• 제목/요약/키워드: Equipment Procurement

검색결과 61건 처리시간 0.034초

가공송전선로 폴리머애자 적용 개선 방안 (The Application Improvement Plan of Polymer Insulators for Overhead Transmission Lines)

  • 민병욱;김태영;최진성;신승범;이시영;원경배
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.465-466
    • /
    • 2011
  • The global trend is to make transmission lines light weight and compact by using insulators and other equipment made of advanced materials. In Korea, the diversification of insulators supply route has begun in order to obtain price competitiveness. In May 1999, polymer insulators were finally introduced for the first time and installed to the 154kV transmission lines. After that, the construction and procurement standards were made and domestic polymer insulators were developed. And then, foreign and domestic manufacturers were registered in KEPCO as qualified insulator suppliers. As of 2010, purchasing polymer insulators by competitive bidding from foreign and domestic manufacturers has been possible. For this reason, it was decided to reduce the use of porcelain insulators and increase the use of polymer insulators taking the installation price into consideration

  • PDF

THE PERFOMANCE OF GROUNDBASE MOBILE PLATFORM FOR C-BAND MICROWAVE SCATTEROMETER SYSTEM

  • Aziz H.;Mahmood N.N.;Ali A.;Jamil H.;Mahmood K.A.;Ahmad Z.;Ibrahim N.;Brevern P.V.;Chuah H.T.;Koo V.C.;Sing L.X.
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2004년도 Proceedings of ISRS 2004
    • /
    • pp.61-63
    • /
    • 2004
  • The procurement of a mobile microwave scatterometer platform involved the consideration to ensure a mobile platform and equipment selected full-filled technical requirement and safety standard in Malaysia. Designing, and modification works involved engineering methodology in determining and selecting a suitable hydraulic telescopic boom that suit a selected mobile platform available locally. The mobile platform is a delivery system for microwave remote sensing microwave scatterometer and other accessories to any locations in Malaysia. Total loading to be carried by the mobile platform is 4500 kg and its overall weight must be 16,000 kg as recommended by hydraulic telescopic boom manufacturers. The telescopic boom will elevate microwave scatterometer system including the antenna to a maximum height of 27 m, and can also be rotated through $3600^{\circ}$. A mechanism is incorporated in the system to enable tracking or monitoring angular movement of the hydraulic telescopic boom when positioned towards predetermined target.

  • PDF

Basic Study on the Assembly Process Design of Curtain-wall System for Minimization of Carbon Emission

  • Yi, June-Seong
    • 한국건축시공학회지
    • /
    • 제12권6호
    • /
    • pp.648-663
    • /
    • 2012
  • With recent attempts to improve quality and productivity, the prefabrication manufacturing system has been occupying an increasing share of the construction area. To minimize site work, material is more frequently being produced and partially assembled at a plant, and then installed at a site. For this reason, the production process is being divided and the materials are being delivered to the site after passing through multiple plants. With these changes in the production process, the materials delivery plan is becoming an important management point. In particular, as road transportation using trucks has a 71 percent share of the domestic transportation market, selecting the proper transportation path is important when delivering materials and equipment to a site. But the management system at the project design phase to calculate the delivery cost by considering the production process of the pre-fab material and the $CO_2$ emission at the material delivery phase is currently lacking. This study suggests a process design model for assembly production of the pre-fab material and transportation logistics based on carbon emission. The suggested model can be helpful to optimize the location of the intermediate plant. It is expected to be utilized as a basic model at the project plan and design phase when subcontractors make decisions on items such as materials procurement, selecting the production method, and choosing the location of the assembly plant.

운용가용도 제약하에서 동류전용이 허용될 때 소모성 동시조달부품의 적정구매량 결정 (Provisioning Quantity Determination of Consumable Concurrent Spare Part Under Availability Constraint and Cannibalization Allowed)

  • 오근태;나윤균;김명수
    • 산업경영시스템학회지
    • /
    • 제33권3호
    • /
    • pp.199-207
    • /
    • 2010
  • In this paper considered is the provisioning quantity determination problem of consumable concurrent spare parts (CSP) of a new equipment system to minimize the procurement cost under the operational availability constraint. When a part fails, repair of the failed part is impossible and the part is replaced and cannibalization is allowed. The failure of a part is assumed to follow a Poisson process and the operational availability in CSP is defined. The solution procedure consists of two parts. Firstly, a heuristic algorithm is developed under the assumption that the failure rate is constant during the CSP period. Secondly, proposed is a simulation search procedure which improves the heuristic solution to the near optimal solution in a reasonable amount of time. An illustrative example is shown to explain the solution procedure.

