Browse > Article
http://dx.doi.org/10.7837/kosomes.2014.20.1.086

A Study on Simulation based Manufacturing in Shipyards : Focused on a Long-term Plan Verification  

Lee, Dong-Kun (Department of Naval Architecture and Ocean Engineering, Mokpo National Maritime University)
Oh, Dae-Kyun (Department of Naval Architecture and Ocean Engineering, Mokpo National Maritime University)
Publication Information
Journal of the Korean Society of Marine Environment & Safety / v.20, no.1, 2014 , pp. 86-95 More about this Journal
Abstract
Productivity improvement of a shipbuilding company depends on how efficiently its limited resources are managed and utilized. Recently, research on modeling and simulation (M&S) to support shipyard production management system has been being under study. The production management based on M&S rejects decision making on experience, and it can establish productivity improvement method based on quantitative and specific data. In this paper, M&S is applied to the long-term plan as a part of the production planning in shipyards. To this end, the long-term plan processes and related management systems are analyzed. Based on the analysis, a simulation model and an application system using commercial simulation software are suggested. And basic structure of the suggested system is based on web technology such as Rich Internet Application, web services protocol for compatibility with existing shipyard enterprise systems. Utilizing the results of this study, it is expected that shipyard production planners can settle down work flow, in which one can establishes the production plan, simulates the plan, and analyzes the results, enabling a more reliable production plans.
Keywords
Shipyard production management system; Modeling & simulation; Simulation based verification and validation; Simulation based manufacturing; Shipyard long-term plan;
Citations & Related Records
Times Cited By KSCI : 7  (Citation Analysis)
연도 인용수 순위
1 Wu, S. D. and R. A. Wysk(1989), An application of discrete-event simulation to on-line control and scheduling in flexible manufacturing, International Journal of Production Research, Vol. 27, No. 9, pp. 1603-1623.   DOI
2 Song, Y. J., D. K. Lee, S. W. Choe, J. H. Woo and J. G. Shin(2009), A simulation-based capacity analysis of a block-assembly process in ship production planning, Journal of the Society of Naval Architects of Korea, Vol. 46. No. 1, pp. 78-86.   과학기술학회마을   DOI
3 Woo, J. H., D. K. Oh, C. J. Lee, Y. R. Choi and J. G. Shin(2006), Simulation modeling methodology and simulation system architecture for shipbuilding processes, Transactions of the Society of CAD/CAM Engineers, Vol. 11, No. 1, pp. 11-19.   과학기술학회마을
4 Woo, J. H., Y. J. Song, Y. W. Kang and J. G. Shin(2010), Development of the decision-making system for the ship block logistics based on the simulation, Journal of Ship Production and Design, Vol. 26, No. 4, pp. 290-300.
5 Song, C. S. and Y. W. Kang(2009), Simulation of block logistics at a big shipyard, Transactions of the Society of CAD/CAM Engineers, Vol. 14, No. 6, pp.374-381.   과학기술학회마을
6 Lee, C. J., J. H. Lee, J. H. Woo, J. G. Shin and C. Ryu(2007), A Study on discrete event simulation of shipyard outdoor block movement, Journal of the Society of Naval Architects of Korea, Vol. 44, No. 3, pp. 647-656.   과학기술학회마을   DOI
7 Alfeld, L. E., C. S. Pilliod, and J. R. Wilkins(1998), The virtual shipyard: a simulation model of the shipbuilding process, Journal of Ship Production, Vol. 14, No. 1 pp. 33-40.
8 Caprace, J. D., R. M. Freire, L. F. Assis and P. Rigo(2011), Discrete event production simulation in shipyard workshops, XXII COPINAVAL - Pan American Conference of Naval Engineering, Maritime Transportation & Ports Engineering, Buenos Aires, Argentina.
9 Krause, M., F. Roland, D. Steinhauer and M. Heinemann(2004), Discrete Event Simulation: an efficient tool to assist shipyard investment and production planning, Journal of Ship Production, Vol. 20, No. 3, pp. 176-182.
10 Lee, C., C. S. Leem and I. Hwang(2011), PDM and ERP integration methodology using digital manufacturing to support global manufacturing, International Journal of Manufacturing Technology, Vol. 53, pp. 399-409.   DOI
11 Lee, D. K., Y. K. Jeong and J. G. Shin(2013), Study on a layout design method for leisure ship production factories using a heuristic location-allocation algorithm, Journal of the Korean Society of Marine Environment & Safety, Vol. 19, No. 3, pp. 277-284.   과학기술학회마을   DOI   ScienceOn
12 Lee, D. K., Y. Kim, I. H. Hwang, D. K. Oh and J. G. Shin(2014), Study on a process-centric modeling methodology for virtual manufacturing of ships and offshore structures in shipyards, The International Journal of Advanced Manufacturing Technology, Vol. 71, pp. 621-633.   DOI   ScienceOn
13 Lee, D. K., S. H. Nam and J. G. Shin(2012), A study of life cycle assessment in shipyards layout using a discrete event simulation engine, Journal of the Korea Society for Simulation, Vol. 21, No. 1, pp. 1-8.   과학기술학회마을   DOI
14 Lee J. M.(2007), Integrated process and measurement framework for planning production of large shipyards, Thesis of Ph.D., Seoul National University.
15 Lee, K. K., J. G. Shin and C. Ryu(2009), Development of simulation-based production execution system in a shipyard: a case study for a panel block assembly shop, Production Planning & Control: The Management of Operations, Vol. 20, No. 8, pp. 750-768.   DOI   ScienceOn
16 Shin, J. G., K. K. Lee, J. H. Woo, W. D. Kim, J. H. Lee, S. H. Kim, J. Y. Park and H. Yim(2004), A modeling and simulation of production process in subassembly lines at a shipyard, Journal of Ship Production, Vol. 20, No. 2, pp. 79-83.