• Title/Summary/Keyword: Environment Management Plan

Search Result 1,598, Processing Time 0.027 seconds

A Study on the Classroom Space Planning through User Participation Design - Focusing on the case of School Space Innovation Project in Incheon - (사용자 참여설계를 통한 교실공간계획에 관한 연구 - 인천광역시 학교공간 혁신사업 사례를 중심으로 -)

  • Son, Suk-Eui;Kim, Seung-Je
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.28 no.4
    • /
    • pp.11-17
    • /
    • 2021
  • This study is aimed at presenting an efficient management plan of user participatory design in a situation where the School Space Innovation Project is in progress. 2 schools that were the targets of the Incheon School Space Innovation Project in 2019 were selected for this, and features such as the physical environment of that classroom, classroom usage plan, and the stepwise outcome of the user participatory design workshop were contemplated. Especially the workshop outcome was compared and analyzed quantitatively, focusing on the actual master plan and zoning plan, in order to identify the feature that opinions of various users are reflected on the actual plan. As a result, the following conclusion could be reached. Firstly, it was confirmed that the expression about the user preferential space influences the classroom usage plan of that classroom. Vague expressions about the whole space held a large majority of the objects for the linguistic expression of the preferential space. The expression mode as limited as the expression of the actions that users want to carry out in the space. On the other hand, when the usage purpose of the classroom was definite, it was confirmed that the demand for furniture·facility is relatively high. Secondly, according to the analysis of zoning for each function, it seems that the stereotype, which is arranged on the basis of the chalkboard at the front of existing classrooms, was applied in the case of the learning zone. However, in cases of other functions, a tendency was identified that the user carries out an image description that reflects the physical features of the space. Sufficient preparation will need to precede for the efficient management of the user participatory design workshop and the acceptance of various opinions. It seems that especially the classroom usage plan, number of workshops, consultation of each step, and the education about the space expression mode affect the master plan.

A Case Study on the Quality Management of Construction Site through PDCA Cycle (PDCA Cycle적용을 통한 건설현장 품질관리에 관한 사례연구)

  • Baik, In-Whee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.49-56
    • /
    • 2008
  • According to the recent trends which are the diversity of customer requests and the multi-function of buildings, A construction company's business has converted from the producer-oriented approach to the consumer-oriented approach. Therefore, each construction company is continuously trying to improve the quality level as a way of corresponding to customer needs in these changing situations. The quality is one of the main management targets which judge the success of a project along with the schedule, the cost and the safety. As construction companies execute the quality management which they aimed at, it should be completed within the optimum schedule and the limit of the budget. Accordingly, the importance of the construction site management to complete a project is continuously increasing. The construction site management is the systematic method to perform the project goals such as the quality improvement, the cost saving and the safety management, which organically operate one another, by procuring the manpower, the material and the machine in the right time. Specially, as the construction industry has based on the construction site, the establish of systematic construction site management, which can effectively correspond sudden changes of the construction business environment, is essential to maximize the construction productivity. On top of that, the necessity of the quality management method is increasing to accommodate customer needs more spontaneously in the construction site. These endeavors could guarantee their competitive power.

A Study on Simulation based Manufacturing in Shipyards : Focused on a Long-term Plan Verification (조선소에서의 시뮬레이션 기반 생산에 관한 연구 : 선표 계획 검증을 중심으로)

  • Lee, Dong-Kun;Oh, Dae-Kyun
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.20 no.1
    • /
    • pp.86-95
    • /
    • 2014
  • Productivity improvement of a shipbuilding company depends on how efficiently its limited resources are managed and utilized. Recently, research on modeling and simulation (M&S) to support shipyard production management system has been being under study. The production management based on M&S rejects decision making on experience, and it can establish productivity improvement method based on quantitative and specific data. In this paper, M&S is applied to the long-term plan as a part of the production planning in shipyards. To this end, the long-term plan processes and related management systems are analyzed. Based on the analysis, a simulation model and an application system using commercial simulation software are suggested. And basic structure of the suggested system is based on web technology such as Rich Internet Application, web services protocol for compatibility with existing shipyard enterprise systems. Utilizing the results of this study, it is expected that shipyard production planners can settle down work flow, in which one can establishes the production plan, simulates the plan, and analyzes the results, enabling a more reliable production plans.

