• Title/Summary/Keyword: Engineering team project

Search Result 435, Processing Time 0.024 seconds

A Study of Improvement Factors in the Construction Phase of the Building Project (건축프로젝트의 질 관리에 있어서 시공분야 개선요소에 관한 연구)

  • Kim, Suk-Hoi;Im, Chil-Soon
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.9 no.4
    • /
    • pp.293-300
    • /
    • 2006
  • Utilizing a building model design of the investigation factors and structured questionnaire, the results of an investigation concerning the improvement factors in the construction phase, as perceived by academic staffs including graduate students, designers, contractors and property management teams, are presented. Findings reveal that management commitment dominate improvement factors for building projects, although construction firms frequently mentioned the team work in design firms. Significant improvements in building projects are obtained when college programs include courses that treat the administrative aspects involved in the building project and that continuing education programs cover quality training. Eighteen predominant selection factors are identified, ranked and correlated.

  • PDF

A Case Study on the application of Human Performance Technology for a strengthening of Convergence Project Management Capability (컨버전스 프로젝트 이행역량 강화를 위한 HPT(Human Performance Technology)적용 사례연구)

  • Kim, Woong-Geol;Park, Jai-Hyoung
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2009.05a
    • /
    • pp.165-168
    • /
    • 2009
  • 현재 IT서비스 업체에서 새로운 성장동력으로 떠오르고 있는 분야가 융복합사업(IT+IT, IT+장비, IT+장비+시공)이라고 불리우는 컨버전스 프로젝트이다. 기존의 IT분야의 프로젝트와는 전혀 다른 특성을 갖고 있는 컨버전스 프로젝트에 대한 IT서비스 업체의 준비는 아직 미흡한 것이 현실이다. LG CNS에서는 이런 현실에서 컨버전스 프로젝트의 특성에 맞추어 기존 프로젝트 관리자(Project Manager)의 역할을 재정의하고 이를 현장에 적용시키기 위해 그동안의 컨버전스 프로젝트를 수행하면서 얻은 이슈에 HPT(Human Performance Technology; 수행공학)를 적용하여 조직적인 차원에서 프로젝트 관리자의 육성 로드맵을 만들고 이를 확산시키는 활동을 진행하고 있다. 이에 본 발표에서는 HPT측면에서 컨버전스 프로젝트 이행역량을 강화하기 위한 사례를 소개하고자 한다.

  • PDF

Six Sigma Project Selection Integrated into the Business Strategy (경영전략과 통합된 6시그마 과제 선정 방안)

  • Hur, Won-Suk;Kim, Dong-Chun;Jang, Joong-Soon
    • IE interfaces
    • /
    • v.16 no.spc
    • /
    • pp.1-6
    • /
    • 2003
  • This study deals with the problem of selecting 6 sigma projects. Traditionally, such selection was based on CTQ (critical to quality) or COPQ (cost of poor quality) derived within business units. Since the objective of 6 sigma is to achieve business goals in a short period, 6 sigma projects should be selected and carried out in coincidence with the whole company's strategies. This paper proposes two methods of selecting 6 sigma projects: one is to identify CTQ's by analyzing the company's BSC's (balanced score card) and then deploying them into subunits of the company and the other is to identify those projects with large hidden COPQ or cost of waste by applying value stream analysis and process model simulation to derive process cost models.

A MODEL OF CONSTRUCTION WORKER'S PERCEPTIONS ON ELECTRONIC MONITORING

  • Bill L.P. Lee;Stephen Mak
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.190-195
    • /
    • 2009
  • With the growth of information and communication technologies adoption in construction projects, it could be anticipated that more property owners and construction firms will attempt to use electronic gears and gadgets for site monitoring or surveillance purposes. As the construction workers may be the major group of project team members being monitored, from managerial perspectives and for ethical reasons, it is essential to investigate their degree of acceptance on site monitoring systems. Indeed studies on office workplace monitoring suggest that a monitoring system could shape or control the behaviors of employees. With adequate refinements, their research models could be applicable in the construction industry. This paper presents a model for analyzing the antecedences that affect workers' acceptance level on electronic monitoring, and investigating if there is any behavioral change.

