• 제목/요약/키워드: Embankment design

검색결과 185건 처리시간 0.021초

연약지반에서의 말뚝기초 교대의 측방유동 대책공법 적용에 관한 연구 (A study on the stability of pile bridge abutment on soft ground undergoing lateral flow)

  • 오일록;채영수
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2003년도 봄 학술발표회 논문집
    • /
    • pp.753-760
    • /
    • 2003
  • An existing studies concern about movement of pile bridge abutments. However, lateral displacement cause the serious failure of bridge by embankment under soft soil lateral flow A intention is obtained by analyzing the relationship between the safety factor of evaluation for lateral movements. Precise investigation and analysis are performed, in which the lateral movement of bridge abutments has occurred, and construct design strut-slab between bridge abutments in order to restraint lateral flow. As a result of this study, it was found that when evaluation for lateral movements is allowed to use Tschebotarioff's method and lateral flow decision number (I) and revision lateral flow decision number (M$_{I}$) by Korea Highway Corporation. Most important thing is decision of pressure of lateral flow at this case. Tschebotarioff's isoscales triangle method have no trouble analysis of pressure of lateral flow. Strut-slab method are nearly not have constructed case in this field site study that applied method. The method are between abutments combined steel strut and reinforced concrete slab. This method are effective restraint lateral flow but have little difficulty if long span bridge between abutments.s.

  • PDF

비탈면 녹화 설계 및 시공 잠정 지침 적용사례 -농소어모구간 국도비탈면을 중심으로- (Application Case of Test of Revegetation Measures on Design of Slopes Revegetation and Tentative Instruction on Construction Work -With a Case of Slopes Along the National Road Between Nongseo and Eomo -)

  • 전기성
    • 한국환경복원기술학회지
    • /
    • 제10권4호
    • /
    • pp.95-108
    • /
    • 2007
  • Test application of revegetation measure was made on the roadside slope damaged by Nongseo-Eomo national road improvement project in a bid to prevent the soil from being washed out as well as to restore the ecological environment, and the survey for assessment of the effect of slope revegetation measures was conducted, beginning May 11 through Nov 7, 2006. In the wake of comprehensive reviewing and evaluating the surrounding topographic environment, physical and chemical characteristics of soil, germination of revegetation plants, analysis of bio mass, covering ratio and the plants appeared, measure b was found to have been most appropriate to cut blasting rock slope, and alternatively measure c. For cut ripping rock slope, measure c-1 appeared to be effective in revegetation effect, and alternatively, b-1.When it comes to cut soil slope, measure c-2 was found to be effective, and b-2 to be a good alternative. And for embankment soil slope, measure b-3 appeared to be most efficient in revegetation effect and measure f as alternative.

비탈면 녹화 설계 및 시공 잠정 지침 적용사례 -김천어모구간 국도비탈면을 중심으로- (Application Case of Test of Revegetation Measures on Design of Slopes Revegetation and Tentative Instruction on Construction Work -With a Case of Slopes Along the National Road Between Gimcheon and Eomo -)

  • 전기성
    • 한국환경복원기술학회지
    • /
    • 제10권4호
    • /
    • pp.83-94
    • /
    • 2007
  • Test application of revegetation measure was made on the roadside slope damaged by Gimcheon-Eomo national road improvement project in a bid to prevent the soil from being washed out as well as to restore the ecological environment, and the survey for assessing the effect of slope revegetation measures was conducted, beginning Sep 7 through Sep 20, 2006. In the wake of comprehensive reviewing and evaluating the surrounding topographic environment, physical and chemical characteristics of soil, germination of revegetation plants, analysis of bio mass, covering ratio and the plants appeared, revegetation measure C was found to have been most effective and desirable for further application in the area. Viewing the specific applicability by the area, revegetation measure C and C-1 appeared to be appropriate for blasting rock slope and ripping rock slope as they are efficient in preventing the slope from being washed out and in early revegetating. And revegetation measure B deemed to be effective to blasting rock slope or ripping rock slope as an alternative. And for cut slope, vegetation measure C-2 was judged to be more effective than measure D or E, while measure C-3 would be appropriateto embankment slope.

