• 제목/요약/키워드: Engineering Project

검색결과 7,264건 처리시간 0.039초

THE RESEARCH OF CONSTRUCTION PROJECT MATERIALS REQUIREMENT SYSTEM

  • Pan Nai-Hsin
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.764-767
    • /
    • 2005
  • In the construction industry, materials management is one of the most important components in construction engineering life cycle. Materials management optimization is one of the research subjects in the field of construction management. In the materials management system of a construction project, the suitability of selecting procurement planning strategy will influence the result of project completion. This study conducts literature review at first and also refers the related issue in other industry's application. Associated with the characteristics of construction project in civil engineering and the concept of object oriented design applied in the materials management, this research is aimed to establish a construction materials requirement preliminary system.

  • PDF

A CASE STUDY OF CONSTRUCTION ENGINEERING FOR CABLE SUPPORTED BRIDGE BY COLLABORATIVE SYSTEM

  • Jung-Min Nam;Sung-Ho Kim;Jae-Hong Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.586-590
    • /
    • 2011
  • This paper presents the case study of the CE by collaborative system and proposes a model of the CM group for the cable supported bridge. The cable supported bridges have a large project scale and need a high level of construction method. Therefore an advanced construction management system is required for successful completion of project. The construction management (CM) group which control design management, construction plan, subcontract, technical support and R&D is organized for the cable supported bridge project. The CM group established a collaborative system with construction site and drew an effective management of cost, process, quality, safety for each project. Furthermore, the CM group established the procedure of construction management based on the construction engineering (CE) items and performed the project management on the construction phase. Efficiency of cost reduction and site control is maximized by using a collaborative system.

  • PDF

대형 국가 R&D 프로젝트의 기술관리 프로세스 : 파이로 프로젝트를 중심으로 (Technical Management Processes for Large National R&D Projects : Focused on Pyro Project)

  • 김정국;고원일;구정회;남효온
    • 시스템엔지니어링학술지
    • /
    • 제13권2호
    • /
    • pp.34-41
    • /
    • 2017
  • The Pyro project, one of the large national R&D project to construct Korea Advanced Pyroprocessing Facility (KAPF), which has many goals such as development of pyro technology and process equipment, design of equipment and facility, construction, and test operation, is now under research and development. To reduce uncertainty and risk of such complex project, the technical management processes in systems engineering standards and NASA handbook were reviewed, and then the ten common technical management processes were selected for the large national R&D project to meet its goal successfully. And the essential technical management processes were finally suggested for Pyro project in consideration of current situation of the project.

TOTAL RISK INDEX FOR ASSESSING RISK LEVELS OF OVERSEAS CONSTRUCTION PROJECTS

  • Du Yon Kim;Seung Heon Han;Heedae Park
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1414-1418
    • /
    • 2009
  • International construction projects typically manifest difficult, complex, and varied types of risk exposures; because of this, there is a need for accurate evaluation of risk-integrated performances during the timeframe of project execution. Given the financial crisis currently affecting the world economy recession, risk management has become a more crucial part for the success of international project management. However, the majority of risk management approaches, particularly for overseas projects, are focused primarily on simple forms of checklists, formalization of risk variables affecting project performance for a specific phase, or more complicated computational methods that restricting practical utilization in real-world projects; moreover, these methods lack the conceptual basis to broadly visualize the level of risk over all phases of a project. This study suggests an efficient, yet simple risk-integrated total index to successfully assess the risk levels of overseas construction projects. To this end, this paper first investigates the life cycles and key processes of decision-making for a given project and then derives formulas to represent the total risk index (TRI) along the key decision-making processes. In addition, the study examines the relationships between TRI and performance levels based on the analysis of 126 real-world project samples. Validations using the proposed TRI showed a high correlation to project performance, signifying the usefulness of the proposed approach for construction firms when investigating the level of risks and key areas for management focus.

  • PDF

Risk Analysis on Offshore Windfarm Industry in South Korea: Based on the Jeonnam Offshore Windfarm Project

  • Kim, Tae Hyun;Kim, Yea-Sang;Chin, Sangyoon;Pallesen, Kristian
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.204-212
    • /
    • 2022
  • Recently, the Korean government has been actively promoting the smart city as their strategic agenda. However, to build smart cities that are greener, the authors believe it is essential to rapidly transit conventional energy sources such as fossil fuels to renewable energy. Although there is a big potential for Offshore wind in Korea, there has not been a full-scale commercial offshore wind farm until today. Since Korea is relatively a new market compared to the EU, it can be risky for developers. The authors will introduce risk management best practices in the offshore wind industry applicable to the Korean environment. This paper will mainly introduce an offshore wind project size of 99 MW. The project is expecting a Finance Close (FC) in Q3 2022, so the project team has prepared a risk register with over 150 risks and levers throughout the project lifecycle. Overall risks include risks with Development Expenditure (DEVEX) impact, a Capital Expenditure (CAPEX) impact, and an Operating Expenditure (OPEX) impact. Based on the identified risks, a more qualitative assessment of Cost and Schedule Impact was conducted. In conclusion, a Monte Carlo simulation was performed to propose a quantitative risk assessment to evaluate a benchmark contingency of the project cost.