  • PDF

Research And Improve Agile Development Methods Based On Teamwork (팀워크 바탕으로 애자일 개발방법의 개선연구)

  • Xiang, Chen;Kim, Byungki
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.2 no.5
    • /
    • pp.303-310
    • /
    • 2013
  • Agile software development methodology is a lightweight software development method, plays an important role in the software development team. In this paper, we propose programs that in when agile development co-operation, team management, team collaboration and project management tasks can be high efficiency and allocation of human resources. The proposed model, the use of 6-Sigma priority assignment, established a mathematical model of the operation and distribution of human resources is the most reasonable people go to work. Cooperation makes team-based agile development can improve efficiency. This method improve staff efficiency by teamwork to improve the productivity of software development.

Automatic Train Control (ATC) System Development through Application of Reverse and Re-Systems Engineering Process (역공학 및 재공학 시스템엔지니어링 프로세스 적용을 통한 무인열차자동제어시스템 개발)

  • 이중윤;박영원
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.9 no.10
    • /
    • pp.836-843
    • /
    • 2003
  • The automatic train control (ATC) system development project for the Automated Guideway Transit (AGT) system has high technical risk because the system is unmanned train control system using wireless technology which was unprecedented in train control industry of Korea. To overcome the technical risk during concept design phase of the ATC system development project, the integrated product team(IPT) carried out a reverse and reengineering process using a systems engineering design model. The generic systems engineering process is incorporated in the both reverse and reengineering process. As a result of the systems engineering effort, the IPT has built top layer systems engineering design model of the ATC subsystem. The purpose of this paper is to deliver the reverse and reengineering process which was used to develop the systems engineering design model of ATC system using a computer aided systems engineering tool. This study also shows that the model based reverse and reengineering process can reduce the technical risk by identifying the differences of requirement, functional and physical architecture between a reference system and a target system.

Evaluation on Low-floor Bus Package Layout from the Perspective of Universal Design

  • Kim, Sun-Woong;Kim, Ji-Yeon;HwangBo, Hwan;Hwang, Bong-Ha;Moon, Yong-Joo;Ji, Young-Gu
    • Journal of the Ergonomics Society of Korea
    • /
    • v.30 no.5
    • /
    • pp.659-669
    • /
    • 2011
  • Objective: The aim of this study is to suggest a package layout guideline for low-floor bus by interview with passengers and observations of their behavior. Background: Increasing attention has been introduced the low-floor bus to be more suitable for use by transportation handicapped. Complex issues are involved in providing comfortable services to all people. We are going to suggest package layout guidelines for more comfortable and suitable travel to all people. Method: The two times of survey and video observation sessions were conducted on low-floor buses in Seoul; (1) a finding of potential issues in the first session, (2) a confirming of issues from the last session. Results: The three of major issues were founded in this study; (1) difficulties in supporting body when standing, (2) difficulties in sitting on front wheel pan seat, (3) difficulties in passing through the aisle. Conclusion: There were clear differences between public and transportation handicapped in using some tools which are used for support body such as roof hand rails, side hand rails, and hand rail rings. Some of design problems were founded to improve from the perspective of ergonomics and universal design. Such differences and design guidelines have to be considered in bus design as well as commercial vehicle. Application: The proposed design guidelines can be used to development of low-floor bus and other public transportations.

