• Title/Summary/Keyword: Engineering team project

Search Result 433, Processing Time 0.028 seconds

A Capstone Design Case Study for Offshore Wind Power (해상풍력발전 캡스톤 디자인 사례 연구)

  • Woo, Jinho;Na, Won-Bae
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.25 no.1
    • /
    • pp.167-180
    • /
    • 2013
  • A capstone design is regarded as one of cap courses in undergraduate engineering education because it requires most prerequisites and makes students experience real engineering design processes. There have been case studies to show how this subject should be organized, practiced, and optimized. This study shows one of the case studies by focusing offshore wind power, one of newly recognized renewable energy resources, especially targeting for the design of wind turbine foundation and submarine power cable protectors mainly because of current energy and global warming crisis. To pinpoint engineering design, the students'activities during the project and design procedures are monitored, evaluated, and recommended; hence, core factors are addressed to develop successful aim, theory, practice, and other necessities. These factors include creative problem solving abilities; recognition of engineering curriculum; selection of project theme based on significance, ripple effect, and education purpose; team organization by the full brain model; systematization of project process; realization of engineering design; and synthesis of evaluation. In the end, the aftermath and future works are discussed.

Database Education through Project-Based Learning (프로젝트기반학습을 통한 데이터베이스 교육)

  • Kim, Eun-Gyung
    • The Journal of Korean Institute for Practical Engineering Education
    • /
    • v.3 no.2
    • /
    • pp.47-52
    • /
    • 2011
  • Recently, in order to increase the effectiveness of engineering education, it is a trend to get out of teacher-centered, traditional pedagogical strategy which emphasizes knowledge delivery and to utilize diverse pedagogical strategies such as project-based learning, problem-based learning, and so on. Especially utilization of project-based learning(PBL) that is very effective to improve practical ability by doing projects which students can apply their knowledge learned in class has been increasing. By the way, although students work on one or more projects in your course, only the fact shouldn't say that you properly utilizes PBL. That is, many teachers make students perform projects in their courses, but only a few teachers properly utilize PBL. This paper presents PBL procedures, evaluation criteria on project subjects, an evaluation method of team project, an evaluation table of PBL accomplishment, etc. based on many years experience in PBL as a guideline for PBL in engineering education. Also, this paper proposes some complements for better PBL by analysing strength and weakness of PBL.

  • PDF

THE STUDY OF MULI-LEVEL PERFORMANCE MEASUREMENT APPROACH FOR VALUE MANAGEMENT OF CIVIL INFRASTRUCTURE PROJECTS

  • Jong-Kwon Lim;Min-Jae Lee;Dong-Youl Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1294-1299
    • /
    • 2009
  • Best value in value engineering has relation to cost and performance. But a severe problem in VE study of a project is to reduce value due to loss of performance, caused by focusing on cost reduction. Also a lack of understanding performance concept, no trial VE workshop as well as cost saving-based policy have not satisfied customer needs. A efficient and practical methodology for accomplishing best value in construction projects is proposed. This study developed a more objective approach for performance measurement approach of mega projects and suggested a systematic process of performance quantitative analysis verifying value improvement. The proposed performance measurement method would be very useful for better communication and consensus between stakeholders and VE team especially through value engineering.

  • PDF

Labor Vulnerability Assessment through Electroencephalogram Monitoring: a Bispectrum Time-frequency Analysis Approach

  • CHEN, Jiayu;Lin, Zhenghang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.179-182
    • /
    • 2015
  • Detecting and assessing human-related risks is critical to improve the on-site safety condition and reduce the loss in lives, time and budget for construction industry. Recent research in neural science and psychology suggest inattentional blindness that caused by overload in working memory is the major cause of unexpected human related accidents. Due to the limitation of human mental workload, laborers are vulnerable to unexpected hazards while focusing on complicated and dangerous construction tasks. Therefore, detecting the risk perception abilities of workers could help to identify vulnerable individuals and reduce unexpected injuries. However, there are no available measurement approaches or devices capable of monitoring construction workers' mental conditions. The research proposed in this paper aims to develop such a measurement framework to evaluate hazards through monitoring electroencephalogram of labors. The research team developed a wearable safety monitoring helmet, which can collect the brain waves of users for analysis. A bispectrum approach has been developed in this paper to enrich the data source and improve accuracy.

  • PDF

A Comparative Analysis of Students' Evaluations of Online and Offline Capstone Design Course

  • Kim, Moon-Soo
    • Journal of Engineering Education Research
    • /
    • v.25 no.1
    • /
    • pp.12-21
    • /
    • 2022
  • The College of engineering's capstone design is student-team-centred learning based on project-based learning and is one of the most important courses for students aiming to be competent professional engineers capable of solving real industrial problems. Therefore, in order to resolve the capstone problems, various face-to-face contacts such as frequent industrial site visits, multiple meetings with diverse people including team members, and repeated contacts with course-supervising and team-advising professors are prerequisite processes. However, according to the transition to fully online education due to the global pandemic of COVID-19, capstone design courses for 2020 and 2021 were also conducted online. Based on the modified students' evaluations of educational quality (SEEQ) with 3 perspectives such as curriculum, teaching-staff and students themselves, this study compares their evaluations of offline capstone designs from 2013 to 2019 and online capstone designs in 2020 and 2021 in the context of COVID-19. In 3 perspectives, the difference in students' evaluation of the online capstone between the beginning and the end of the course shows a positive effect, which is better than the offline capstone. Also, in various dimensions for each perspective, the online capstone shows a better evaluation than the offline capstone. These findings suggest that the online capstone design curriculum can be expected to have educational effects as well as students' satisfaction with the online curriculum in the future.

