• Title/Summary/Keyword: Environmental management cost

Search Result 889, Processing Time 0.029 seconds

Development of a Cost-benefit Model for the Management of Structural Risk on Oil Facilities in Mexico

  • Leon, David-De;Alfredo H-S. Ang
    • Computational Structural Engineering : An International Journal
    • /
    • v.2 no.1
    • /
    • pp.19-23
    • /
    • 2002
  • A reliability-based cost-benefit model for the risk management of oil platforms in the formulation of optimal decisions based on life-cycle consideration is proposed. The model is based on structural risk assessments and the integration of social issues and economics into the management decision process. Structural risks result from the platform's exposure to the random environmental loading associated with the offshore site where it is located. Several alternative designs of a typical platform are proposed and assessed from the cost-effectiveness viewpoint. This assessment is performed through the generation of cost/benefit relationships that are used, later on, to select the optimal design.

  • PDF

Estimating Maintenance Cost by Actual Database Based on Operation in Sewage Treatment Plant (하수처리장 실적데이터베이스를 활용한 유지관리비용 예측)

  • Lee, Tai-Sik;Kwak, Dong-Koo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.10
    • /
    • pp.2803-2809
    • /
    • 2009
  • For a successful construction project not only construction engineering and project management technology but also economic evaluation technique is required. Design and construction technologies are necessary to receive a project order. However, construction management technology which can be apply from the project initial phase to the project operation and management phase is required to create a benefit from the project. Construction management technology is one of the effective factors for project success. Economical and efficient cost management from the planning phase influences the project success. This study investigated cost flow and cost factors of domestic Sewage Treatment Plant project for systematic analysis of cost items following the entire project phase. Particularly, data modeling based on domestic Sewage Treatment Equipment maintenance cost DB was performed, and maintenance cost estimation trend line is suggested using Monte carlo Simulation Method to decrease uncertainty of actual results DB and for feasibility study. Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society.

A Descriptive Analysis of Project Participants' Perception about Complaint in Public Construction Projects

  • Lee, Changjun;Lee, Ju-Hui;Yun, Sungmin;Han, Seung Heon
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.111-118
    • /
    • 2022
  • Conflicts in public construction projects become more serious and complex so that they have a negative effect on performance of projecets. Conflicts in public construction projects are defined as expanding in complaints. This study analyzes the relationship structure and effect on performance between complaints and conflicts. First of all, 219 survey data collected from industry experts were used to derive complaints arising from the project and to understand the characteristics of each complaint. In the case of environmental damages, rather than environmental damage during construction, harmful substances or effects that can occur in completed facilities cause complaints from local residents, and opposition from environmental groups has a great effect on time and cost increase. As for safety damage, civil complaints related to prevention and countermeasures for safety accidents occur frequently, and additional construction affects cost increases. Through this study, it is possible to understand the serious complaints that are prone to conflict in public construction projects, their frequency, and the performance of the project.

  • PDF

Cost and Schedule Analysis of Highway Projects based on Project Types

  • Shrestha, Bandana;Shrestha, Pramen P.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.50-56
    • /
    • 2022
  • Change Orders generally impact cost and schedule performance of highway projects. However, highway projects that do not have any change orders also face cost growth and schedule delays. This study seeks to determine the cost and schedule performance of Texas DOT projects by collecting project data for 120 highway projects completed between 2016 to 2020. For the study, we selected project data that has zero or negative change orders which were then grouped and analyzed based on their Project Types i.e., maintenance works; structural works; restoration and rehabilitation works; and safety works. The study found that performance of Maintenance and Safety type projects had less cost and schedule growth among the data analyzed. Statistical tests also found that even though the projects have no change orders, Rehabilitation and Restoration type projects experienced significant schedule growth compared to others. However, the data did not show any significant cost and schedule growth for the projects when statistical tests were performed on overall data. The study concluded that highway projects are experiencing schedule growth even though the projects had no change orders. Results from the study can help planners, engineers, and administrators to gain better insight on how different types of highway projects are performing in terms of cost and schedule and eventually derive appropriate solutions to minimize cost and schedule growth in such projects.

  • PDF

EVALUATING CRITICAL SUCCESS FACTORS FOR ACCURATE FIRST COST ESTIMATES OF LARGE-SCALE CONSTRUCTION PROJECTS

  • Jin-Lee Kim;Ok-Kyue Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.354-360
    • /
    • 2009
  • The demands for large-scale construction projects such as Mega-projects are largely increasing due to the rapid growth of increasing populations as well as the need to replace existing buildings and infrastructure. Increasing costs of materials, supplies, and labors require the first cost estimates at the preliminary planning stage to be as accurate as possible. This paper presents the results obtained from the survey on evaluating nine critical success factors that influence the accurate first cost estimates for large-scale projects from practical experiences. It then examines the current cost structures of construction companies for large-scale projects, followed by the causes for cost and schedule overrun. Twenty completed surveys were collected and the Analytic Hierarchy Process was applied to analyze the data. The results indicate that technology issues, the contract type, and social and environmental impacts are the significant leading factors for accurate first cost estimates of large-scale construction projects.