A Case Study on Design and Construction of Cofferdam for Hydraulic Structure (수중구조물을 위한 가물막이 설계 및 시공사례에 대한 연구)

  • Cho, Joo-Hwan;Shin, Dong-Hoon;Jeong, Seung-Tai;Woo, Sang-Yoon;Nam, Yong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.124-143
    • /
    • 2010
  • Cofferdam is a temporary levee or dam structure built by using sheet pile or earth materials to prevent water infiltration during construction work of bridge, dam, harbour dock, or hydraulic structures in the river. In this regard, it is required to secure cutoff ability for dry work and workability for rapid installation and removal of the temporary dam or levee structures. In this paper, case studies for design and construction of cofferdam were performed, and water diversion method was briefed with some examples of cofferdam type as well. For the case study details of design and construction were reviewed based on cofferdams under construction related to 16 submerged weirs of "The 4-river restoration project" and dam type cofferdam respectively. From the review, it was known that the method for changing the water flow is selected based on the data from geological and geo-hydraulic site investigation in order to mitigate environmental effects by making sure if the design cross-sectional area of flow and maximum working days are sufficiently guaranteed. Finally, the primary findings and main conclusion derived are summarized that determination of applicable type of cofferdam should be checked by case study and meet design requirements such as water inflow control, constructability.

  • PDF

Teaching Method using Job Assignment as a Solution on the Adverse Effects of Peer Evaluation in Team-based Learning (조별과제 동료평가의 역효과 해결을 위한 직무배정 수업기법)

  • Kim, Sang-Kyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.6
    • /
    • pp.2543-2547
    • /
    • 2011
  • This paper suggests a new method for team-based learning which is focusing on the individual job assignment to solve the possible problems of free riders, dysfunctional conflicts, and hostility among students. Especially, it examines that if a method using job assignment could reduce the adverse effects of peer evaluation. This study was executed during one semester. Each team was organized with seven members and an independent job among seven different jobs was assigned to each member. At the end of the semester, it was examined that if individual job assignment had solved the possible problems of free riders, dysfunctional conflicts, and hostility among students. Finally, this study found that a new method of team-based learning using a job assignment lessened a problem of free riders, and reduced dysfunctional conflicts and hostility among students comparing with the peer evaluation method. The suggested method in this paper, which focuses on the job assignment of team project, could improve the efficiency of team-based learning in education course.

Future Projection of Extreme Climate over the Korean Peninsula Using Multi-RCM in CORDEX-EA Phase 2 Project (CORDEX-EA Phase 2 다중 지역기후모델을 이용한 한반도 미래 극한 기후 전망)

  • Kim, Do-Hyun;Kim, Jin-Uk;Byun, Young-Hwa;Kim, Tae-Jun;Kim, Jin-Won;Kim, Yeon-Hee;Ahn, Joong-Bae;Cha, Dong-Hyun;Min, Seung-Ki;Chang, Eun-Chul
    • Atmosphere
    • /
    • v.31 no.5
    • /
    • pp.607-623
    • /
    • 2021
  • This study presents projections of future extreme climate over the Korean Peninsula (KP), using bias-corrected data from multiple regional climate model (RCM) simulations in CORDEX-EA Phase 2 project. In order to confirm difference according to degree of greenhouse gas (GHG) emission, high GHG path of SSP5-8.5 and low GHG path of SSP1-2.6 scenario are used. Under SSP5-8.5 scenario, mean temperature and precipitation over KP are projected to increase by 6.38℃ and 20.56%, respectively, in 2081~2100 years compared to 1995~2014 years. Projected changes in extreme climate suggest that intensity indices of extreme temperatures would increase by 6.41℃ to 8.18℃ and precipitation by 24.75% to 33.74%, being bigger increase than their mean values. Both of frequency indices of the extreme climate and consecutive indices of extreme precipitation are also projected to increase. But the projected changes in extreme indices vary regionally. Under SSP1-2.6 scenario, the extreme climate indices would increase less than SSP5-8.5 scenario. In other words, temperature (precipitation) intensity indices would increase 2.63℃ to 3.12℃ (14.09% to 16.07%). And there is expected to be relationship between mean precipitation and warming, which mean precipitation would increase as warming with bigger relationship in northern KP (4.08% ℃-1) than southern KP (3.53% ℃-1) under SSP5-8.5 scenario. The projected relationship, however, is not significant for extreme precipitation. It seems because of complex characteristics of extreme precipitation from summer monsoon and typhoon over KP.