Landscape Analysis on simulation studies are used to deliberation landscape - Focuse on the Apartment Gyeonggi-do landscape simulation analysis - (경관심의에 사용되는 경관시뮬레이션 실태분석 연구 - 경기도 공동주택사업 경관시뮬레이션 분석을 중심으로 -)

  • Lee, Im Jung;Choi, Joo Young
    • KIEAE Journal
    • /
    • v.14 no.4
    • /
    • pp.69-79
    • /
    • 2014
  • Adverse effects resulting from the development of the environment and to minimize damage to the natural environment and the desire for pleasant scenery and the sense of raising more awareness about May 17, 2007 in accordance with the scenery method is established by each municipality landscape management and landscape planning committee Configure the district planning officer for development projects, including enhancing deliberation scenery method 7 February 2014 and revised in urban areas is more than $30,000m^2$ urban planning landscape projects are all considered by a committee mandated to landscape receive a defined landscape plan for the development was enhanced. Gyeonggi Province in 2007 after the enactment of the scenery method for district planning and landscape planning by strengthening the district planning consideration during deliberations landscape simulation by selecting the view that the proposed mandatory hearing officer from the Joint Committee on Urban construction was done. In this study, Gyeonggi-do district planning business point of view the characteristics of the landscape planning and landscape planning of the center of analysis and as a basis for the evaluation presented.

Satisfaction with the Function of Interior Space of household -With a Focus on Apartments in Seoul- (주택 내부공간의 기능성에 대한 만족도 조사연구 -서울시 아파트를 중심으로-)

  • 윤복자;신화경
    • Journal of Families and Better Life
    • /
    • v.2 no.1
    • /
    • pp.165-177
    • /
    • 1984
  • The purpose of this study was to investigate satisfaction with the function of interior space of apartment and factor which influence it, and then to provide housing practitioners with basic data for more desirable apartment interior environment. On the basis of the review of literature, questionnaire was developed. The sample was classified into type of unit floor plan and house size of 17 districts in Seoul. 139 households were selected in three districts which were the first three regions of high apartment density. Data were analyzed by computer using frequency, percentage, mean, standard deviation, F-test, Duncans multiple range test, η2 , person's product moment correlation coefficient. the results are as follows: Factors which influence satisfaction with the functionality of interior were household size and family life cycle as sociodemographic variable, and type of unit floor plan as physical variable. It was shown that the satisfaction with the functionality of interior was related to satisfaction with the external environment. More specifically, (1)the smaller a household size was the more the owner became satisfied. (2)households were in the stage of establishment in the family life cycle and households with C type of unit floor plan showed higher degree of satisfaction. (3) satisfaction with the functionality of interior had positibly related to satisfaction with the external environment.

  • PDF

A Workplace to Support Creativity

  • Samani, Sanaz Ahmadpoor;Rasid, Siti Zaleha Binti Abdul;bt Sofian, Saudah
    • Industrial Engineering and Management Systems
    • /
    • v.13 no.4
    • /
    • pp.414-420
    • /
    • 2014
  • The purpose of this paper is to provide a review of the background information regarding to the role of workplace on affecting people's performance. In today's industry creativity has a very special and important place because of the dynamic organizational changes and rapid growth of technology. To support these new working styles and specifically, to support creativity within an organization, flexible workplaces are often suggested. Since open-plan office offers more flexibility when compared to completely closed and private ones, they are seen to have more capabilities and are highly valued in today's industry. So the result of this study will contribute towards enhancing the understanding of the effect office design to enhance employees' performance, especially in creative tasks.