  • PDF

Resource-constrained Scheduling at Different Project Sizes

  • Lazari, Vasiliki;Chassiakos, Athanasios;Karatzas, Stylianos
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.196-203
    • /
    • 2022
  • The resource constrained scheduling problem (RCSP) constitutes one of the most challenging problems in Project Management, as it combines multiple parameters, contradicting objectives (project completion within certain deadlines, resource allocation within resource availability margins and with reduced fluctuations), strict constraints (precedence constraints between activities), while its complexity grows with the increase in the number of activities being executed. Due to the large solution space size, this work investigates the application of Genetic Algorithms to approximate the optimal resource alolocation and obtain optimal trade-offs between different project goals. This analysis uses the cost of exceeding the daily resource availability, the cost from the day-by-day resource movement in and out of the site and the cost for using resources day-by-day, to form the objective cost function. The model is applied in different case studies: 1 project consisting of 10 activities, 4 repetitive projects consisting of 40 activities in total and 16 repetitive projects consisting of 160 activities in total, in order to evaluate the effectiveness of the algorithm in different-size solution spaces and under alternative optimization criteria by examining the quality of the solution and the required computational time. The case studies 2 & 3 have been developed by building upon the recurrence of the unit/sub-project (10 activities), meaning that the initial problem is multiplied four and sixteen times respectively. The evaluation results indicate that the proposed model can efficiently provide reliable solutions with respect to the individual goals assigned in every case study regardless of the project scale.

  • PDF

Analyzing Project Similarity in Korean Bidding Documents Using BERT

  • Inwoo Jung;Hyunseok Moon;Jeongsoo Kim
    • 국제학술발표논문집
    • /
    • The 10th International Conference on Construction Engineering and Project Management
    • /
    • pp.359-366
    • /
    • 2024
  • In bidding documents, valuable information about the project exists in the form of text. When undertaking a new bid, it is necessary to refer to relevant documents from previous bidding projects, similar to the current one, to effectively understand the requirements and characteristics of the project. However, manually comparing and analyzing these documents is a time-consuming and costly process. Especially with the incorporation of emerging technologies like BIM, comparing and analyzing documents involving these new technologies requires a deeper level of expertise and understanding, posing a significant challenge. To tackle this knowledge gap, this study aims to develop a BERT-based approach to assess project similarity for Korean bidding documents. To achieve the research goal, a two-stage strategy was adopted: 1) the development of a Korean tokenizer for bidding documents in BIM technology, and 2) word embedding using BERT and project similarity analysis employing cosine similarity. The developed BERT-based similarity analysis model can automatically evaluate each project and identify the most similar project. By matching target projects with the best benchmarks, this research can assist individuals in making more accurate and timely decisions.

S/W개발자의 IT 프로젝트 참여 의도 연구: 조절초점에 따른 프로젝트 기술 최신성의 효과를 중심으로 (S/W Developer's IT Project Participation: Focusing on the Moderating Role of Regulatory Focus on the Effect of Technology Recency on Participation Intention)

  • 박요한;박도형
    • 지식경영연구
    • /
    • 제18권2호
    • /
    • pp.45-63
    • /
    • 2017
  • In the success of an IT project, the role of S/W developer in carrying out the project is critical and crucial. However, compared to its importance, there is only a few studies on the role of human resources in software engineering field, mainly focusing on technology. Based on regulatory focus theory, this study examines how the effect of technology recency on developer's intention to participate in the IT project changes depending on the regulatory focus of the software developer. As a result of the experiment, it was confirmed that there is a difference in the effect of technology recency on project participation intention according to the condition of developer's regulatory focus. This study is meaningful because it extends regulatory focus theory to software engineering field and made theoretical contribution to the research field of behavioral software engineering. In practical, it was possible to suggest a way to improve the intention of the developer to participate in the project, by understanding the software developer in the IT project, considering the software developer propensity and project characteristics.

An Information-based Forecasting Model for Project Progress and Completion Using Bayesian Inference

  • Yoo, Wi-Sung;Hadipriono, Fabian C.
    • 한국건설관리학회논문집
    • /
    • 제8권4호
    • /
    • pp.203-213
    • /
    • 2007
  • In the past, several construction projects have exceeded their schedule resulting in financial losses to the owners; at present there are very few methods available to accurately forecast the completion date of a project. These nay be because of unforeseen outcomes that cannot be accounted for earlier and because of deficiency of proper tools to forecast completion date of said project. To overcome these difficulties, project managers may need a tool to predict the completion date at the early stage of project development. Bayesian Inference introduced in this paper is one such tool that can be employed to forecast project progress at all construction stages. Using this inference, project managers can combine an initially planned project progress (growth curve) with reported information from ongoing projects during the development, and in addition, dynamically revise this initial plan and quantify the uncertainty of completion date. This study introduces a theoretical model and proposes a mathematically information-based framework to forecast a project completion date that corresponds with the actual progress data and to monitor the modified uncertainties using Bayesian Inference.

A STUDY ON THE DEVELOPMENT OF A COST MODEL BASED ON THE OWNER'S DECISION MAKING AT THE EARLY STAGES OF A CONSTRUCTION PROJECT

  • Choong-Wan Koo;Sang H. Park;Joon-oh Seo;TaeHoon Hong;ChangTaek Hyun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.676-684
    • /
    • 2009
  • Decision making at the early stages of a construction project has a significant impact on the project, and various scenarios created based on the owner's requirements should be considered for the decision making. At the early stages of a construction project, the information regarding the project is usually limited and uncertain. As such, it is difficult to plan and manage the project (especially cost planning). Thus, in this study, a cost model that could be varied according to the owner's requirements was developed. The cost model that was developed in this study is based on the case-based reasoning (CBR) methodology. The model suggests cost estimation with the most similar historical case as a basis for the estimation. In this study, the optimization process was also conducted, using genetic algorithms that reflect the changes in the number of project characteristics and in the database in the model according to the owner's decision making. Two optimization parameters were established: (1) the minimum criteria for scoring attribute similarity (MCAS); and (2) the range of attribute weights (RAW). The cost model proposed in this study can help building owners and managers estimate the project budget at the business planning stage.

  • PDF