of the battlefield situation which changes every minute. Moreover, the number of available equipment is smaller than the number of required position developments, and the effective equipment operation becomes essential element of this issue. This study quantified the capability of the available engineering equipment, organized a number of teams enabling equipment to put out the maximum capacity based on the quantified figures, and formed the model which allocates the team to the developing points to minimize the developing time. The goal programming method was applied to resolve the problem. The developed model was applied to compare the total mission duration following the number of teams, the variable for commander's decision, and the result of this study can be used as the quantitative data for commander's decision making process in establishing the artillery position development support operation through effective equipment management.

Construction Equipment Fleet Optimization for Saving Fuel Consumption (에너지 절감을 위한 건설장비 조합 최적화 방법 연구)

  • Yi, Chang-Yong;Lee, Hong-Chul;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.198-199
    • /
    • 2015
  • Construction equipment is a major energy consumption source in construction projects. If 10% reduction of the diesel fuel usage is achieved in the construction industry, it may reduce 5% of the total energy usage. Energy saving operation is a major issue in equipment-intensive operations (e.g., earthmoving or paving operations). Identifying optimal equipment fleet is important measure to achieve low-energy consumption in those operations. This study presents a system which finds an optimal equipment fleet by computing the low-energy performance of earthmoving operations. It establishes construction operation model and compares numerous combinations using alternative equipment allocation plans. It implements sensitivity analysis that facilitates searching the lowest energy consumption equipment fleet by enumerating all cases.

  • PDF

A Study on the Body Welding Operation Scheduling Considering the Assembly Line's Input Sequence in Construction Equipment Manufacturing (건설기계 조립 라인 투입 순서를 고려한 제관 공정 생산 스케줄링에 관한 연구)

  • Kim, Ki-Dong;Choi, Ho-Sik
    • Journal of Industrial Technology
    • /
    • v.27 no.A
    • /
    • pp.69-76
    • /
    • 2007
  • The body of an excavator, one sort of the construction equipment, consists of mainframe part, track frame part, boom part and arm part. The all parts are manufactured in the body welding operation. The scheduling in the body welding operation of a construction equipment manufacturing is to take all the various constraints into consideration. The offset time, due date, daily capacity of operations, daily jig's capacity, precedence relation, outsourcing, alternative resource and all of the shop floor environment should be considered. An APS(Advanced Planning & Scheduling) system is a proper and efficient system in such circumstance. In this paper, we present an APS system, the optimal scheduling system for the construction equipment manufacturing specifically for the body welding operation, using ILOG Solver/Scheduler. ILOG Solver/Scheduler is a general purposed commercial software which supports to find a feasible or optimal solution using object oriented technique and constraints satisfaction programming, given constraints and objectives.

  • PDF

Survey Study of Optimal Cooling Equipment Capacity of the Large Hospitals in Busan City (부산지역 대형병원 냉방장비의 용량설정 실태조사)

  • Lee, Ji-Weon;Chin, Kyung-Il;Kim, Se-Hwan
    • KIEAE Journal
    • /
    • v.14 no.6
    • /
    • pp.105-110
    • /
    • 2014
  • The basic factors determining the amount of energy used in hospital buildings are weather conditions and building factors. But the real energy consumer is central plant equipment such as boilers and chillers that produce thermal energy for heating and cooling. Inaccurate decision of the primary equipment's size can cause a high initial-cost, an excessive equipment space, a wasted energy by low operation-efficiency and shortening of the machine's life. In this reason, the decision of optimal size for central plant equipment is very important. There are several factors for the decision such as an operation factor, a factor (equipment factor), piping losses and a simultaneous usage factor applied in the sizing process except a basic cooling load. But there is no standard method for applying those factors. Usually, factors are applied individually by an experience or custom of each engineer. In this study, the authors emphasize the meaning and the problem of those factors, examine them by analyzing factors which were applied to actual practices, and propose the recommendation value of safety, load, operation factors and application methods.

Virtual Analysis of the Remote Operation of the ACP

  • Yoon Ji sup;Kim Sung Hyun;Song Tai Gil;Lim Kwang-Mook
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2005.11b
    • /
    • pp.60-75
    • /
    • 2005
  • The remote operation of the Advanced Spent Fuel Conditioning Process (ACP) is analyzed by using the 3D graphic simulation tools. The ACP equipment operates in intense radiation fields as well as in a high temperature. Thus, the equipment should be designed in consideration of the remote handling and maintenance. As well as suitable remote handling and maintenance method needs to be provided. To provide such remote operation technology, we developed the graphic simulator which provides the capability of verifying the remote operability of the ACP without fabrication of the process equipment. In other words, by applying virtual reality to the remote maintenance operation, a remote operation task can be simulated in a computer, not in a real environment. In this way the graphic simulator can substantially reduce the design cost of the remote operation process and the equipment. Also it can provide new operation concept that is more reliable, easier to implement, and easier to understand.

  • PDF