• Title/Summary/Keyword: Equipment Procurement

Search Result 61, Processing Time 0.033 seconds

The Application Improvement Plan of Polymer Insulators for Overhead Transmission Lines (가공송전선로 폴리머애자 적용 개선 방안)

  • Min, Byeong-Wook;Kim, Tai-Young;Choi, Jin-Sung;Shin, Seung-Bum;Lee, Si-Young;Won, Gyeong-Bae
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.465-466
    • /
    • 2011
  • The global trend is to make transmission lines light weight and compact by using insulators and other equipment made of advanced materials. In Korea, the diversification of insulators supply route has begun in order to obtain price competitiveness. In May 1999, polymer insulators were finally introduced for the first time and installed to the 154kV transmission lines. After that, the construction and procurement standards were made and domestic polymer insulators were developed. And then, foreign and domestic manufacturers were registered in KEPCO as qualified insulator suppliers. As of 2010, purchasing polymer insulators by competitive bidding from foreign and domestic manufacturers has been possible. For this reason, it was decided to reduce the use of porcelain insulators and increase the use of polymer insulators taking the installation price into consideration

  • PDF

THE PERFOMANCE OF GROUNDBASE MOBILE PLATFORM FOR C-BAND MICROWAVE SCATTEROMETER SYSTEM

  • Aziz H.;Mahmood N.N.;Ali A.;Jamil H.;Mahmood K.A.;Ahmad Z.;Ibrahim N.;Brevern P.V.;Chuah H.T.;Koo V.C.;Sing L.X.
    • Proceedings of the KSRS Conference
    • /
    • 2004.10a
    • /
    • pp.61-63
    • /
    • 2004
  • The procurement of a mobile microwave scatterometer platform involved the consideration to ensure a mobile platform and equipment selected full-filled technical requirement and safety standard in Malaysia. Designing, and modification works involved engineering methodology in determining and selecting a suitable hydraulic telescopic boom that suit a selected mobile platform available locally. The mobile platform is a delivery system for microwave remote sensing microwave scatterometer and other accessories to any locations in Malaysia. Total loading to be carried by the mobile platform is 4500 kg and its overall weight must be 16,000 kg as recommended by hydraulic telescopic boom manufacturers. The telescopic boom will elevate microwave scatterometer system including the antenna to a maximum height of 27 m, and can also be rotated through $3600^{\circ}$. A mechanism is incorporated in the system to enable tracking or monitoring angular movement of the hydraulic telescopic boom when positioned towards predetermined target.

  • PDF

Basic Study on the Assembly Process Design of Curtain-wall System for Minimization of Carbon Emission

  • Yi, June-Seong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.648-663
    • /
    • 2012
  • With recent attempts to improve quality and productivity, the prefabrication manufacturing system has been occupying an increasing share of the construction area. To minimize site work, material is more frequently being produced and partially assembled at a plant, and then installed at a site. For this reason, the production process is being divided and the materials are being delivered to the site after passing through multiple plants. With these changes in the production process, the materials delivery plan is becoming an important management point. In particular, as road transportation using trucks has a 71 percent share of the domestic transportation market, selecting the proper transportation path is important when delivering materials and equipment to a site. But the management system at the project design phase to calculate the delivery cost by considering the production process of the pre-fab material and the $CO_2$ emission at the material delivery phase is currently lacking. This study suggests a process design model for assembly production of the pre-fab material and transportation logistics based on carbon emission. The suggested model can be helpful to optimize the location of the intermediate plant. It is expected to be utilized as a basic model at the project plan and design phase when subcontractors make decisions on items such as materials procurement, selecting the production method, and choosing the location of the assembly plant.

Provisioning Quantity Determination of Consumable Concurrent Spare Part Under Availability Constraint and Cannibalization Allowed (운용가용도 제약하에서 동류전용이 허용될 때 소모성 동시조달부품의 적정구매량 결정)

  • Oh, Geun-Tae;Na, Yoon-Kyoon;Kim, Myung-Soo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.3
    • /
    • pp.199-207
    • /
    • 2010
  • In this paper considered is the provisioning quantity determination problem of consumable concurrent spare parts (CSP) of a new equipment system to minimize the procurement cost under the operational availability constraint. When a part fails, repair of the failed part is impossible and the part is replaced and cannibalization is allowed. The failure of a part is assumed to follow a Poisson process and the operational availability in CSP is defined. The solution procedure consists of two parts. Firstly, a heuristic algorithm is developed under the assumption that the failure rate is constant during the CSP period. Secondly, proposed is a simulation search procedure which improves the heuristic solution to the near optimal solution in a reasonable amount of time. An illustrative example is shown to explain the solution procedure.

Development of Head-cook's Education and Training Curriculum by Analyzing Job Characteristics and Competencies in Contract Foodservice Management Company

  • Cha, Jin-A;Park, Moon-Kyung;Shin, Jeong-Hoon;Yang, Il-Sun
    • Nutritional Sciences
    • /
    • v.9 no.2
    • /
    • pp.131-138
    • /
    • 2006
  • The primary purpose of this study was to investigate the job characteristics and competencies of a head-cook in contracted foodservice management company, identify the knowledge, abilities, skills and other characteristics (KASO) required to perform the duties of a head-cook, and provide training content and develop training program for job of head-cook in contract foodservice management company (CFMC). A survey instrument including identified KASO was used in the study. The questionnaire was delivered by using e-mail to 165 head-cooks employed by CFMC. The factor analysis resulted in a three-factor structure of the instrument such as 'basic foodservice operation duties' 'personal characteristics' 'managing of expanded duties-menu, customer and business'. This result suggested the education and training program for head-cook in CFMC should be composed of 'basic foodservice operation duties' on 'bulk preparation', 'procurement, inventory management', 'facility and equipment management', and 'sanitation and safety management', 'personal characteristics' on 'personality management' and 'moral duties', and 'managing of expanded duties-menu, customer and business' on 'menu management', 'customer service management', 'cost management', and 'administrative ability'. Therefore, it will be expected that the management of human resources in the contract foodservice industry would be developed by the application of recommended education and training program.