  • PDF

Risk Identification and Management Strategies for BIM Projects

  • Ng, Ron C.W.;Cheng, Jack C.P.;Das, Moumita
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.103-113
    • /
    • 2020
  • The construction industry is undergoing a digital transformation in which Building Information Modelling (BIM) is a key technology. The potential of BIM in several areas such as design optimization, time management, cost management, and asset management/facility management (AM/FM) is widely acknowledged by the AECO (Architecture, Engineering, Construction, and Operation) industry around the world. However, BIM implementation in construction projects is faced with problems such as project delay and cost overruns. The lack of identification of risks in BIM projects and standard guidelines on mitigation techniques furthers poor performance, dissatisfaction, and disputes between employers and project participants, which results in low BIM adoption rates. Therefore, the objective of this paper is to identify the potential risks in BIM implementation under the primary categories - (1) technical, (2) contractual, (3) management-related, and (4) personnel-related risks in BIM projects and present solutions to reduce, manage, and mitigate risks. To meet the objective of this paper, a survey was designed and conducted in the Hong Kong construction industry in which over 140 respondents from different disciplines, with experience in BIM projects, have participated. Based on the analysis of the survey data, the most severe and frequently occurring BIM risks and their potential mitigation strategies were identified and discussed in this paper.

  • PDF

Prediction Model of Final Project Cost using Multivariate Probabilistic Analysis (MPA) and Bayes' Theorem

  • Yoo, Wi Sung;Hadipriono, FAbian C.
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.191-200
    • /
    • 2007
  • This paper introduces a tool for predicting potential cost overrun during project execution and for quantifying the uncertainty on the expected project cost, which is occasionally changed by the unknown effects resulted from project's complications and unforeseen environments. The model proposed in this stuff is useful in diagnosing cost performance as a project progresses and in monitoring the changes of the uncertainty as indicators for a warning signal. This model is intended for the use by project managers who forecast the change of the uncertainty and its magnitude. The paper presents a mathematical approach for modifying the costs of incomplete work packages and project cost, and quantifying reduced uncertainties at a consistent confidence level as actual cost information of an ongoing project is obtained. Furthermore, this approach addresses the effects of actual informed data of completed work packages on the re-estimates of incomplete work packages and describes the impacts on the variation of the uncertainty for the expected project cost incorporating Multivariate Probabilistic Analysis (MPA) and Bayes' Theorem. For the illustration purpose, the Introduced model has employed an example construction project. The results are analyzed to demonstrate the use of the model and illustrate its capabilities.

EVALUATION OF COST-TIME RELATIONSHIPS FOR CONTRACTORS PARTICIPATING IN COST-PLUS-TIME BIDDING

  • Saeed Abdollahi Sean Pour;Hyung Seok David Jeong
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.479-487
    • /
    • 2013
  • State Highway Agencies (SHAs) have started utilizing cost-plus-time bidding (A+B bidding) since Federal Highway Agency (FHWA) declared it operational on May 4, 1995. Although this technique has successfully accelerated many projects by incorporating construction time in the bidding competition, a framework to illustrate the interactions of incentive/disincentive (I/D) rates on the competitiveness of contractors participating in the bid competition is yet to be developed. In a previous research, authors indicated that for each bid competition there is an efficient cap for I/D rates which are dictated by the capabilities of contractors in project acceleration. However, the results of previous study were based on the assumption that there is a statistically significant relationship between cost and time. In this study, the entire cost-plus-time projects implemented by the Oklahoma Department of Transportation (ODOT) were investigated. Then the significance of relationship between cost and time were analyzed for each contractor utilizing Analysis of Variance (ANOVA) technique, and the price-time function of each contractor was determined by regression analysis. The results of the analysis indicate that there is a significant relationship between cost and time for the majority of contractors. However, a quadratic relationship is not always significant and for some contractors a linear price-time relationship is significant. The results of this project can be used not only by ODOT to optimize the incentive/disincentive rates but also by contractors to determine the most competitive strategies of other bid participants.

  • PDF

An Environmental Management Cost Estimating Method Improvement for New Multi-Housing Projects (공동주택 신축공사 환경관리비 산출방법 개선)

  • Lee, Jae-Ho;Park, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.3 s.31
    • /
    • pp.149-158
    • /
    • 2006
  • For construction projects, it is required to estimate the Environmental Management Cost(EMC) for pollution prevention, using the calculation standards prescribed in the Construction Technology Management Law(CTML). However, the EMC standards are difficult to utilize without definite site information. Therefore, it is needed a new calculation method reflecting project site information. According to the definition of EMC in the CTML, this study identifies the EMC items and classifies them into the pollution types such as air, water, noise, waste and others. With this EMC classification, the stud:』 analyzes using the SPSS the EMC for the 78 new multi-housing projects, which were executed during the past three years, 2000-2002. And then an EMC estimating matrix is developed with simple information such as site location and size of area from historical data. The proposed matrix can be effectively used to check and control budgeting and estimating the EMC of the multi-housing projects. In addition, the proposed EMC matrix are validated through a case study.

A Study on the Estimation of the Proper Rates of Safety Management Cost in the Construction Technology Promotion Law for Reasonable Construction Safety Management (합리적인 건설안전 관리를 위한 건설기술진흥법상 안전관리비의 적정요율 산정에 관한 연구)

  • Yoon, Young Geun;Oh, Tae Keun;Lee, Myeong-Gu;Seong, Joo Hyun;Jung, Min Hyung
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.5
    • /
    • pp.84-91
    • /
    • 2018
  • Despite the government 's efforts to reduce constructional disasters, it has been pointed out that the safety management cost of the Construction Technology Promotion Act does not reflect the actual site. Therefore, it is necessary to study the proper guideline of the safety management cost which can be used as the most fundamental measure to prevent construction accidents. Moreover for the securement of the reasonable safety management costs, it is important to calculate its appropriate rate. Thus, in this study, the appropriate rate of safety management cost was proposed by the construction cost & type based on the 111 execution plans of safety management cost, and the rate is analyzed to be 1/10 of the occupational safety and health management cost. The results of this study will be a guideline in improvement to the proper schedule rating system improvement and in implement of pilot projects.