• Title/Summary/Keyword: Electrical Substation System

Search Result 504, Processing Time 0.027 seconds

Basic Design for the 500kV Transmission System In Myanmar (미얀마 500kV 송전망 기본설계)

  • Baek, S.D.;Kim, J.H.;Choi, Y.S.;Han, S.M.
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.40-41
    • /
    • 2006
  • KEPCO conducted the project called the "Feasibility Study & Basic Designs for the 500kV Transmission System in Myanmar" as its second overseas project following the "Development Study on the Power System Network Analysis in Myanmar" as it first project. This paper deals with the design processes and results of 423 kilometers of the 500kV single circuit transmission lines and three substations. The main contents of the basic design include insulation design, transmission line design and substation design.

  • PDF

Estimation of the proper capacity of Dispersed Storage and Generation system for uninterruptable service in one bank outage case in 154/22.9KV S/S (154/22.9 KV S/S의 1 BANK 사고시 무정전 전력공급을 위한 분산형 전원의 적정용량 산정 검토)

  • Kim, Jae-Eon;Rho, Dae-Suk;Kim, Ho-Yong
    • Proceedings of the KIEE Conference
    • /
    • 1989.11a
    • /
    • pp.216-219
    • /
    • 1989
  • Over the last decade or so, there has been an increase in activity devoted to the development of renewable resources for generating electric energy. Many of these generators are small and can only be economically connected to the distribution system or to ths subtransmission system. Those which involve storage, a secondary source of energy, can provide a means to achieve more efficient use of existing generating plant. Such systems are known collectively as Dispersed Storage and Generation devices, or DSGs. So, in this paper, for uninterruptable service in one bank outage in 154/22.9KV substation, the proper capacity of DSGs is examined through the configuration and the reliability.

  • PDF

The Study on the Voltage Improvement in Distribution Line(I) (배전선로(配電線路)의 전압개선(電壓改善) 대책(對策)에 관한 연구(硏究)(I))

  • Kim, Ho-Yong;Rho, Dae-Sook;Son, Soo-Kook;Kim, Sang-Jun;Son, Il-Keun
    • Proceedings of the KIEE Conference
    • /
    • 1988.07a
    • /
    • pp.888-891
    • /
    • 1988
  • Recently, with the expansion of electronic equipment and computer facilities, good quality of services is required. This paper describes how to improve distribution system voltage by the Tap position seletion of P. Tr, by the decision of the optimal sending voltage in substation and we also developed three phase load flow program in distribution system. Besides we have developed the digital recording voltmeter that will be utilized with personal computer system. This meter will be useful, economical and powerful.

  • PDF

An Expert System Using Current Waveform for Dignosis of Fault Location on Electric Power Distribution System (전류 파형을 이용한 배전계통에서의 고장점 진단 전문가 시스템)

  • Jin, B.G.;Lee, D.S.;Lee, S.J.;Choi, M.S.;Kang, S.H.;Ahn, B.S.;Yoon, N.S.
    • Proceedings of the KIEE Conference
    • /
    • 2001.11b
    • /
    • pp.278-281
    • /
    • 2001
  • Identifying the fault location has to deal with multiple possible candidates. It presents a new technique to diagnosis a fault region. The proposed diagnosis scheme identifies accurately the location based on the protective device operations and load current change at the substation. An Expert system is presented using these facts.

  • PDF

Devided operation by each Tank of 765kV Transformer (765kV 변압기 탱크 분리운전)

  • Kim, Moon-Duk;Jung, Si-Hwan;Park, Jong-Myung
    • Proceedings of the KIEE Conference
    • /
    • 1999.07e
    • /
    • pp.2317-2319
    • /
    • 1999
  • 765kV Transformer, bank capacity is 2,000MVA, is developed of two seperated tanks per phase because transportation weight of the transformer needs to be reduced. So we will operate one tank per phase in some case, low load or black down of 1 tank, using the one phase-two tank type of 765kV transformer to cut down the cost and improve the reliability of substation.