A Proposal of BIL for Reasonable Cost Estimation of Mechanical Contracts and Construction in Design Phases (설계단계에서 적정 기계설비 공사비 산정을 위한 BIM 정보표현수준(BIL) 개선안)

  • Park, Bo Sung;Kim, Sean Hay
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.29 no.12
    • /
    • pp.663-672
    • /
    • 2017
  • Building information modeling (BIM) technology based on 3D modeling has been applied to the entire domestic construction industry since 2010. It can calculate quantity take-off considering construction productivity at design phase. Based on this, it is possible to improve the reliability of construction cost prediction of design phase in the process of cost estimation. However, Building Information Level (BIL) defined by Ministry of Land, Infrastructure and Transport and Public Procurement Service does not seem to offer doable environment due to the lack of detailed application items. By calculating construction cost that meets Construction Cost Estimate Accuracy by American Association of Cost Engineers (AACE) through quantity take-off and cost estimation based on 3D modeling of BIM technology, a BIL improvement proposal at design phase for Mechanical Contracts and Construction is provided here. Results showed that properties including outline and minimum specification of the main equipment, internal main piping, and internal main duct should be defined from the intermediate design phase to have reliable cost estimation.

Decision-making Model of Supply Chain Inventory Management System (공급망 재고관리시스템의 의사결정모형)

  • Chen, Jinhui;Nam, Soo-tae;Jin, Chan-yong
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2021.05a
    • /
    • pp.157-158
    • /
    • 2021
  • Big data in the supply chain mainly comes from four aspects. One is the relevant data inevitably generated in the process of product value transfer of enterprises in the supply chain, such as production equipment quality data, planned procurement data, product data, etc; On the other hand, it is derived from the ERP data of various companies in the supply chain; The third is e-commerce data from the customer, and the last is data from external or manually entered data. A third-party data service center analysis and mining the data to predict and control the inventory in the process of supply chain operation. It brings innovation and change of management technology and way of thinking to the whole supply chain in many aspects, and finally achieves the goal of coordinated inventory and zero inventory of the whole supply chain.

  • PDF

DMSMS Management Survey and Analysis Method (부품단종에 대한 조사·분석 및 관리방안)

  • Jung, Hyun-Woo;Shim, Bo-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.5
    • /
    • pp.257-265
    • /
    • 2020
  • Parts obsolescence is a component type, in which raw materials or parts that make up a weapons system, are developed and produced according to demand, but they age due to changes in technology or market conditions. The weapon system equipment currently being used by the military is having difficulty in procurement, maintenance, and operation because of the obsolescence of parts. Parts obsolescence during the life cycle of a weapons system affects not only the combat readiness of the military but also the economic loss of material, parts, and equipment manufacturers and suppliers. On the other hand, advanced technology has reduced the life span of electronic components that make up the weapons system. In addition, because of the nature of the weapons system, the obsolescence of components takes decades from development to disposal, which has a serious adverse effect on equipment readiness and life cycle costs. Therefore, it is necessary to manage systematically the parts obsolescence from development until the disposal of the weapons system equipment. This study examined the system of component control in developed countries to present a proper management plan for local situations and propose development plans for the early settlement of component control.

Development of Time-Cost Trade-Off model Based on Emergency Construction Work Scenario (돌관공사 시나리오 기반 공기-비용 최적화 모델 개발)

  • Lee, Sihyun;Lee, Seounghyun;Son, Jaeho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.43-51
    • /
    • 2016
  • Recently, the cost of construction projects has escalated due to a significant increase in size and complexity. Many construction projects have failed to meet their originally intended project deadline due to various factors such as weather, labor supply, equipment, procurement, accidents, etc. Consequently, emergency construction work scenario has to be implemented in order to shorten the duration and satisfy the original estimated schedule. However, many critical decisions in emergency scenario rely solely on the experience of a construction manager. Thus, this paper proposes TCTO optimization model to decide the most effective alternative out of various working scenarios which are generated by the combination of work group and work time. The developed TCTO model provides the optimum schedule that satisfies the practical constraints. Future research could involve the integration of resource leveling with the proposed model. This would make the model more versatile.

A Study on the Application of Information Classification for Integration of Construction Information in Construction Phase (시공단계의 건설정보 통합을 위한 분류체계 적용에 관한 연구)

  • Kim Jin-Young;Kim Yong-Gu;Han Choong-Hee;Kim Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.450-455
    • /
    • 2002
  • Construction market situation has been changed quickly in the 21st century. One is a large variety of information, the other is the development of IT technology among the rest of the change. Accordingly, it is very important that information is managed systematically and made good use of broadly in proportion to the increase of information volume. Therefore, the purpose of this study is to propose a applicable classification system in the construction phase. First of all, the Construction Information Classification proposed by the government is studied to apply the actual work and to build a applicable construction information classification for construction project. A base of the applicable classification system is the Construction Information Classification, SMM and Materials classification(Public Procurement Service). The applicable classification system to control and manage the construction information is consist of the 4 types : Facility classification, Element classification, Work classification, Resource classification (Materials, Equipment, Labor).

  • PDF