Analysis of Business Process in the SCM Sector Using Data Mining (데이터마이닝을 활용한 SCM 부문에서의 비즈니스 프로세스 분석)

  • Lee, Sang-Young;Lee, Yun-Suk
    • Journal of the Korea Society of Computer and Information
    • /
    • v.11 no.6 s.44
    • /
    • pp.59-67
    • /
    • 2006
  • If apply BPM that is a business process management tool to SCM sector, efficient process management and control are available. Also, BPM can execute integrating process that compose SCM effectively. These access method does to manage progress process of SCM process more efficiently and do monitoring. Also, It is can be establish plan about improvement of process analyzing process achievement result. Thus, in this paper, introduce this BPM into SCM environment. Also, SCM process presents plan that executes integration and improves business process effectively applying data mining technique.

  • PDF

Watershed Management Plan through Water Quality Monitoring for Main Branches of 4 Water Systems in Chungcheongnamdo (충청남도 4대수계 주요 지류하천 수질 모니터링을 통한 유역 관리 방안)

  • Park, Sanghyun;Kim, Hongsu;Cho, Byunguk;Moon, Eunho;Choi, Jinha
    • Journal of Korean Society on Water Environment
    • /
    • v.32 no.2
    • /
    • pp.163-172
    • /
    • 2016
  • This study aimed to develop a plan for effective performance of a watershed through correct identification of a river watershed by using the flowrate of the river and water quality data, which is the basis for the establishment of the water environment policy. The target river for water quality improvement was selected based on the monitoring result for 4 water systems in Chungcheongnamdo province in the recent 3 years. The result of analysis for the distribution of discharge capacity by a pollution source group for the water quality improvement target river showed that most of the target river has a high discharge capacity in the water system for living and livestock. Analysis for the density of the total discharge capacity of the whole watershed of Chungcheongnamdo indicated that the river that needs water quality improvement has high BOD concentration and high discharge load density at the point that this river is located. Thus, for efficient watershed management through selection and concentration, Chungcheongnamdo needs to improve the target river in priority. Stepwise planning is also required to establish and execute the water quality improvement in order to satisfy said target water quality, and establish the index for the water improvement rate for its evaluation.

Evaluation of Green House Gases (GHGs) Reduction Plan in Combination with Air Pollutants Reduction in Busan Metropolitan City in Korea

  • Cheong, Jang-Pyo;Kim, Chul-Han;Chang, Jae-Soo
    • Asian Journal of Atmospheric Environment
    • /
    • v.5 no.4
    • /
    • pp.228-236
    • /
    • 2011
  • Since most Green House Gases (GHGs) and air pollutants are generated from the same sources, it will be cost-effective to develop a GHGs reduction plan in combination with simultaneous removal of air pollutants. However, effects on air pollutants reduction according to implementing any GHG abatement plans have been rarely studied. Reflecting simultaneous removal of air pollutants along with the GHGs emission reduction, this study investigated relative cost effectiveness among GHGs reduction action plans in Busan Metropolitan City. We employed the Data Envelopment Analysis (DEA), a methodology that evaluates relative efficiency of decision-making units (DMUs) producing multiple outputs with multiple inputs, for the investigation. Assigning each GHGs reduction action plan to a DMU, implementation cost of each GHGs reduction action plan to an input, and reduction potential of GHGs and air pollutants by each GHGs reduction action plan to an output, we calculated efficiency scores for each GHGs reduction action plan. When the simultaneous removal of air pollutants with the GHGs reduction were considered, green house supply-insulation improvement and intelligent transportation system (ITS) projects had high efficiency scores for cost-positive action plans. For cost-negative action plans, green start network formation and running, and daily car use control program had high efficiency scores. When only the GHGs reduction was considered, project priority orders based on efficiency scores were somewhat different from those when both the removal of air pollutants and GHGs reduction were considered at the same time. The expected action plan priority difference is attributed to great difference of air pollutants reduction potential according to types of energy sources to be reduced.