• Title/Summary/Keyword: Electrical IT Equipment

Search Result 1,192, Processing Time 0.026 seconds

A Study of the Characteristics of a Partial Discharge of SF6 Following a Fault

  • Yoon, Dea-Hee;Song, Hyun-Jig;Lee, Kwang-Sik
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.21 no.9
    • /
    • pp.18-24
    • /
    • 2007
  • When faults occur in the power equipment that is used a great deal in industrial sites, it may lead to fatal accidents that cause losses both economically and in manpower. In this paper, the effect of particle impact on the partial discharge of $SF_6$ gas was measured by simulating a partial discharge following the type of fault found in the GIS using $SF_6$ insulating gas as the insulating material. A spectrum analysis was performed on the radiate electromagnetic waves emitted upon partial discharge by using the UHF insulation diagnosis method. This subject of this study is insulation diagnosis by the measurement of radiate electromagnetic waves when particles exist in the GIS and power equipment insulated with $SF_6$ gas.

Efficient Multi-site Testing Using ATE Channel Sharing

  • Eom, Kyoung-Woon;Han, Dong-Kwan;Lee, Yong;Kim, Hak-Song;Kang, Sungho
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • v.13 no.3
    • /
    • pp.259-262
    • /
    • 2013
  • Multi-site testing is considered as a solution to reduce test costs. This paper presents a new channel sharing architecture that enables I/O pins to share automatic test equipment (ATE) channels using simple circuitry such as tri-state buffers, AND gates, and multiple-input signature registers (MISR). The main advantage of the proposed architecture is that it is implemented on probe cards and does not require any additional circuitry on a target device under test (DUT). In addition, the proposed architecture can perform DC parametric testing of the DUT such as leakage testing, even if the different DUTs share the same ATE channels. The simulation results show that the proposed architecture is very efficient and is applicable to both wafer testing and package testing.

Calculation of the Harmonic Emission Limit for low-Voltage Electrical Equipment (국내 저압 전기기기의 고조파 유출 제한값 산정)

  • Kang, Moon-Ho;Song, Yang-Hoi;Lee, Heung-Ho
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.10
    • /
    • pp.56-61
    • /
    • 2008
  • Because the harmonic disturbance characteristic which makes voltage drop and the deterioration of instantaneous power quality in electrical power system overheats the NGR and the customer capacitor and malfunctions the OCGR and AMR, it is necessary for electric power company to take active measures to reduce this disturbance. International Electrotechnical Commission(IEC) 61000-3-2 specifies limits for harmonic current emissions generated by low voltage(LV) electrical equipment whose input current $\leq$ 16(A) per phase. Analysis shows that limits for Class A equipment in IEC are calculated using the reference impedance of LV system and maximum permissible voltage and limits for other Classes are also calculated based on limits for Class A. Therefore we have calculated four(4) internal limits for LV electrical equipment using the korea reference impedance and maximum permissible voltage in this paper.

Investigation on Oil-paper Degradation Subjected to Partial Discharge Using Chaos Theory

  • Gao, Jun;Wang, Youyuan;Liao, Ruijin;Wang, Ke;Yuan, Lei;Zhang, Yiyi
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.5
    • /
    • pp.1686-1693
    • /
    • 2014
  • In this paper, oil-paper samples composed of transformer windings were used to investigate the insulation degradation process subjected to partial discharge (PD), with artificial defects inside to simulate the PD induced insulation degradation. To determine appropriate test voltages, the breakdown time obtained through a group of accelerated electrical degradation tests under high voltages was firstly fitted by two-parameter Weibull model to acquire the average breakdown time, which was then applied to establish the inverse power law life model to choose advisable test voltages. During the electrical degradation process, PD signals were synchronously detected by an ultra-high frequency (UHF) sensor from inception to breakdown. For PD analysis, the whole degradation process was divided into ten stages, and chaos theory was introduced to analyze the variation of three chaotic parameters with the development of electrical degradation, namely the largest Lyapunov exponent, correlation dimension and Komogorov entropy of PD amplitude time series. It is shown that deterministic chaos of PD is confirmed during the oil-paper degradation process, and the obtained results provide a new effective tool for the diagnosis of degradation of oil-paper insulation subjected to PD.

