• 제목/요약/키워드: Environmental Impact Assessment (EIA)

검색결과 850건 처리시간 0.024초

환경영향평가에서 있어서 신속영향평가(RIAM) 기법 적용방안 (Application of Rapid Impact Assessment Matrix for Environmental Impact Assessment)

  • 양원호;김임순;최원욱;한상욱
    • 환경영향평가
    • /
    • 제11권3호
    • /
    • pp.223-230
    • /
    • 2002
  • The rapid impact assessment matrix (RIAM) might be a new tool for performance of an environmental impact assessment (EIA), comparing with many traditional methods of EIA, which have produced large reports setting out the subjective judgement reached by the assessors. The main criticisms of E1A are in part a natural result of the traditional method used. RIAM uses a structured matrix to allow for such judgement, both subjective and those based on quantitative data, to be made on a like-by-like basis, and provided a transparent and permanent record of the judgement made. Also, the computerized RIAM system using software program allows for the matrix to be shown in graphical form, which greatly enhances the clarity of the results produced by this method. RIAM provides a system by which development options and scenarios can be rapidly evaluated. To illustrate the use of RIAM, an example from an EIA study using application of scoping by assessment criteria in Environmental Impact Regulation of Korea was given. The criteria that might be used to evaluation EIA methods, and how RIAM measures up against these criteria, are discussed.

한국에서 대학교과과정과 연계된 환경영향평가사 자격부여에 관한 연구 (Study on the Certificate System of the EIA Project Manager through Collaborative University Curriculum in Korea)

  • 김임순;한상욱
    • 환경영향평가
    • /
    • 제17권1호
    • /
    • pp.81-95
    • /
    • 2008
  • The study is intended to develop the measures to introduce the Environmental Impact Assessment (EIA) project manager (Environmental Assessor), who will be responsible for leading the EIA task. This role requires a quality standard of expertise in the area of natural science, social science, knowledge and technology on environment design mechanism, and the integrated approaches that combine the relevant policies and systems. To facilitate the system, the certificate will be given to the person who is well acquainted with the knowledge on EIA with relevant experiences, thereby authorizing them to coordinate the assessment task for reliable outcome. Hence, the need for introducing the system is very crucial. The EIA project manager, as a guide for an EIA project team, shall be the person who has a comprehensive understanding of the project, the knowledge about the principal for implementation of EIA and the expertise in structuring the management system, with a skill to maintain the good relationship with the people engaged in the project. To that end, it is highly recommended to set up such a certificate system to be incorporated in the college curriculum.

누적영향평가 측면에서 환경영향평가제도의 문제점과 개선방안 연구 - 석회석광산 채굴규모 확장을 대상으로 - (A Study on Environmental Impact Assessment on the Area Expansion of Limestone Mining with regard to Cumulative Impact Assessment)

  • 김초;연익준;정주용;이상우
    • 환경영향평가
    • /
    • 제23권1호
    • /
    • pp.1-9
    • /
    • 2014
  • This study, focusing on the area expansion of limestone mines, identifies the problems of Environmental Impact Assessment(EIA) and what impact the current problems exert on another mines developing process. The legal relations analysis reveals that the Management of Mountainous Districts Act and other related laws effect on EIA process, especially the case of area expansion of limestone mines excluded from EIA. However, these problems can create mismatch with the policy goal of EIA system and have a negative impact on the environment in the future. A series of indepth interviews with managers in related agencies found that those agencies have been unaware of the seriousness of the problem. Without any strategy, negative result made by development activities would get more serious and sustainable development may not be possible at all. In order to solve these problems, government should modify the current interdependent legal provision and create the incentive structure to participate actively related agency in the EIA system.