Development of Head-cook's Education and Training Curriculum by Analyzing Job Characteristics and Competencies in Contract Foodservice Management Company

  • Cha, Jin-A;Park, Moon-Kyung;Shin, Jeong-Hoon;Yang, Il-Sun
    • Nutritional Sciences
    • /
    • 제9권2호
    • /
    • pp.131-138
    • /
    • 2006
  • The primary purpose of this study was to investigate the job characteristics and competencies of a head-cook in contracted foodservice management company, identify the knowledge, abilities, skills and other characteristics (KASO) required to perform the duties of a head-cook, and provide training content and develop training program for job of head-cook in contract foodservice management company (CFMC). A survey instrument including identified KASO was used in the study. The questionnaire was delivered by using e-mail to 165 head-cooks employed by CFMC. The factor analysis resulted in a three-factor structure of the instrument such as 'basic foodservice operation duties' 'personal characteristics' 'managing of expanded duties-menu, customer and business'. This result suggested the education and training program for head-cook in CFMC should be composed of 'basic foodservice operation duties' on 'bulk preparation', 'procurement, inventory management', 'facility and equipment management', and 'sanitation and safety management', 'personal characteristics' on 'personality management' and 'moral duties', and 'managing of expanded duties-menu, customer and business' on 'menu management', 'customer service management', 'cost management', and 'administrative ability'. Therefore, it will be expected that the management of human resources in the contract foodservice industry would be developed by the application of recommended education and training program.

설계단계에서 적정 기계설비 공사비 산정을 위한 BIM 정보표현수준(BIL) 개선안 (A Proposal of BIL for Reasonable Cost Estimation of Mechanical Contracts and Construction in Design Phases)

  • 박보성;김선혜
    • 설비공학논문집
    • /
    • 제29권12호
    • /
    • pp.663-672
    • /
    • 2017
  • Building information modeling (BIM) technology based on 3D modeling has been applied to the entire domestic construction industry since 2010. It can calculate quantity take-off considering construction productivity at design phase. Based on this, it is possible to improve the reliability of construction cost prediction of design phase in the process of cost estimation. However, Building Information Level (BIL) defined by Ministry of Land, Infrastructure and Transport and Public Procurement Service does not seem to offer doable environment due to the lack of detailed application items. By calculating construction cost that meets Construction Cost Estimate Accuracy by American Association of Cost Engineers (AACE) through quantity take-off and cost estimation based on 3D modeling of BIM technology, a BIL improvement proposal at design phase for Mechanical Contracts and Construction is provided here. Results showed that properties including outline and minimum specification of the main equipment, internal main piping, and internal main duct should be defined from the intermediate design phase to have reliable cost estimation.

공급망 재고관리시스템의 의사결정모형 (Decision-making Model of Supply Chain Inventory Management System)

  • 진금회;남수태;진찬용
    • 한국정보통신학회:학술대회논문집
    • /
    • 한국정보통신학회 2021년도 춘계학술대회
    • /
    • pp.157-158
    • /
    • 2021
  • 공급망의 빅데이터는 주로 네 가지 측면에서 발생된다. 하나는 생산 장비 품질 데이터, 계획된 조달 데이터, 제품 데이터 등과 같은 공급망에서 기업의 제품 가치 이전 과정에서 불가피하게 생성되는 관련 데이터이고, 두 번째는 공급망에 있는 다양한 회사의 ERP 데이터에서 파생된다. 세 번째는 고객의 전자 상거래 데이터이고 마지막은 외부 또는 수동으로 입력한 데이터의 데이터이다. 따라서 본 연구를 통해서 공급망 운영 과정에서 재고를 예측하고 제어하기 위해 타사 데이터 서비스 센터 분석 및 데이터 마이닝. 그것은 여러 측면에서 전체 공급망에 혁신과 관리 기술 및 사고방식의 변화를 가져오고 마침내 전체 공급망의 재고 조정 및 제로 재고 목표를 달성하게 된다.