한강 이촌-반포 만곡부의 편수위 연구 (Study of Superelevation of Ichon-Banpo Bend Flow in the Han River)

  • 이정규;김주영;박현진;강지예
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2009년도 학술발표회 초록집
    • /
    • pp.810-814
    • /
    • 2009
  • Two dimensional steady and unsteady numerical models are applied to bend reaches of the Lower Han River and the superelevation at the Ichon-Banpo bend area of Han River was observed. The flow characteristics in the meandering river are complicated due to the effects of the centrifugal force. The centrifugal force makes the outside water surface level increase and the outside velocity decrease. To study this complex flow studying two dimensional flow is important and useful to design flood control countermeasures, the analysis of sedimentation and the site selection of intake structures. Especially, the superelevation between inside and outside of the bend should be considered to determine the height of embankment. In this study, the water surface elevations in both bank sides of the bend were measured in two reaches during floods in 2007 and 2008. And then the two-dimensional simulation using RMA-2 model was carried out. The upstream and downstream boundary conditions on bend reaches were determined by FLDWAV which is one-dimensional unsteady model. Finally, the observed data are compared with simulation results and the results of the several superelevation formulas, and the flow characteristics of the bend are discussed.

  • PDF

사질토 지반 위에 축조된 제방의 액상화 및 최적 대책 공법 (Liquefaction of Embankments on Sandy Soils and the Optimum Countermeasure against the Liquefaction)

  • Park, Young-Ho;Kim, Sung-Ryul;Kim, Sung-Hwan;Kim, Myoung-Mo
    • 한국지반공학회논문집
    • /
    • 제16권3호
    • /
    • pp.15-21
    • /
    • 2000
  • 액상화되기 쉬운 모래지반 위에 축조된 제방의 지진시 거동을 조사하고 액상화 경감을 위한 대책공법의 효과를 비교하기 위하여 12가지 경우에 대해 진돈대 시험을 수행하였다. 본 시험에는 널말뚝, 자갈배수재, 모래다짐 말뚝과 강관말뚝 등의 대책공법이 적용되었다. 진동대 시험에 사용된 투명토조의 길이는 194cm이고 폭은 44cm 그리고 높이는 60cm이다. 기초지반은 포화된 모래이며 수중침강법을 적용하여 상대밀도 약 30%로 조성되었다. 이 포화된 느슨한 모래지만 위에 15cm 높이의 제방이 경사 1:1.5로 축조되었다. 진동대 시험시 제방과 기초지반의 거동을 측정하기 위해서 간극수압계 12개, 가속도계 4개 및 LVDT 2개가 시험모델에 설치되었다. 진동대의 크기는 2m$\times$2m이며, 진동시의 입력가속도는 0.1g에서 시작하여 최고 0.4g까지 증가시켰다. 본 모델에 적용된 공법 모두가 일반적인 진동법위에서 액상화 발생을 억제시키는데 유용한 것으로 증명이 되었으며, 그 중에서 모래다짐말뚝이 액상화로 인한 피해를 감소시키는데 가장 효과적인 것으로 나타났다. 또한 각각의 대책공법에 대한 최적 배치안의 본 연구에서 제시되었다.

  • PDF

발전량 비교를 통한 창조식 조력발전의 기동낙차 결정에 관한 연구 (A Study on the Determination of Starting Head by Comparing The Generating Power in Single Action Tidal Power Plant)

  • 김현한;김광호
    • 전기학회논문지
    • /
    • 제67권5호
    • /
    • pp.680-687
    • /
    • 2018
  • Because of its predictability of the energy cycle and huge scale power output, the ocean energy from tidal power utilization has always received attention as a great energy source, even though its development cost, including the embankment construction, is so much higher than that of any other energy source. Nevertheless, nowadays many projects are being planned on account of institutional support from the government and the recent advance of construction technology. In Korea, the new industry field operating and managing the tidal power plant has already opened. But we are facing a number of problems for optimal operation of tidal power plant that are a lack of operation experience and a skill of professional management and others. This paper suggests a novel way to determine the starting head of power generation by generating power comparison method For this new method, the paper discusses many factors including changing the volume of the basin, the number of operating turbines and gates and forecasting the tidal amplitude and the characteristic curve of turbine and gate. Finally we verified that it can increase about 2% an annual power generation compared with the conventional method using the original operational function made in the plant design process.

