• Title/Summary/Keyword: Embankment settlement

Search Result 205, Processing Time 0.043 seconds

Development of Intelligent Database system for softground instrumentation management (연약지반 계측관리를 위한 지능형 데이터베이스 시스템 개발)

  • 우철웅;장병욱
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1999.10c
    • /
    • pp.618-624
    • /
    • 1999
  • For many soft ground embankment projects , instrumentation programs for stability and settlement management is being essential . This usually leads to generate large volume of data, which can be used for further research. Database technique is most effective method for data management . Data produced by soft ground embankment instrumentation can not be used by itself but must be reproduced using geotechnical analysis technique. In this study, a intelligent database system for softground called IDSIM was developed to examine applicability intellgent database. . The IDSIM analysis instrumentation data automatically and present results by Web/DB interface successfully.

  • PDF

Parameteric Analysis for Up-lifting force on Slab track of Bridge (교량상 slab궤도의 상향력 민감도분석)

  • Choi, Sung-Ki;Park, Dae-Geun;Han, Sang-Yoon;Kang, Young-Jong
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1188-1195
    • /
    • 2007
  • The vertical forces in rail fasteners at areas of bridge transitions near the embankment and on the pier will occur due to different deformations of adjoining bridges caused by the trainloads, the settlement of supports, and the temperature gradients. The up-lifting forces is not large problem in the blast track because the elasticity of blast and rail pad buffs up-lifting effect. But, it is likely to be difficult to ensure the serviceability of the railway and the safety of the fastener in the end in that concrete slab track consist of rail, fastener, and track in a single body, delivering directly the up-lifting force to the fastener if the deck is bended because of various load cases, such as the end rotation of the overhang due to the vertical load, the bending of pier due to acceleration/braking force and temperature deviation, the settlement of embankment and pier, the temperature deviation of up-down deck and front-back pier, and the rail deformation due to wheel loads. The analysis of the rail fastener is made to verify the superposed tension forces in the rail fastener due to various load cases, temperature gradients and settlement of supports. The potential critical fasteners with the highest uplift forces are the fastener adjacent to the civil joint. The main influence factors are the geometry of the bridge such as, the beneath length of overhang, relative position of bridge bearing and fastener, deflection of bridge and the vertical spring stiffness of the fastener.

  • PDF

Analysis for Consolidation-Settlement of Embankment on Clay Layers (점토(粘土) 지반상(地盤上)의 성토(盛土)의 압밀침하(壓密沈下) 분석(分析))

  • Jung, Sung Gwan;Kwon, Moo Nam
    • Current Research on Agriculture and Life Sciences
    • /
    • v.2
    • /
    • pp.98-108
    • /
    • 1984
  • Generally, in case of constructing the embankments on the soft clay layers, one-dimensional consolidation settlement under the assumption of a middle position stress in a single layer makes a great difference with the integral value, ie. the final settlement. Consequently, to find how many equal segments of the soft clay layer are needed to converge into the integral value and which position should be taken as a position of mean stress, authors compared the theoretical value of the settlement due to one-dimensional consolidation with the practical value of the settlement due to two dimensional consolidation. The obtained results are as follows. 1) The practical value of the two-dimensional consolidation settlement can be estimated by the 74-83% theoretical value of the one-dimensional consolidation settlement. 2) When the soft clay layer was cut into 8-16 equal segments according to the depth, one-dimensional consolidation settlement converge into the integral value. 3) Assuming a total soft clay layer as a single one, the depth of a mean stress position is 0.29-0.37 of the thickness of the total soft clay layer. 4) The Hyperbola Method which presumes the long-term settlement from the short-term practical value of settlement is credible, because all practical value of the settlement are in safe side of the standard error of estimation and the correlation coefficient is up to 0.95.

