Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2005.05a
/
pp.270-274
/
2005
The human beings have increased concern about Energy saving and alternative energy. The power demand has increased the growth of industry and the improvement of life. We have to explore alternate energy sources and utilize effectively domestic resources. The lighting equipments developed Energy saving by using an electric ballast. The load installation should be promoted to rational power management, according to the network, inteligent, and high-function. Therefore, this paper has studied the method of energy saving and consulting.
Park, Chang-Hyun;Lee, Yil-Hwa;Jang, Gil-Soo;Kim, C.H.;Kim, J.C.
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2005.05a
/
pp.398-401
/
2005
This paper presents a user-friendly application for voltage sag analysis and effective visualization for analysis date. This developed tool provides basic functions for voltage sag analysis such as load flow analysis, short circuit analysis and determination of vulnerability of sensitive equipments. Particularly it has the ability to visualize analysis results effectively using computer graphic and animation. In order to give the real sense, analysis results are displayed with geographical information in an intuitive and rapid manner. The developed voltage sag simulator is applied to the Jeju-Island power system in order to show its capabilities.
The Transactions of The Korean Institute of Electrical Engineers
/
v.59
no.6
/
pp.1011-1016
/
2010
It is an important issue to electric power system operations that it can reliably supply large-capacity power to consumption area as due to increasing power demand growth. For this purpose, The FACTS equipment based on Power IT technology with the existing mechanical compensators has been applied to power system. Therefore we suggest on this paper that a plan for coordination control of multiple power compensation equipment in order to increase the utilization of each facility and secure operation margin capacity. As the result of simulation, it is possible to cope actively with a suddenly changed power system. This helps greatly for the voltage stability and supply reliability in a suddenly changed power system.
The Transactions of The Korean Institute of Electrical Engineers
/
v.56
no.5
/
pp.958-965
/
2007
The spreaders on container cranes are usually controlled to stop at the same time as their trolleys are stopped. Despite the use of adequate control systems, however, the spreaders usually have comparatively large sway movements, due to their suspension from the trolleys through cables. It is, therefore, important to accurately measure the attitudes of the spreaders, in order to suppress such sways by means of secondary control. Until now, most of conventional anti sway control systems focus on the direct control of the movements of trolleys. which seems not suitable to speed up the entire process - loading and unloading of containers. In this paper, we suggest a new anti sway control system: By using extra equipments - two propellers to suppress the sway and a PSD camera to measure the spreader's attitude - installed on the spreader and the trolley. the sway of the suspended load j, considerably suppressed. The effectiveness of the proposed scheme is verified by the computer simulation and experiment with the miniature of the container crane system.
The Transactions of the Korean Institute of Electrical Engineers B
/
v.54
no.6
/
pp.294-302
/
2005
PV system's islanding occurs when the uitilty grid is removed but local sources continue to operate and provide power to local loads. Islanding is one of the serious problems in an electric power system connected with dispersed power sources. Also, this can present safety hazards and the possibility of damage to other electric equipments. If the real and reactive power of RLC load and PV system are closely matched, islanding detection by passive methods becomes difficult. This paper shows the simulation and comparision for the previous active methods and novel islanding detection method using frequency drift is proposed for grid-connected PV system.
This study is analyzed for electrical fire danger by electric equipments through surveys of stable owners and the field investigation at 64 stable. Also, an experiment is performed to analyze the thermal characteristics of 4 types electric wiring according to the number of operating halogen warm lamp group and automatic waterer group in Beon-young stable in the Cheongwon location. The survey is done to investigate the occurrence of electrical fire, electric equipment, causes and dangerous equipment. As a result, halogen warm lamp group and automatic waterer group are found to have dangerous loads. In the field investigation, the mode of load capacity of the halogen warm lamp group and automatic waterer group was investigated. The mode of load capacity of halogen warm lamp group (over 3 years) is found 17A and that of the auto waterer group (10 years) is 16A. In this experiment, the halogen warm lamp group aged at least 3 years showed $109^{\circ}C$ while that aged less than 1 year appeared $83^{\circ}C$, showing the max gap of $26^{\circ}C$. The automatic waterer group aged 10 years showed $90^{\circ}C$ while that aged less than 1 year appeared $68^{\circ}C$, showing the max gap of $22^{\circ}C$. These findings indicate that the mode of load capacity needs to be considered in selecting and installing wiring for the electric equipment construction of halogen warm lamp group and automatic waterer group in stable.
