• Title/Summary/Keyword: Energy plant

Search Result 3,892, Processing Time 0.035 seconds

FAULT-TREE-BASED RISK ASSESSMENT FOR DYNAMIC CONDITION CHANGES

  • Kang, Hyun-Gook;Jang, Seung-Cheol
    • Nuclear Engineering and Technology
    • /
    • v.39 no.2
    • /
    • pp.123-128
    • /
    • 2007
  • In order to apply a static fault-tree (FT) method to a system or a plant whose configuration changes dynamically, condition gates and a post processing method are used to effectively accommodate these changes. An operator's performance change, which can be caused by these configuration changes, should also be considered to assess the risk to a plant in a more realistic manner. This study aims to develop an integrated framework to accommodate various configuration changes and their effect on an operator’s performance by using the FT model. We applied a condition-based human reliability assessment (CBHRA) method to consider various conditions endured by an operator. That is, we integrated the CBHRA method with the conventional post processing method for modeling the system configuration changes. The effect of the condition monitoring systems installed in a plant is also considered. In this study, we show an example application of the integrated framework to a probabilistic safety assessment for the shutdown phase of a nuclear power plant.

Effect of tidal current turbine using the discharge gate of Siwha tidal power plant on the tidal power generating (시화조력발전소 방류 수문을 활용한 조류발전이 조력발전에 미치는 영향)

  • Kim, Youngjoon;Kim, Yongyeol;Cho, Yong;Ko, Jaemyoung
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.236.2-236.2
    • /
    • 2010
  • The tidal current power is the power plant by installing the turbine or rotor where the tidal speed is fast. This system converting the horizontal movement to rotating energy. Tidal power turbine is needed for the dam to utilize the pressure difference. However, tidal current power using the only flow. The tidal current power was evaluated as the impact on the marine environment surrounding was less and the development of eco-friendly way. In this article, we calculated the effect of tidal current turbine on the tidal power generating by mean of CFD. With these calculated results, we checked the possibility of tidal current power using tidal power plant the discharge gate.

  • PDF

Life Cycle Assessment for the Business Activities of Green Company -2. Mass Balance and Environmental Improvement (녹색기업의 사업활동 전 과정에 대한 환경성 평가 -2. 물질수지 및 환경개선)

  • Shin, Choon-Hwan;Park, Do-Hyun
    • Journal of Environmental Science International
    • /
    • v.22 no.4
    • /
    • pp.425-433
    • /
    • 2013
  • A mass balance of process was calculated by using the analysis of basic unit and environmental assessment of all the processes of Busan fashion color industry cooperative that operates a combined heat and power plant and a bio treatment plant. The mass balance for the combined heat and power plant was done, based on boiler and water treatment processes while each unit reactor was used for the bio treatment plant. From the results above, a resource recycle network, a treatment flowchart for food waste water/wastewater treatment and a carbon reduction program were established.

Second-Order Perturbation Solutions of Liquid Pool Spreading with Instantaneous Spill (순간 누출된 액체의 확산에 관한 2차 섭동 해)

  • Kim, Myung-Bae;Do, Kyu-Hyung;Han, Yong-Shik;Choi, Byung-Il
    • Journal of Hydrogen and New Energy
    • /
    • v.21 no.6
    • /
    • pp.513-518
    • /
    • 2010
  • In the present work the second-order perturbation solutions of the simple physical model for liquid pool spreading is obtained for the case of instantaneous spill. To generalize the solution governing equations are non-dimensionalized, and two dimensionless parameters, dimensionless evaporation rate and aspect ratio of the initial pool, are identified to control the governing equations. The dimensional governing equations have three parameters. The second-order solution improves fairly the first-order solution for the pool volume.

Technical Trend of Receiver for Solar Power Tower (타워용 태양열발전 시스템 흡수기 기술동향)

  • Kim, Jong-Kyu;Kim, Jin-Soo;Lee, Sang-Nam;Kang, Yong-Heack
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2008.05a
    • /
    • pp.161-164
    • /
    • 2008
  • For the development of solar thermal power tower plant from the early 80' to today, various kinds of receiver have been tested and evaluated. Most of 1st generation receiver used water/steam as a working fluid to operate steam turbine and now the first commercial solar power tower PS-10 also makes saturated steam. However, to increase thermal efficiency of storage system and to obtain practical use of solar energy, molten salt system have been used from THEMIS project in France at 1984. The Solar Tres plant of 17 MWe power generation will be constructed in Spain and have plan to operate 24 hours in summer. The air volumetric receiver system can be integrated with combined cycle of gas turbine and HRSG and also with steam turbine easily. Therefore, related researches to develop higher efficient solar power tower plant and to operate with stable are widely performed in the world.