  • PDF

Breaking test of UHV circuit breaker by ANSI/IEEE standard (ANSI/IEEE를 적용한 초고압 차단기의 차단시험)

  • Park, Seung-Jae;Rhyou, Hyeong-Kee;Kang, Young-Sik;Koh, Heui-Seog
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.467-469
    • /
    • 2003
  • IEC(International Electrotechnical Commission) 62271-100 has been adopted for the design test of circuit breaker which is used as the main protecting device of power system. But, it is also necessary to separately receive the testing certificate in accordance with ANSI/IEEE standard for getting into the american market. Up to now, several domestic companies have completed the ANSI/IEEE testing in medium circuit breaker of distribution system, but they recently started the ANSI/IEEE testing in ultra high-voltage class of transmission and substation system. This paper introduces the testing techniques and its results for the making and breaking performance of 145kV, 40kA $SF_6$ gas circuit breaker which was firstly performed in KERI(Korea Electrotechnology Institute) by the ANSI/IEEE standard.

  • PDF

Power IT System Integration Platform based on OPC (OPC 기반 전력 IT 시스템 연동 플랫폼)

  • Song, Byung-Kwen;Kim, Geon-Ung
    • Journal of IKEEE
    • /
    • v.14 no.2
    • /
    • pp.33-40
    • /
    • 2010
  • OPC is open connectivity in industrial automation and the enterprise systems that support industry. OPC XML-DA provides a platform-independent on web service-based communication. This paper propose Power IT system integration platform using OPC that is to integration between DLMS protocol used in AMI system and Distribute protocol DNP3.0 throught IEC61850 using Substation Automation Protocol.

Construction of IED Conformance Testing System (IED 적합성 인증시험 장치 구축)

  • Lee, N.H.;Kim, J.H.;Jang, B.T.;An, Y.H.;Hwang, K.C.
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.489-490
    • /
    • 2007
  • In order to construct a digital substation based on IEC61850, All of the utility company should used IEDs to be verified and also vendors should get a certification from the international conformance testing organizationsuch as KEMA. So KEPRI in charge of POWER IT project related to SAS was required to IED conformance testing system, which can perform the test previously. The system, KEPCO developed, consists of HMI, IED (Intelligent Electronic Device), network equipment, V/I generator etc

  • PDF

A Study on Diagnosis of The Energized Status of 22.9kV Multigrounded Underground Power Cable (22.9kV 다중 접지 지중 전력 케이블의 가압 상태 진단에 관한 기초 연구)

  • Kim, Chang-Gyo;Hong, Jin-Su;Jeong, Yeong-Ho
    • The Transactions of the Korean Institute of Electrical Engineers C
    • /
    • v.48 no.10
    • /
    • pp.699-703
    • /
    • 1999
  • An experimental study to identify the energized status of the 22.9kV underground power cable by the detection of vibration has been performed. We have derived that there exists vibration at double the line frequency in live cables by electromagnetic force. The relative amplitudes of the cable vibration according to the energized status of the cable were calculated by computer simulation. The cable vibration can also be picked up by accelerometer. A prototype was tested on the underground distribution system in Chonan substation, KEPCO. Comparison between simulation results and field test results was performed. The results showed that the energized status of the calble can be identified by measuring the vibration of the cable using accelerometer.

  • PDF

The Basic Study on 800kV GIS Development (800kV GIS 개발을 위한 기본연구)

  • Kim, J.B.;Yang, D.I.;Song, W.P.;Lee, C.H.;Noh, C.W.
    • Proceedings of the KIEE Conference
    • /
    • 1995.07c
    • /
    • pp.1341-1343
    • /
    • 1995
  • The maximum transmission voltage in our country is going to change 345kV into 765kV owing to the increase of Electrical Power Demand and power System Stability. Our company is developing 800kV GIS and 765kV Transformer which are main equipments in 765kV substation. This paper describs the specification on 800kV GIS which we prepared for 800kV 8,000A 50kA GIS development. This specification is supported by Public Standards and Data. And, we are designing the 800kV GIS on this specification and drawing up the 800kV GIS layout for type test.

  • PDF