• Title/Summary/Keyword: Elevator Maintenance

Search Result 52, Processing Time 0.029 seconds

Case History: Micropiling for Existing Foundation Retrofits (마이크로파일을 이용한 기초보강공법의 국내 적용 사례)

  • Lee, Jung-Hoon;Choi, Chang-Ho;Cho, Sam-Deok;Lee, Ki-Hwan;Jo, Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.359-365
    • /
    • 2008
  • As housing supply ratio has become over 100%, the strategic vision of government's policies has been changed from new construction to maintenance and regeneration of old architectural-structures. This fact has brought a light on the reconstruction and remodeling industries and a need for retrofit and rehabilitation techniques of existing foundation. Various methods of foundation for architectural-structures do exist. Among them, micropiling technologies are increasingly applied in foundation rehabilitation and seismic retrofitting projects. Micropiling techniques provide environmental-friendly methods for minimizing disturbance to adjacent structures, ground, and the environment. The installation is possible in restrictive area and general ground conditions. The fact that the installation procedures cause minimal vibration and noise and require very low ceiling height makes the micropiling methods to be commonly used for underpin existing structures. Specialized drilling equipment is often required to install the micropiles for existing basement facilities. This paper presents a case study in which micropiles were constructed to support a superstructure for vertical extension of existing elevator core and provide accessibility to underground parking lot. It is intended to become useful reference for the similar remodeling project.

  • PDF

Development of Onshore Offshore Tower Elevator with load distribution endless winder and integrated control panel (하중 분산형 엔드리스 와인더와 통합형 제어반을 적용한 육상 해상 풍력타워 승강기 개발)

  • Lee, Sang-Hun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.22 no.6
    • /
    • pp.711-719
    • /
    • 2019
  • At present, wind power is the fastest growing technology in the world. The domestic market depends heavily on imports for wind tower lift. so it manage through the overseas maker. The lift manufacture, establishment and maintenance utility is increasing, localization development of one wind tower lift is necessary with domestic fundamental base technique. In this paper, we will study the components necessary for the development of onshore offshore wind tower elevators, which are currently dependent on total imports, in line with the high growth of the wind market and the enlargement of the wind power generators. First of all, endless winders and cabins, which are the core components of the offshore wind tower lift, were examined for the components that affect the structural safety. Structural analysis was performed on Sheave, which is responsible for most of the lift lifting loads, and Block Stop, a safety device that prevents the cabin from falling in an emergency. The structural suitability was evaluated by comparing with the safety factor. In addition, the on-board control panel combines the control panel of the elevator and the drive motor driving the endless winder for efficient control of the offshore wind tower lift. The addition of features improves ride comfort at departure.

A Study on the Repair Time of the Construction Type in the Apartment Housings (공동주택 공종별 수선시기 설정 연구)

  • Lee, Kang-Hee;Park, Geun-Soo;Chae, Chang-U
    • Journal of the Korean housing association
    • /
    • v.22 no.4
    • /
    • pp.83-92
    • /
    • 2011
  • Apartment is settled down as a main housing type and massive supply has been conducted since 1990's. The government has focused on the housing supply to improve the housing number and cut its price. On the contrary, the management of the housing has been neglected to get an early deterioration. Since 1995's, various ways have been made to improve and maintain the building function and performance. Among these, the long-term repair plan has played a main role to manage the housing condition and plan the repair schedule for preparing the massive cost of repair such as a roof proof, elevator change. The long-tern repair plan provides the repair time and repair rate according to various construction types. Most of the management agent apply the repair standard into the field area. But the repair time could not reflect the present condition and bring into the wrong maintenance. Therefore, the repair time for the long-term maintenance plan would be revised and reflected from the material and technology development. |n this study, it aimed at improvement for the repair time in various construction types which are provided in the long-term repair plan. For this, the 22 management agents are surveyed directly. This study shows that the repair time of the painting are correspondent to the repair time of the long-term plan irregardless of the painting materials. Most of other areas would correspondently similar to the long-term plan. This study could not include the building location, material and other haracteristics. Therefore, the further study would be needed to reflect the building and materials attributes to get the detailed repair time.