환경영향평가에 있어 위해성분석 기법의 도입 (Application of the Risk-Based Analysis to EIA)

  • 정용
    • 환경영향평가
    • /
    • 제4권3호
    • /
    • pp.1-8
    • /
    • 1995
  • In generally speaking, the purpose of Environmental Impact Assessment(EIA) is to give the environment its due place in the decision-making process by clearly ealuating the environmental consequence of a proposed activity before action is taken. The introduction of conventional EIA is to be seen as an end product of a very long evolutionary process, starting with rudimentary but evolving pollution control measures for air, water, noise, land and chemicals, each governed by separate, and separately administered pieces of legislation. In EIA process, the measures of status, scoping, proposed mitigation and communication have not been very quantitative in their significancy. Of course, the determinations have uncertainity in the implications for significant impacts. To improve the determination of significant impacts, some more comprehensive methodologies of EIA has been proposed with the concepts of risk analysis in the proposed projects. The concepts of risk analysis has been introduced to the expression of human health impairment due to environmental pollutants since the early 1980's. The risk analysis being meant by the statistical significance of impact has a process quantitatively considering uncertainities and importances of ecological systems and human health as well. The process of risk analysis shows assessment, doseresponse in toxicity, exposure assessment and risk characterization. With the risk assessment, it could be suggested for the proper measurements against their anticipated risk in the EIA. This paper deals the priciples developing process and application of the risk-based analysis in EIA.

  • PDF

환경영향평가에 있어서 건강위해성평가 기법의 활용방안에 관한 연구 (A Developmental Methodology of Environmental Impact Assessment: Application of Health Risk Assessment)

  • 구자건;정용
    • 환경영향평가
    • /
    • 제1권1호
    • /
    • pp.51-59
    • /
    • 1992
  • Environmental Impact Assessment(EIA) is defined as an activity designed to identify and predict the impact on the environment. In the process of an EIA, the quantitative evaluation is generally performed for the air and water quality which have the national environmental quality standards. But the predicted values for the air and water quality are simply compared to the environmental standards. At present, the EIA process of Korea has no consideration for the possible human health risk resulting from the development projects. Environmental Health Impact Assessment(EHIA) is an applied methodology of EIA to estimate the acceptable health risk caused by a specified level of environmental pollutants. Estimating the excessive lifetime risk that is a possibility of dying of a certain disease by environmental contaminants, is useful as an evaluation technique of EHIA. It is recommanded the decision-makers to make efficient use of EHIA not only the development projects but also legislative proposals, policies and programmes in future.

  • PDF

철도사업 환경영향평가와 환경관리(I) (Environmental Impact Assessment and Environmental Management of Railways (I))

  • 이현우;이영준;박영민;이정호;윤미경
    • 환경영향평가
    • /
    • 제13권6호
    • /
    • pp.295-305
    • /
    • 2004
  • After the Rio declaration on environment and development in 1992, developed countries are undertaking "environmentally sustainable transportation (EST)" projects. To meet the needs for EST, current transportation policies in Korea are rapidly reforming and one of its concerns is modernizing and upgrading railway freight system. Planning new railroad construction projects is increasing and subsequent environmental impact assessment (EIA) demands improvements, especially in both the EIA and decision making systems. In this paper, we discuss the present status of EIA for railroad construction projects, especially, by analyzing the EIA documents for the last six years. The EIA for railroad construction projects accounts for only 4.9% of total 918 project EIAs during 1998-2003, and the portion is gradually increasing. Major environmental concerns for EIA in railroad construction projects were geomorphological and ecological changes, protection of rare organisms, air pollution, water pollution, waste management, and noise, etc. We compared characteristics of environmental impacts of railroad construction with those of vehicle road construction, based on environmental and construction-planning indicators appeared in Environmental Impact Statements. Railroad construction usually requires longer tunnels and bridges for a given length than those for vehicle road construction. In addition, the amounts of geomorphological and ecological changes (road-cutting, embankment, devegetation, etc.) in railroad construction were generally less than 50% of those in vehicle road construction. To develop environmentally friendly railway systems, monitoring studies for environmental impacts of railroads such as habitat fragmentation and road kills, dispersal of alien plants, tunnelling effects on groundwater and vegetation, and noise impacts are highly recommended.

