• Title/Summary/Keyword: Elevator load-test

Search Result 7, Processing Time 0.023 seconds

New Inspection Skill for Load-test of Hydraulic Elevator without Actual Loads (엘리베이터 하중시험 대체 검사기법 개발)

  • Heo, Yun-Seop;Eom, Yong-Gi
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.62 no.3
    • /
    • pp.127-132
    • /
    • 2013
  • In order to check traction of the elevator, the load-test is positively necessary on the inspection of elevator in Korea. So actual loads are used in the elevator car for the load-test. However, some of advanced countries in Europe, for example Germany, are using the alternative method with no load test instead of traditional load-test. Commonly hydraulic elevator, compared to passenger elevator is mainly used for loading heavy weights. It requires a great deal of labor to carry out load-test. The reason is why we developed a new inspection skill for the load-test of hydraulic elevator without actual loads. The results of studies show that the new method of the load-test can be replace the traditional load-test.

Structural Performance Evaluation of System Scaffolding for Elevator Installation Work (엘리베이터 설치 작업용 시스템 비계의 구조 성능 평가)

  • Jong Moon Hwang;Gi Yeol Lee
    • Journal of the Korean Society of Safety
    • /
    • v.38 no.3
    • /
    • pp.61-68
    • /
    • 2023
  • This study performed a structural performance evaluation of a system scaffolding for elevator installation work developed in previous studies. The structural performance was evaluated via a structural test conducted to apply the working load specified in the design standard. The deflection of the horizontal member and the stress of each member constituting the system scaffolding were measured. Consequently, the structural safety evaluation including structural behavior and required performance was performed using the deflection and stresses measured from the structural test. The structural test and safety evaluation results based on the heavy working load corresponding to the design load indicated that the deflection, which is the performance criterion of the horizontal member, did not exceed the allowable value. Further, each member's stress, which is a safety evaluation indicator, did not exceed the allowable strength for both horizontal and vertical members with bending behavior and fordable bracing with tensile behavior, while also satisfying the required safety factor. In addition, the results confirmed the safety against deformation, partial damage, and destruction owing to excessive and maximum load. Therefore, the system scaffolding developed in this study satisfies both the structural performance and safety required by the design standards; thus, it can be applied to elevator installation work sites.

Estimation of Elevator Wire Life Using Accelerated Degradation Model (가속 열화 모형을 이용한 엘리베이터 와이어 수명 예측)

  • Kim, Sang Boo;Kim, Seung Ho
    • Journal of Korean Society for Quality Management
    • /
    • v.43 no.3
    • /
    • pp.409-420
    • /
    • 2015
  • Purpose: This study is to estimate the life of elevator wire rope by using the accelerated degradation test with two accelerating variables of applied load and corrosion. Methods: Linear regression method is used to find the pseudo life of elevator wire rope at each combination of accelerating variables and the median life of elevator wire rope at use condition is estimated under the assumption that the life of elevator wire rope follows lognormal distribution. Results: The particular case study demonstrated that the results of the elevator wire life estimation by using the proposed method can provide the better solutions than existing methods. Conclusion: It can be economical to use accelerated degradation model for estimating the life of elevator wire rope.

A Study on the Improvement of Easy Elevator Equipment (간이용 엘리베이터 장치 개선에 관한 연구)

  • Wee, Sung-Dong;Gu, Hal-Bon
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2001.09a
    • /
    • pp.82-88
    • /
    • 2001
  • Manufactured easy elevator can drives from the first floor to fifth floor as sequence control circuit in cause opening than existing equipment of experiment and practice, the structure of in the first implementation process are hand-worked control component with push-button, L/S and relay, it is structured a lamp to express that the door open and moving of cage by mechanical action of For/Rev motor-braker of which load. The second structure of implement process to control from the first floor to the fifth floor with the PLC elevator program can control by the sensor of hand-operated function of L/Sl~L/S5 in time that the S/Wl~S/W5 of PLC control panel operates to the For/Rev. The function of two kind process that an elevator is driven by PLC program and the sequence control relay circuit is a mechanical relay sequence control field and it is equipment apparatus of it to get appropriately the technology of For/Rev in that mechanical operating cause of a load using the PLC program. Also the wring circuit using a plug, dissembly. the circuit and the principle of component, and PLC program with the function test can be used the implementation field to the total technology theory about FA.