  • PDF

국내 무연탄 발전소 혼소율 변화에 따른 탈황 특성 연구

  • Kim, Jeong-Yu;Park, Dae-Yeong;Lee, Jae-Heon;Mun, Seung-Jae
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2008.03b
    • /
    • pp.84-87
    • /
    • 2008
  • The sulfur oxides is one of important materials to come about air pollution at thermal plant consuming fossil fuel. The several flue gas desulfurization equipments are installed and operated to decrease sulfur oxides. The flue gas desulfurization of our thermal plant is designed for optimizing flue gas desulfurization technical development and research by Korea Electric Power Research Institute. We operate this desulfurization equipment. Now, our country imports nearly 97 percentage of the energy source and competes with the world for the energy because of the rise of raw materials cost. The fuel cost decrease of power plants is the most important factor of the operation. The fuel used in the experiment is the domestic anthracite from Kangwon Taeback and the bituminous coal from Russia,Taldinsky Mine. This Study is experimental investigations of desulfurization characteristics for domestic anthracite power plant by increasing bituminous coal. We surveyed possible parameters and conducted the performance about desulfurization equipment in Y.D thermal power plant.

  • PDF

Ocean Current Power Generation using sea water discharged from Turbine Generator and Gate Channel of Tidal Power Plant (조력발전소의 수차발전기 및 수문도수로 방출수를 이용한 해류발전)

  • Jang, Kyung-Soo;Lee, Jung-Eun
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2008.03b
    • /
    • pp.180-183
    • /
    • 2008
  • This paper is about the ocean current power generation using sea water incoming into the lake surrounded by barrages and sea water discharged from a dam made of artificial structures. In operation of a tidal power plant, the sea water discharged from a turbine structure and a gate structure of a tidal power plant is faster than the tidal current caused by tides in nature and has better characteristics than that to run ocean current turbines. It is shown that the sea water discharged after generating electricity through a turbine generator of a tidal power plant and the sea water discharged from a gate structure of a tidal dam still have kinetic energy high enough to run an ocean current turbine and produce valuable electricity.

  • PDF

A Study on the Design Method and the Effect Analysis for the Introduction of the Integrated System Model of Individual Urban Utility Plants (에너지공급시설 및 환경기초시설의 복합화 방안 및 적용효과 분석)

  • Lee, Tae-Won;Kim, Yong-Ki
    • Proceedings of the SAREK Conference
    • /
    • 2005.11a
    • /
    • pp.235-240
    • /
    • 2005
  • Recently urban utility plants in urban areas of Korea, such as energy supply systems, municipal waste incineration systems, sewage treatment systems and so on, have caused some critical troubles, for instance the insensitive response to the seasonal or daily variation of loads, the low system efficiency and inefficient use of energy because of the large-scale system located a great distance. Therefor the design method of optimal integrated system model of various urban utility plants proposed in this study suitably to the present situation of Korea. Also, the effect analysis for the introduction of compound utility plants was studied for a new town model on a 60,000 persons scale. As the results we found that the complex plant was superior to individual urban utility plant in side of the initial investment expenses, the operating cost and other reasons.

  • PDF

Analysis of the Performance Test Results of a Heat Pump for Closed Cooling Water Heat Recovery on a Combined Thermal Power Plant (복합화력의 냉각수 배열회수를 위한 히트펌프의 성능평가 사례 분석)

  • Lee, Sung-Ho
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.26 no.11
    • /
    • pp.541-546
    • /
    • 2014
  • The present study was conducted to determine whether ESCO Business is success or not. ESCO Business recovers the investment costs by the energy savings resulting from complementing existing energy facilities. The guaranteed parameters are Quantity of Heat Recovery, and Generator output drop. The results of the Performance Test show that the Quantity of Heat Recovery increased by 11.52 Gcal/h, and Generator output decreased by 0.234 MW, which satisfied the guarantee value.

Experimental Basic Study on Growth Characteristics of Plant with Various Liquids (액체 종류에 따른 식물의 성장 특성 기초 실험)

  • Park, Jeong-Yeon;Kim, Jeongbae
    • Journal of Institute of Convergence Technology
    • /
    • v.4 no.1
    • /
    • pp.1-4
    • /
    • 2014
  • This study was experimentally performed to show the growth characteristics of one specified plant with various liquids, which can be purchased easily. To do that, this study measured the number of leaves attached to the plant sample and the height of liquids everyday during almost 15 days on summer season in the laboratory room. From the experiments, we revealed that the remained number of leaves can be related with the liquid height.