새만금 지역의 액상화 평가 및 향후 구조물 기초 설계시 액상화 영향의 고려방안 (I) (Liquifaction Evaluation of Saemangeum Area and the Considerations of Liquifaction Effect to the Foundations of Structures in Near Future (I))

  • 김유성;고형우
    • 한국지반신소재학회논문집
    • /
    • 제10권2호
    • /
    • pp.91-100
    • /
    • 2011
  • 본 연구에서는 국내의 대표적인 매립지인 새만금 방조제 지역을 대상으로 액상화 평가방법에 따른 액상화 발생 가능성을 예측하였다. 액상화 평가방법에 따라 장 단주기 실제 지진기록을 이용해 지진응답해석과 반복삼축압축시험에 의한 액상화 평가를 수행하였다. 평가 결과 대상지역의 준설매립토의 입도분포 곡선은 액상화 가능성이 매우 높은 범위에 해당하고 있고, 검토대상 지역의 깊이 10m 이내에 기초 또는 지중구조물이 구축될 경우 액상화에 따른 피해가 예상되고 있어, 향후 기초 또는 구조물 설치 위치에 따른 세밀한 검토가 필요한 것으로 판단된다.

DEVELOPMENT OF A FLOOD PROTECTION SYSTEM BY THE USE OF MODEL TESTS

  • Knoblauch Helmut;Goekler Gottfried;Heigerth Guenther
    • Water Engineering Research
    • /
    • 제3권1호
    • /
    • pp.45-55
    • /
    • 2002
  • The Szentgotthard Flood Protection Project is located in the southeasters part of Austria, very close to the Hungarian border and to the Hungarian town of Szentgotthard situated near the Junction of the rivers Lafnitz and Raab. During heavy rainstorms, this area has always been liable to severe floodings, affecting the town itself and upstream reaches, where major industrial and commercial development is planned. In order to solve these problems, several solutions have been developed by means of a series of model tests performed at the hydraulic laboratory of the Technical University of Graz, Austria. The model was constructed to scales 1:75 (lengths) and 1:25 (heights). This trebled scale allowed greater accuracy in the measurement of discharge depths. The results from the model tests have led to the following proposals: - Construction of a flood relief trough with an inflow section 3.5 km upstream of the junction of the rivers Lafnitz and Raab. - Use of a former river bed for the flood relief trough. - Design of a lowered embankment crest section to pass one-third of the maximum flood flow of the river Lafnitz. - Connection of the flood relief trough to the Lahnbach stream, a tributary of the river Raab.

  • PDF

EARTH DAM의 비탈면 기울기 결정에 관한 연구 (A Study on Side Slope Determination of Earth Dam)

  • 이원희;김시원
    • 한국농공학회지
    • /
    • 제23권1호
    • /
    • pp.86-102
    • /
    • 1981
  • The soil test data of 28 earth dams, scheduled to be constructed in Kore3, were selected for this study. The safety factors of their side slops were computed using Fellenius' "slice Method" by computer. The results summarized in this study are as follows; 1. Dam sections can be easily determined by fig.10 without a time consuming trial and error calculations of assumed sections. 2. For the economical design of earth dam sections, it was found that more cohesive soil was suitable for lower dams(dam height less than 25m) and soils with a higher friction angle was better for higher dams 3. In the case that used soil materials have the same Internal friction angle, side slope increase was almost same. 4. The relationship between side slope and friction angle was found as log.S=a tan ø+b (Fig. 7) 5. The relationship between side slope and cohesion (c) was also found as log. S=a c+b (Fig. 8) 6. The change of safety factors due to the change of central core materials was very little (Table-2) 7. The decrease of safety factors according to the unit weight increase of embankment materials was negligible. 8. In general the relationship between the wet unit weight and the saturated unit weight was r sat = (rt)$^2$+0. 140. This study will contribute to the determination of economic and safe planning and designing of earth dams, embankments and cutting side slopes.

  • PDF

중금속 오염 농경지 토양의 안정화 처리공법 효과 비교 (A Comparison on the Effect of Stabilization Methods for Rice Paddies contaminated by Heavy Metal)

  • 유찬;윤성욱;박진철;이정훈;최승진;최덕용;이지민
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 춘계 학술발표회
    • /
    • pp.819-835
    • /
    • 2009
  • In order to investigate the field application of selected stabilization methods(cover soil method, surface and total interval treatment of embankment method) on rice paddies contaminated by heavy metals, column test was carried out with heavy metal-contaminated soils collected from rice paddies around abandoned mine site. Columns were made by acrylic and filled with untreated soil, treated soil mixed with amendments(lime stone and steel refining slag) and uncontaminated cover soil according to the design report. Distilled water was discharged into the columns with the velocity of 1 pore volume/day. During test, pH, EC, and heavy metal concentration were measured in the regular term. The column test result showed that the selected stabilization methods were effective remediation method to stabilize heavy metals in paddy soils, but it was also expected that application of surface treatment methods was required the careful observation on pH variation due to the lowest increment.

  • PDF