Relationships between Construction Client's Leadership and Best Practice for Project Success Empirical Finding from Best Practice Cases (건설사업 성공을 위한 발주자 리더십과 베스트 프랙티스 관계 연구)

  • Oh Young-Sup;Kim Han-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.216-219
    • /
    • 2004
  • Construction clients are the key player in that they initiate construction projects and are in a position to influence the efficiency and productivity of the projects. Construction projects by nature require team-working so clients's leadership is the crux of project success. The objective of this paper is to suggest characteristics of construction clients' leadership in terms of best practice based on the analysis of project success cases. Four key elements of construction clients' leadership are identified and best practice from the case studies were related to the elements.

  • PDF

Noise Assurance Plan in the Project for Design a New Rolling Stock (철도차량 개발과정에서의 소음관리방안)

  • 정경렬;김경택;이병현
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2003.05a
    • /
    • pp.542-548
    • /
    • 2003
  • This paper describes an overall Noise Assurance Plan(NAP) in the project for developing a new rolling stock. In this paper, the procedure for implementing noise control activities for each development stage on the basis of the NAP is also described. The NAP was developed by KITECH(Korea Institute of Industrial Technology) and ODS(${\Phi}$degaard & Danneskiold-Samsoe in DENMARK). Generally, the main objective of NAP is that noise assurance plan applies to the establishment of organization and personnel's roles and responsibilities, set-up of overall procedure and internal audit program. Here, a few comments are made to the deviations of the actual procedure(G7 Project) relative to the suggested NAP presented. The major difference between the suggested NAP and the actual procedure was the late involvement of the noise consultant resulting in suggestions for design improvements could not be implemented due to the advanced stage of the design. Similarly, the important task of preparing sub-supplier specifications was performed. The proposed NAP will be an efficient tool for noise management in the R&D project for new rolling stock. Specially, in case that several companies and institutes are involoved in the R&D team

  • PDF

EVALUATION OF SUSTAINABILITY OF CONSTRUCTION OPERATIONS: A FRAMEWORK FOR THE NEW ZEALAND CONSTRUCTION INDUSTRY

  • Jasper Mbachu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.550-557
    • /
    • 2009
  • The concepts of 'sustainable development', 'sustainable construction' and 'green building' have been elevated to priority levels in all types and phases of construction project development worldwide. Consultants and contractors are now required to seriously consider the impact of their operations on the natural environment and the society, and consequently adopt sustainable construction practices in the development process to minimize and mitigate the negative impacts of their activities. However, existing sustainability rating tools apply to the design, post-construction and operation phases of a building; no tool exists for the rating of the performance of the contractor or the project team at the construction phase. This study aimed to develop a model for evaluating the sustainability of construction operations, drawing on the global best practice standards on sustainability. Practical applications of the model were carried out through case studies to evaluate the performances of fifteen construction firms in New Zealand. The developed model and the outcomes of the case studies were presented, including potential areas of weaknesses, strengths, constraints to achievement or adoption of sustainable construction practices and areas for improvement in the operations of the firms. The successful application of the developed model in practice shows its usefulness and ease of application. It is therefore recommended for adoption as a simple but effective system for measuring and reporting on sustainability performance or sustainability of construction operations of firms in New Zealand and elsewhere.

  • PDF

Evaluation of Dredging Capability of Pump Dredger based on Soil Conditions (토질변화에 따른 Pump 준설능력 산정)

  • Park, Hong-Shin;You, Young-In;Kim, Ha-Young
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.316-321
    • /
    • 2006
  • The Prouductivity of pump dredger varies very much depend on soil conditions is one of the main factors affecting construction period. Therefore the acculate evaluation of dredging capability of pump dredger considering soil conditions is a main task in dredging projects. After assesing the results of pump dredging on several Gwangyang port projects, some data of Japan standard for pump dredger are similar to those of actual results and a pump dredging capability table is prepared for future evaluation purposes.

  • PDF

Multitasking Façade: How to Combine BIPV with Passive Solar Mitigation Strategies in a High-Rise Curtain Wall System

  • Betancur, Juan
    • International Journal of High-Rise Buildings
    • /
    • v.6 no.4
    • /
    • pp.307-313
    • /
    • 2017
  • This paper outlines the processes and strategies studied and selected by the team during the design stages of the project for the incorporation of BIPV into the tower's façade. The goal was to create a system that helps reduce internal heating and cooling loads while collecting energy through photovoltaic panels located throughout the building. The process used to develop this façade system can be broken down into three stages. 1. Concept: BIPV as design catalyst for a high-rise building. 2. Optimization: Balancing BIPV and Human comfort. 3. Integration: Incorporating BIPV into a custom curtain wall design. The FKI Project clearly illustrates the evolution building enclosures from simple wall systems to high performance integrated architectural and engineering design solutions. This design process and execution of this project represent the design philosophy of our firm.