The Transactions of the Korean Institute of Power Electronics
/
v.4
no.4
/
pp.384-394
/
1999
This paper deals with a fixed frequency full-bridge inverter type DC-DC high-power converter with high frequency high voltage(HFHV) transformer-coupled stage, which operates under quasi-resonant ZVS transition priciple in spite of a wide PWM-based voltage regulation processing and largely-changed load conditions. This multi-resonant(MR) converter topology is composed of a series capacitor-connected parallel resonant tank which makes the most of parasitic circuit reactive components of HFHV transformer and two additional quasi-resonant pole circuits incorporated into the bridge legs. The soft-switching operation and practical efficacy of this new converter circuit using the latest IGBTs are actually ascertained through 50kV trially-produced converter system operating using 20kHz/30kHz high voltage(HV) transformers which is applied for driving the diagnostic HV X-ray tube load in medical equipments. It is proved from a practical point of view that the switching losses of IGBTs and their electrical dynamic stresses relating to EMI noise can be considerably reduced under a high frequency(HF) switching-based phase-shift PWM control process for a load setting requirements.
The Transactions of The Korean Institute of Electrical Engineers
/
v.59
no.1
/
pp.1-8
/
2010
The ultrafashionable machinery that require high quality electricity power has been daily come into being. Because domestic power system has been larger and more complicated in accordance with raising power demand by power market requirement. Because of these power market situations, The FACTS (Flexible AC Transmission System) which is power transmission system for the next generation to meet flexible supply the power and reliability has been applied. If they, compensators and FACTS, are used inter-efficiently in range that does not affect the stability and a badly influence the security, they might be increase in the voltage stability of system, supply reliability and also achieve the voltage control in a suddenly changed power system. Therefore we describe and suggest on this treatise that a plan for coordination control between UPFC, Shunt elements (Sh. Capacitors & Sh. Reactors) among compensators and also describe the method to keep or control the voltage of power system in allowable ranges. The method follows that, we used characteristics of each equipment, UPFC would be also settled to keep the identified voltage range in change of load bus, Shunt elements also would be settled to supply the reactive power shortage in out of operating range of UPFC to cope actively with change of the power system. As the result of simulation, it is possible to keep the load bus voltage in limited range in spite of broad load range condition. This helps greatly for the improvements of supply reliability and voltage stability.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.19
no.2
/
pp.114-123
/
2005
A nonlinear speed control of a PMSM using a sequential parameter auto-tuning algorithm for servo equipments is presented. The nonlinear control scheme gives an undesirable output performance under the mismatch of the system parameters and load conditions. Recently, to improve the performance, an adaptive linearization scheme, a sliding mode control and an observer-based technique have been reported. Although a good performance can be obtained, the performance is not satisfactory any more under specific conditions such as a large inertia variation, a fast speed transient or an increased sampling time. The simultaneous estimation of principal parameters giving a direct influence on speed dynamics is generally not simple. To overcome this problem, a a sequential parameter auto-tuning algorithm at start-up is proposed, where dominant parameters are estimated in a prescribed regular sequence based on the method that one parameter is estimated during each interval. The proposed scheme is implemented on a PMSM using DSP TMS320C31 and the effectiveness is verified through simulations and experiments.
This paper proposes a novel active frequency drift (AFD) method for the islanding prevention of grid-connected photovoltaic inverter. To detect the islanding phenomenon of grid-connected photovoltaic (PV) inverters concerning about the safety hazards and the damage to other electric equipments, many kinds of anti-islanding methods have been presented. Among them, AFD method using chopping fraction enables the islanding detection to drift up (or down) the frequency of the voltage during the islanding situation. In this paper, injecting the periodic zero current into the basic AFD method is proposed. This proposed method shows the analytical design value of cf to meet the test procedure of IEEE Std. 1547 with various load conditions. Detection of islanding is verified using simulation tool PSIM.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.