Post-2020에 연계한 온실가스 항목의 환경영향평가 개선 방안 (Improvement of EIA Associated with Greenhouse Gases Subject Matter for the Preparedness of Post-2020)

  • 홍상표
    • 환경영향평가
    • /
    • 제28권5호
    • /
    • pp.483-491
    • /
    • 2019
  • 파리 협약에 따른 post-2020에 대비하기 위한 환경영향평가(EIA : Environmental Impact Assessment) 측면에서의 온실가스 감축방안을 모색하였다. 2010~2019년 금강유역환경청의 EIA대상사업 중 26건의 환경영향평가서(EIS : Environmental Impact Statement)를 사례분석한 결과로, '온실가스 항목'은 대부분 형식적으로 작성된 것으로 분석되었다. 본 연구에서는 EIA시 '온실가스 항목'의 형식적 평가를 개선하기 위한 방안으로서, 1) EIA대상사업별 온실가스 배출량에 따른 배출부과금 할당, 2) "환경오염시설의 통합관리에 관한 법률"에 근거한 '허가배출기준 설정'에 '온실가스 항목'의 추가, 3)이해당사자들이 EIA대상 개발사업의 초기단계에 참여하는 거버넌스 확립으로 온실가스 감축 등을 제안하였고, 구체적인 내용을 논의하였다.

독일에서의 환경영향평가와 분쟁조정 (Environmental Impact Assessment and Mediation)

  • Schafer, Bettina
    • 환경영향평가
    • /
    • 제2권2호
    • /
    • pp.41-47
    • /
    • 1993
  • During the last years it became more and more difficult to deal with environmental conflicts using traditional political instruments in industrialized countries. One reason for the occurring problems might be the citizens' awareness of scarceness of nature. Another reason might be the changing legislation with the introduction of the environmental impact assessment (EIA) as an integral part of a project's licensing procedure. The EIA offers new possibilities for citizens to interfere in decision processes and to obstruct projects. The changing situation requires new instruments for conflict solving. Mediation may be considered an alternative or completion to the traditional political instruments. It is a systematic strategy for conflict treatment and. with the support of an independent mediator, allows to reach an agreement among all parties involved. Mediation may be introduced in the EIA One possibility offers the scoping date, which, if the participation of the public is assured, might avoid heavy disputes in the further process. Another connection between the instrument of mediation and the EIA could be the use of the environmental impact study (EIS) as information background for a mediation process. EIA would then be source of information about all environmental aspects. Thus the role of EIA would be extended to being a part of conflict analysis in the alternative dispute resolution process.

  • PDF

대안적 환경평가 시스템 연구: 통합적 의사결정을 위한 새로운 개념의 영향평가모형(APEMI IA MODEL)의 국내 적용방안 탐색 (A Study on the Alternative Environmental Assessment System in KOREA : Applying New Conceptual Model(APEMI IA MODEL) into Impact Assessment for Better Integrated Decision-Making)

  • 김임순;한상욱
    • 환경영향평가
    • /
    • 제14권4호
    • /
    • pp.179-193
    • /
    • 2005
  • As the world's attention turns to sustainability and the considerations of cumulative effects, the concept of Strategic Environmental Assessment(SEA) has become more significant and urgent and increasing number of countries and international organizations now undertake some forms of SEA. The term SEA, however, is variously defined and understood; generally it means a formal process of systematic analysis of the environmental effects on development policies, plans, programmes and other proposed strategic actions. This process extends the aims and principles of EIA upstream in the decision-making process, beyond the project level in which major alternatives are still open. There is a shift toward more integrative approaches and greater use of Environmental Impact Assessment (EIA) and Strategic Environmental Assessment (SEA) as sustainability tools in cooperation with Environmental Management System (EMS). Currently, Korea has EIA system and Prior Environmental Review System (PERS) which is different type of SEA as Environment Assessment (EA) system. APEMI IA MODEL integrated following three pillar(refer to attached figure.1) ; First pillar symbolized decision making cycle with planning process. Second pillar symbolized integrated assessment which tying SEA and EIA with specific impacts assessment(eg: social impact assessment, economic impact assessment, health impact assessment etc) in cooperation with EMS. Third pillar symbolized EA best practical procedure of International Association for Impact Assessment(IAIA). Considering the above, we applied new conceptual model(APEMI IA MODEL) into Impact Assessment for better integrated decision-making in KOREA as an alternative IA system(IS IA MODEL A and B refer to attached figure 4, 5).