1 |
Wu, S. D. and R. A. Wysk(1989), An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing, International Journal of Production Research, Vol. 27, No. 9, pp. 1603-1623.
DOI
|
2 |
Song, Y. J., D. K. Lee, S. W. Choe, J. H. Woo and J. G. Shin(2009), A simulation-based capacity analysis of a block-assembly process in ship production planning, Journal of the Society of Naval Architects of Korea, Vol. 46. No. 1, pp. 78-86.
과학기술학회마을
DOI
|
3 |
Woo, J. H., D. K. Oh, C. J. Lee, Y. R. Choi and J. G. Shin(2006), Simulation modeling methodology and simulation system architecture for shipbuilding processes, Transactions of the Society of CAD/CAM Engineers, Vol. 11, No. 1, pp. 11-19.
과학기술학회마을
|
4 |
Woo, J. H., Y. J. Song, Y. W. Kang and J. G. Shin(2010), Development of the decision-making system for the ship block logistics based on the simulation, Journal of Ship Production and Design, Vol. 26, No. 4, pp. 290-300.
|
5 |
Song, C. S. and Y. W. Kang(2009), Simulation of block logistics at a big shipyard, Transactions of the Society of CAD/CAM Engineers, Vol. 14, No. 6, pp.374-381.
과학기술학회마을
|
6 |
Lee, C. J., J. H. Lee, J. H. Woo, J. G. Shin and C. Ryu(2007), A Study on discrete event simulation of shipyard outdoor block movement, Journal of the Society of Naval Architects of Korea, Vol. 44, No. 3, pp. 647-656.
과학기술학회마을
DOI
|
7 |
Alfeld, L. E., C. S. Pilliod, and J. R. Wilkins(1998), The virtual shipyard: a simulation model of the shipbuilding process, Journal of Ship Production, Vol. 14, No. 1 pp. 33-40.
|
8 |
Caprace, J. D., R. M. Freire, L. F. Assis and P. Rigo(2011), Discrete event production simulation in shipyard workshops, XXII COPINAVAL - Pan American Conference of Naval Engineering, Maritime Transportation & Ports Engineering, Buenos Aires, Argentina.
|
9 |
Krause, M., F. Roland, D. Steinhauer and M. Heinemann(2004), Discrete Event Simulation: an efficient tool to assist shipyard investment and production planning, Journal of Ship Production, Vol. 20, No. 3, pp. 176-182.
|
10 |
Lee, C., C. S. Leem and I. Hwang(2011), PDM and ERP integration methodology using digital manufacturing to support global manufacturing, International Journal of Manufacturing Technology, Vol. 53, pp. 399-409.
DOI
|
11 |
Lee, D. K., Y. K. Jeong and J. G. Shin(2013), Study on a layout design method for leisure ship production factories using a heuristic location-allocation algorithm, Journal of the Korean Society of Marine Environment & Safety, Vol. 19, No. 3, pp. 277-284.
과학기술학회마을
DOI
ScienceOn
|
12 |
Lee, D. K., Y. Kim, I. H. Hwang, D. K. Oh and J. G. Shin(2014), Study on a process-centric modeling methodology for virtual manufacturing of ships and offshore structures in shipyards, The International Journal of Advanced Manufacturing Technology, Vol. 71, pp. 621-633.
DOI
ScienceOn
|
13 |
Lee, D. K., S. H. Nam and J. G. Shin(2012), A study of life cycle assessment in shipyards layout using a discrete event simulation engine, Journal of the Korea Society for Simulation, Vol. 21, No. 1, pp. 1-8.
과학기술학회마을
DOI
|
14 |
Lee J. M.(2007), Integrated process and measurement framework for planning production of large shipyards, Thesis of Ph.D., Seoul National University.
|
15 |
Lee, K. K., J. G. Shin and C. Ryu(2009), Development of simulation-based production execution system in a shipyard: a case study for a panel block assembly shop, Production Planning & Control: The Management of Operations, Vol. 20, No. 8, pp. 750-768.
DOI
ScienceOn
|
16 |
Shin, J. G., K. K. Lee, J. H. Woo, W. D. Kim, J. H. Lee, S. H. Kim, J. Y. Park and H. Yim(2004), A modeling and simulation of production process in subassembly lines at a shipyard, Journal of Ship Production, Vol. 20, No. 2, pp. 79-83.
|