  • PDF

부품단종에 대한 조사·분석 및 관리방안 (DMSMS Management Survey and Analysis Method)

  • 정현우;심보현
    • 한국산학기술학회논문지
    • /
    • 제21권5호
    • /
    • pp.257-265
    • /
    • 2020
  • 무기체계를 구성하는 원자재 또는 부품이 수요에 따라 개발이 되어 생산되다가 기술의 발전 또는 시장 상황의 변화에 따라 노후화가 진행되어 생산이 중단되는 경우를 부품단종이라 한다. 현재 우리 군이 사용 중인 무기체계의 장비들은 부품단종으로 인해 조달, 정비, 운용 등에 어려움을 겪고 있다. 무기체계의 수명주기 기간 중 발생하는 부품단종 문제는 소요군 뿐만 아니라 장비, 부품, 원자재의 제조자 및 공급자에게 경제적인 손실과 무기체계 전투태세 준비에 영향을 미친다. 그러나 첨단기술의 발전으로 무기체계를 구성하는 전자부품의 수명은 점점 단축되고 있다. 또한 무기체계의 특성상 개발부터 폐기에 이르기까지 수십 년이 소요됨에 따라 부품단종이 발생하게 되고, 이는 무기체계 장비의 전투 준비태세와 수명주기 비용에 심각한 악영향을 미친다. 따라서 무기체계 장비의 개발에서부터 폐기까지의 총 수명주기에 부품단종을 체계적으로 관리하는 것이 필요하다. 본 연구에서는 선진국의 부품단종 관리 제도를 분석하여 국내 실정에 맞는 부품단종 관리방안을 제시하고, 나아가 부품단종 관리의 조기 정착을 위한 발전 방안을 제시하고자 한다.

돌관공사 시나리오 기반 공기-비용 최적화 모델 개발 (Development of Time-Cost Trade-Off model Based on Emergency Construction Work Scenario)

  • 이시현;이승현;손재호
    • 한국건설관리학회논문집
    • /
    • 제17권3호
    • /
    • pp.43-51
    • /
    • 2016
  • 최근 건설공사의 규모와 복잡성이 현저하게 증가함에 따라 건설비용이 상승하게 되었다. 많은 건설공사가 날씨, 노동력 공급, 장비 구매, 사고 등과 같은 다양한 요소들로 인하여 당초 계획했던 공사기일 내에 완공되지 못하고 있다. 계획된 시간 내에 공사를 완공하기 위하여 돌관공사를 시행하여야 한다. 하지만 돌관공사를 위한 결정들이 현장 소장들의 경험에만 의지하고 있는 실정이다. 그러므로 이 논문은 작업조의 투입과 작업시간의 조합으로 생길 수 있는 다양한 돌관공사 시나리오 중 최적의 대안을 선정할 수 있는 TCTO 모델을 제안하고자 한다. 개발된 모델은 실무적인 제약조건을 만족시키는 최적의 공정계획을 제공할 수 있다. 더 나아가서 제안된 모델에 자원평준기능을 포함하게 되면 보다 실용적인 모델이 될 수 있을 것으로 예상된다.

시공단계의 건설정보 통합을 위한 분류체계 적용에 관한 연구 (A Study on the Application of Information Classification for Integration of Construction Information in Construction Phase)

  • 김진영;김용구;한충희;김선국
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.450-455
    • /
    • 2002
  • 21세기 정보화시대에 접어들면서 모든 산업은 정보화와 지식화의 변화 속에서 변화와 발전을 모색하고 있으며 국제경쟁력을 강화하기 위해서 우리나라도 국가경영전략으로 정보화와 지식화를 채택하기에 이르렀다. 특히, 건설업은 그 특성상 프로젝트의 생애주기 동안 다수의 참여주체들에 의해 수많은 양의 정보가 발생되며 이러한 정보들을 효과적으로 관리하고 활용하는 것이 성공적인 프로젝트 수행을 위해 매우 중요하다. 하지만 이러한 정보의 체계적인 관리를 위한 기준인 분류체계의 부재로 인해 많은 정보들이 사라지거나 중복됨으로써 업무의 생산성과 효율성을 저해하고 있다. 따라서 본 연구에서는 기 제시된 건설교통부의 통합건설분류체계와 수량산출기준서, 기타 관련분류체계를 근간으로 시공단계의 건설정보에 적용해 봄으로써 분류체계의 활용화 방안을 제시하고자 한다.

  • PDF