  • PDF

Development of DC Controller for Battery Control for Elevator Car

  • Lee, Sang-Hyun;Kim, Sangbum
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.13 no.2
    • /
    • pp.103-111
    • /
    • 2021
  • Among transport vehicles, Special Vehicles (SVs) are seriously exposed to energy and environmental problems. In particular, elevator cars used when moving objects in high-rise buildings increase the engine's rotational speed (radian per second: RPM). At this time, when the vehicle accelerates rapidly while idling, energy consumption increases explosively along with the engine speed, and a lot of soot is generated. The purpose of this paper is to develop a bi-directional DC-DC converter for control of vehicle power and secondary battery used in an elevated ladder vehicle (EC) used in the moving industry. As a result of this paper, the performance test of the converter was conducted. The charging/discharging state of the converter was simulated using DC power supply and DC electronic load, and a performance experiment was conducted to measure the input/output power of the converter through a power meter. Through this experimental result, it was confirmed that the efficiency was more than 92% in Buck mode and Boost mode at maximum 1.2kW output.

Wind Tunnel Test of an Unmanned Aerial Vehicle (UAV)

  • Chung, Jin-Deog;Lee, Jang-Yeon;Sung, Bong-Zoo;Koo, Sa-Mok
    • Journal of Mechanical Science and Technology
    • /
    • v.17 no.5
    • /
    • pp.776-783
    • /
    • 2003
  • A low speed wind tunnel test was conducted for full-scale model of an unmanned aerial vehicle (UAV) in Korea Aerospace Research Institute (KARI) Low Speed Wind Tunnel(LSWT). The purpose of the presented paper is to illustrate the general aerodynamic and performance characteristics of the UAV that was designed and fabricated in KARI. Since the testing conditions were represented minor portions of the load-range of the external balance system, the repeatability tests were performed at various model configurations to confirm the reliability of measurements. Variations of drag-polar by adding model components such as tails, landing gear and test boom are shown, and longitudinal and lateral aerodynamic characteristics after changing control surfaces such as aileron, flap, elevator and rudder are also presented. To explore aerodynamic characteristics of an UAV with model components build-up and control surface deflections, lift curve slope, pitching moment variation with lift coefficients and drag-polar are examined. The discussed results might be useful to understand the general aerodynamic characteristics and drag pattern for the given UAV configuration.

A study on structural performance of steel brackets in vertical shaft connected to double-deck tunnel (복층터널 연결 수직구용 철재브래킷 구조성능 연구)

  • Shin, Young-Wan;Min, Byeong-Heon;Nam, Jung-Bong;Lee, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.3
    • /
    • pp.363-375
    • /
    • 2019
  • Since the double-deck tunnel is deeply constructed in the city, it is necessary to secure the installation space of air supply and exhaust, escape passage stairs, elevator, distribution facilities and connection tunnels in the vertical shaft for the double-deck tunnel. Also, in order to minimize the effect of construction on adjacent area, it is necessary to construct the concrete structures at high speed in vertical shaft after tunnel excavation. Therefore, the slabs and the stairs in vertical shaft are needed to be constructed using precast concrete, and the rapid construction techniques of bracket for supporting the inner precast structure are needed. The bracket installation methods include cast-in-place concrete, precast concrete and steel. In this study, the improvement of the steel brackets with good economical efficiency and good workability was carried out in consideration of the improvement of the construction speed. We have developed a new bracket that is optimized through bracket shape improvement, anchor bolt position adjustment and quantity optimization. As a result of the structural performance test, it was confirmed that the required load supporting capacity was secured. As a result of structural performance test for bar type anchor bolt and bent anchor anchor bolt, it was confirmed that the required load carrying capacity was secured and that the load bearing capacity of bent anchor bolt was large.