Establishment of the Optimal Repair Cycle of the Components of the Rental Housing (공공임대주택 구성재의 적정 수선주기 산정 연구)

  • Lee, Tae-Kyoung;Chae, Chang-U;Lee, Kang-Hee
    • KIEAE Journal
    • /
    • v.12 no.5
    • /
    • pp.29-34
    • /
    • 2012
  • A rental housing has a key role to supply the living space to non-ownership. A public rental housing is particularly aimed at providing the living space for the low-income households with a low rent fee. Therefore, the local government would try to maintain the facilities of the rental housing and to get the decent living condition. For getting the required living condition, it should make a maintenance plan, which contains the repair time, repair scope and targeted component and finishings. This study is aimed at providing the optimal repair time in 12 components and components of the rental housing which is controlled by the local government. The optimal repair time has two steps to get the final result. First, it would draw the 1'st repair time with the probabilistic and empirical approach. Second, comparing the drawn data and the service life, the optima repair time would be provided with considering the components' attributes. Result are as follows : First, the optimal repair time would be considered with the component attributes. There are user's convenience, its safety and physical aspect. Second, the kitchen utensils, elevator and water tap has a optimal time of 16, 19, 17 years respectively which is considered with physical aspect. In addition, the optima repair time of the wiring appliance and lighting equipment are 12 years and 10 years respectively.

A Study on The Integrated Simulation of The Intelligent Building Control Systems and Network (인텔리전트 빌딩의 제어 시스템 및 네트워크의 통합 시뮬레이션에 관한 연구)

  • Shin, Jin-Sok;Lim, Dong-Jin
    • Proceedings of the KIEE Conference
    • /
    • 1997.11a
    • /
    • pp.106-108
    • /
    • 1997
  • Many new office buildings are being built as intelligent buildings equipped with building automation(HA) systems, office automation(OA) systems, and telecommunication(TC) systems in order to provide pleasant building environment and the ease of maintenance and facility management. Building control systems which are employed in intelligent buildings require varieties of advanced control systems and network systems for efficient integrated management. Design and installation of these types of advanced building control systems take a lot of efforts and also they are costly. In order to design these systems, it is necessary for the designers to have the integrated simulator including proper network system simulation. In this paper, the integrated simulator that consist of HVAC system, lighting system, elevator system, parking system based on the network system is presented. For the development of integrated simulator, AHENA which is the general-purpose software tool for a simulation with reinforced GUI is used.

  • PDF

Development of Integrated Simulator for Intelligent Building Control Systems (인텔리젼트 빌딩 제어 시스템의 통합 시뮬레이터 개발)

  • Bae, Joong-Won;Lim, Dong-Jin;Hong, Seung-Ho;Song, Kyoo-Dong
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.1199-1201
    • /
    • 1996
  • To Provide pleasant building environment and the ease of maintenance and facility management, many new office buildings are being built as intelligent buildings. Building control systems which are employed in intelligent buildings require advanced types of controllers and varieties of control schemes. Designing and installation of these types of advanced building control systems take a lot of effort and also they are costly. In order to design these systems, it is necessary for the designers to have means to analyze and estimate the performance of control systems. In this paper, the results of the simulator for HVAC and elevator system are presented as the first stage of the development of the integrated simulator. For the development of simulator, ARENA which is the general-purpose software tool for the simulation with reinforced GUI is used.

  • PDF

The Characteristics of the Repair Cost Distribution in Apartment Housing

  • Lee, KangHee;Chae, ChangU
    • KIEAE Journal
    • /
    • v.15 no.6
    • /
    • pp.19-26
    • /
    • 2015
  • Purpose: The repair would require to conserve and improve the building function and performance since built. Each household is responsible for maintaining the public facilities and paying the required cost. Therefore, it needs to get the tool or method to forecast the required cost in the future. Before the repair cost is provided, it needs to catch the repair cost distribution and provide the unit cost for the repair cycle. In this study, it aimed at providing the repair cost unit and analyzing the repair cost distribution in a roof proofing work, elevator work and building painting, which are divided into a fully work and partly change. Results of this study are shown that first, the average repair cost for roof proofing work is provided with $166.59{\times}10^3won/household$ and $1.59{\times}10^3won/m^2$ of a full change, $33.22{\times}10^3won/household$ and $0.33{\times}10^3won/m^2$ for a partly work. In addition, elevator work is $557.45{\times}10^3won/household$ and $5.38{\times}10^3won/m^2$ for a full change, $32.92{\times}10^3won/household$ and $0.56{\times}10^3won/m^2$ for a partly repair. Painting has a $304.48{\times}10^3won/household$ and $2.94{\times}10^3won/m^2$. Second, the distribution pattern of repair unit cost has a weibull-typed distribution which has a long tail to the right.