  • PDF

A Study on Lateral Flow in Soft Grounds under Embankments for Road Constructions (도로 성토로 인한 연약지반의 측방유동에 관한 연구)

  • Kim, Junghoon;Hong, Wonpyo;Lee, Choongmin;Lee, Junwoo
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.9
    • /
    • pp.17-29
    • /
    • 2012
  • To investigate the characteristics of shear strength and soil deformation in soft grounds, in which various vertical drains were placed, two hundreds field monitoring data of embankments performed in thirteen road construction sites at west and south coastal areas of the Korean Peninsula were collected. At first, the relationship between settlement and lateral displacement was investigated into three stages, in which embankment construction works were divided into initial filling stage, final filling stage and stage after complete filling. And then, the relationship of surcharge pressures and embankment heights with undrained shear strength of soft grounds were investigated. The investigation on settlement and lateral displacement illustrated that the increment of lateral flow to the increment of settlement was low during initial filling stage, but increased gradually with filling and showed largest during final filling stage. After complete filling, the lateral displacement was converged, even though the settlement was increased continuously. Therefore, most of lateral flow was occurred during embankment filling. The ratio of the lateral displacement increment to the settlement increment was 20% for initial filling stage, which coincided with the one presented by Tavenas et al.(1979), but became 50% for final filling stage, which was half of the one presented by Tavenas et al.(1979). However, the ratio reduced to 1% to 9%, which was quite lower than the one presented by Tavenas et al.(1979). Shear deformations, even shear failures, were predicted in soft grounds under initial undrained shear strength, since the design heights of embankments were higher than the yield height in all the sites. However, embankment construction would be possible since the yield height became higher than the design height due to improvement of shear strength of soft grounds with application of the vertical drains. In order to perform safely embankments for road constructions, the embankment loads should be designed not to be exceed 5.14 times the initial undrained shear strength of soft grounds and to be less than 3.0 times the undrained shear strength improved with application of vertical drains in soft grounds.

A Study on Lateral Displacement of Caisson Constructed on Improved Ground (개량 지반에 설치된 케이슨의 측방변위에 대한 연구)

  • Kim, Myunghak;Lee, Sangwook;Yoon, Minseung;Han, Byungwon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.4
    • /
    • pp.33-41
    • /
    • 2011
  • In case of building up port facilities on soft ground, unsymmetrical surcharge of embankment, which make the excess pore water pressure to increase, causes to occur lateral displacement due to plasticity of soil. A study on lateral displacement and settlement of the caisson, which is installed on improved ground, was accomplished. The field measurement data and calculated values obtained from FEM program of Plaxis were compared and analyzed. For numerical analysis, the properties of soils, constructions stage and time were considered. Lateral displacement was measured at the point of inclinometers installed in front of caisson. Settlement was measured at the center of extra embankment behind of caisson. Comparison of measured and calculated for lateral displacement showed that the calculated value was greater than the measured, and increasing trend was different. The calculated value showed step increasing as step extra embankment applied, whereas the measured gradually was increased. For settlement of embankment, the amount of both measured and calculated were similar, but the trend was different like that of lateral movement.

The Reinforcement Effect of Stone Columns on Refuse Landfill (매립지반에 적용된 쇄석말뚝의 보강효과)

  • Lee, Bong-Jin;Bae, Woo-Seok;Lee, Jun-Dae
    • Journal of the Korean Society of Safety
    • /
    • v.15 no.2
    • /
    • pp.97-102
    • /
    • 2000
  • This paper presents the design, construction and performance of ground treatment to support road embankment on refuse landfill. Long-term settlement of refuse landfill is analysised by Sower and Yen/scanlon. As a results of site test, predicting settlement excess the allowable settlement and ultimate bearing capacity is not satisfied. The effectiveness of DDR(Deep Dynamic Replacement) is monitered by field tests (SPT, PBT, PMT) before, during and after construction of the stone columns. The ultimate bearing capacity for reinforced landfill by stone columns obtained from the in-situ test results has been compared with the existing theories. In municipal wastes landfill, settlement after treatment using stone column is satisfied to allowable residual settlement. Therefore, long-term stability can be gain in these cases.

  • PDF

Evaluation of the Degree of Consolidation using Settlement and Excessive Pore Water Pressure (침하량과 간극수압에 의한 압밀도의 평가(지반공학))

  • 이달원;임성훈;윤제식;김지문
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2000.10a
    • /
    • pp.444-450
    • /
    • 2000
  • This study was performed to analyze the degree of consolidation by the dissipation of excessive pore water pressure and final settlement prediction methods of the very soft clay. Hyperbolic method, Asaoka method and curve fitting method were used to compute the degree of consolidation. The degree of consolidation with excessive pore water pressure were used to compute, which considered the dissipation time with embankment construction. The degree of consolidation that was obtained by the peak excessive pore water pressure was less than in the case of the dissipation excessive pore water pressure. And, the degree of consolidation by the total settlement was nearly the same value that of layer settlement. The degree of consolidation that was obtained by excessive pore water pressure was larger than in the case of the settlement.