A Variational Inequality-based Walkability Assessment Model for Measuring Improvement Effect of Transit Oriented Development (TOD) (대중교통중심개발(TOD) 개선효과 진단을 위한 변동부등식기반 보행네트워크 평가모형)

  • Sohn, Jhieon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.259-268
    • /
    • 2016
  • The core strategy of transit oriented development (TOD) is to promote high density mixed land use around railway stations. Case studies in advanced countries show that provision of policies for comprehensive maintenance of pedestrian facilities around railway station spheres is being pursued with efficacy. In spite of the importance placed on integrated pedestrian maintenance, domestic construction of integrated pedestrian infrastructure around railway station spheres lacks direction. Thus, there is a clear need for an evaluation standard that can provide the foundation for judgments on TOD improvement. This research proposes a network model that consolidates the interior of the station as well as its surrounding areas to determine the ease of pedestrian flow for effective TOD evaluation. The model considers the railway station and surrounding areas as an assembled network of pedestrian flow. The path chosen by the pedestrian is defined as the optimal degree of inconvenience, and expands on Wardrop's User Equilibrium (1952). To assess the various circumstances that arise on pedestrian facilities including congestion of the pedestrian pathway, constrained elevator capacity, and wait at the crosswalk, a variational inequality based pedestrian equilibrium distribution model is introduced.

Structural Performance of Hybrid Coupled Shear Wall System Considering Connection Details (접합부 상세에 따른 복합 병렬 전단벽 시스템의 구조 성능)

  • Park, Wan Shin;Yun, Hyun Do;Kim, Sun Woong;Jang, Young Il
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.3
    • /
    • pp.128-137
    • /
    • 2012
  • In high multistory buildings, hybrid coupled shear walls can provide an efficient structural system to resist horizontal force due to wind and seismic loads. Hybrid coupled shear walls are usually built over the whole height of the building and are laid out either as a series of walls coupled by steel beams with openings to accommodate doors, elevator walls, windows and corridors. In this paper, the behavior characteristics of hybrid coupled shear wall system considering connection details is examined through results of an experimental research program where 5 two-thirds scale specimens were tested under cyclic loading. Such connections details are typically employed in hybrid coupling wall system consisting of steel coupling beams and reinforced concrete shear wall. The test variables of this study are embedment length of steel coupling beam and wall thickness of concrete shear wall. The results and discussion presented in this paper provide fundamental data for seismic behavior of hybrid coupled shear wall systems.

Risk Assessment of Mechanical Parking Facility during Construction based on AHP Analysis (AHP 분석을 이용한 기계식 주차설비 건설 중 위험성 평가방안 연구)

  • Lee, Jeong Han;Kim, Yong Gon;Lee, Jae Won;Kim, Jong Hoon
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.5
    • /
    • pp.33-41
    • /
    • 2022
  • As the number of automobile registrations increases yearly, parking spaces that are located in downtown areas are increasing, and mechanical parking facilities are also increasing. Therefore, there is a high risk of accidents when installing and repairing a mechanical parking facility. In the preceding six years (from 2012 to 2018), the statistics that pertain to accidental disasters indicated that a total of 137 disaster victims were generated by the construction sector, 33 accidents occurred, and 10 people died. However, only the safety management items pertaining to accidents that occur during maintenance work and the use of the installed mechanical parking facilities are being studied; furthermore, there is no ongoing research with respect to the risk management that is conducted at the construction site. In 2017, the Korea Occupational Safety and Health Agency (KOSHA) announced the "Guidelines for Safe Installation and Maintenance of Mechanical Parking Equipment"; however, it is a safety guideline that is limited to the installation of basic protective equipment and to facility installation. There is no model for mechanical parking facilities that is indicated in the "Risk Assessment Model by Construction Industry Type", which is issued by the Safety and Health Corporation and is widely utilized for risk assessment in the construction industry; moreover, elevator installation work CODE N0: 22 is the only major example of a disaster. In this study, "risk assessment through a focus group interview" was performed, and data was derived from the "risk assessment of Article 41 (2) of the Industrial Safety and Health Act", which reflects the characteristics of the construction industry based on AHP analysis. The results of this study can be utilized for the risk assessment that is conducted during the construction stage of mechanical parking facilities.