  • PDF

Limitation of Measurement System in Application of Angular Distortion Criterion to Structure Near Road Embankment (도로 성토 시 인근 구조물에 각변위기준 적용에 있어 계측시스템의 한계성)

  • Kim, Taehyung;Kim, Dongin;Kim, Yuntae;You, Sangho;Jung, Youngeun;Kim, Sungwoung
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.1
    • /
    • pp.43-51
    • /
    • 2014
  • Angular distortion due to differential settlement is one of the critical factors which influences on the stability and serviceability of a structure. The angular distortion criterion proposed by Bjerrum is generally used in practice. However, the measurement system used in field especially a road embankment site did not properly represent the angular distortion of a structure. The problem was related to the shortage and not proper installation of measurement gauges, and the incorrect understanding of the basic concept of angular distortion in interpretation of measurement data. These things were reveled by analyzing the measured data in the road embankment site. An improved measurement system has been suggested as a so-called "relative displacement measurement system" between columns with automatic measurement.

Bearing Capacity of Driven H-Piles in Embankment (성토지반에 타입된 H형강 말뚝의 지지거동)

  • 박영호;정경자;김성환;유성근;이재혁;박종면
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.173-182
    • /
    • 2000
  • To find axial and lateral responses of impact-driven H piles in embankment(SM), the H piles are instrumented with electric strain gages, dynamic load test is performed during driving, and then the damage of strain gages is checked simultaneously. Axially and laterally static load tests are performed on the same piles after one to nine days as well. Then load-settlement behavior is measured. Furthermore, to find the set-up effect in H pile, No. 4, 16, 26, and R6 piles are restriked about 1, 2, and 14 days after driving. As results, ram height and pile capacity obtained from impact driving control method become 80cm and 210.3∼242.3ton, respectively. At 15 days after driving, allowable bearing capacity by CAPWAP analysis, which 2.5 of the factor of safety is applied for ultimate bearing capacity, increases 10.8%. Ultimate bearing capacity obtained from axially static load test is 306∼338ton. This capacity is 68.5∼75.7% at yield force of pile material and is 4∼4.5 times of design load. Allowable bearing capacity using 2 of the factor of safety is 153∼169ton. Initial stiffness response of the pile is 27.5ton/mm. As the lateral load increases, the horizontal load-settlement behaves linearly to which the lateral load reaches up to 17ton. This reason is filled with sand in the cavity formed between flange and web during pile driving. As the result of reading with electric strain gages, flange material of pile is yielded at 19ton in horizontal load. Thus allowable load of this pile material is 9.5ton when the factor of safety is 2.0. Allowable lateral displacement of this pile corresponding to this load is 23∼36mm in embankment.

  • PDF

Behaviour of Embankment using Bottom Ash-Tire Shred Mixture (저회(Bottom Ash)와 폐타이어를 활용한 성토구조물 거동에 관한 연구)

  • Lee, Sung Jin;Shin, Min ho;Koh, Tae hoon;Hwang, Seon Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.1C
    • /
    • pp.21-31
    • /
    • 2009
  • Based on the proven feasibility of bottom ash and tire shred-soil mixtures as lightweight fill materials, tire shred-bottom ash mixtures were suggested as a new lightweight fill material to replace the conventional construction material (soil) with bottom ash. Therefore, we carried out the field compaction test and performance test of large scale embankment in order to evaluate their suitability for the use of lightweight fill materials. In these tests, we could assess the settlement, earth pressure, stress-strain relation, vibration of large scale embankment which were made with tire shred-bottom ash mixture and the conventional fill material(weathered soil) respectively. The earthpressure and vibration transmission was decreased and the settlement behaviour of the 2 materials (tire shred mixture and weathered soil) was measured similarly under static/cyclic loading condition.