Securing Operation Margin Capacity as Coordination Control among the Power Compensation Equipments (전력보상설비의 상호 협조제어에 따른 운영여유용량의 확보)

  • Lee, Sang-Deok;Baek, Young-Sik
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.6
    • /
    • pp.1011-1016
    • /
    • 2010
  • It is an important issue to electric power system operations that it can reliably supply large-capacity power to consumption area as due to increasing power demand growth. For this purpose, The FACTS equipment based on Power IT technology with the existing mechanical compensators has been applied to power system. Therefore we suggest on this paper that a plan for coordination control of multiple power compensation equipment in order to increase the utilization of each facility and secure operation margin capacity. As the result of simulation, it is possible to cope actively with a suddenly changed power system. This helps greatly for the voltage stability and supply reliability in a suddenly changed power system.

Application of SA-SVM Incremental Algorithm in GIS PD Pattern Recognition

  • Tang, Ju;Zhuo, Ran;Wang, DiBo;Wu, JianRong;Zhang, XiaoXing
    • Journal of Electrical Engineering and Technology
    • /
    • v.11 no.1
    • /
    • pp.192-199
    • /
    • 2016
  • With changes in insulated defects, the environment, and so on, new partial discharge (PD) data are highly different from the original samples. It leads to a decrease in on-line recognition rate. The UHF signal and pulse current signal of four kinds of typical artificial defect models in gas insulated switchgear (GIS) are obtained simultaneously by experiment. The relationship map of ultra-high frequency (UHF) cumulative energy and its corresponding apparent discharge of four kinds of typical artificial defect models are plotted. UHF cumulative energy and its corresponding apparent discharge are used as inputs. The support vector machine (SVM) incremental method is constructed. Examples show that the PD SVM incremental method based on simulated annealing (SA) effectively speeds up the data update rate and improves the adaptability of the classifier compared with the original method, in that the total sample is constituted by the old and new data. The PD SVM incremental method is a better pattern recognition technology for PD on-line monitoring.

Aging Diagnosis of Underground Distribution Power Cables by Isothermal Relaxation Current Measurement Equipment (완화전류 측정에 의한 지중배전케이블의 열화진단)

  • Kim, Ju-Yong;Song, Il-Keun;Kim, Dong-Myung;Yun, Tae-Sang;Jeong, Sang-Bong
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2004.05a
    • /
    • pp.502-505
    • /
    • 2004
  • The purpose of this experiment is to modify diagnosis criterion of isothermal relaxation current(IRC) measurement equipment which is using for distribution cable diagnosis. We're using this system for several years in the field instead of DC leakage current measurement and lots of cables were replaced. But we have to investigate on the reliability of this equipment for our cables because we didn't carried out condition assessment of extracted cables after field diagnosis by this equipment. It is important thing for cable maintenance. If the replacement criterion is improper we can not prevent failures or will waste budget on account of replacement of the sound cables. In this papar we selected field installed cables and injected silicone fluid to the cables for insulation rehabilitation. In order to prove reliability of the diagnosis equipment we compared diagnosis results and AC breakdown strength according to operating time after silicone treatment. This is the results of the field test for 1 year.

  • PDF

Development and Simulation Verification of Operation System for Mobile ESS Test Equipment (ESS 이동형 시험장비용 운영시스템의 개발과 모의검증)

  • Shin, Je-Seok;Han, Hyun-Gyu;Kim, Jin-Tae;Lee, Seung-Min;Park, Chan-Wook;Lim, Geon-Pyo
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.67 no.3
    • /
    • pp.168-174
    • /
    • 2018
  • The performance test for 376MW ESS for frequency regulation currently operating in 13 substations is conducted based on the test procedure in the first and second steps. In the first step, components of ESS is moved to the certification authority where the test equipment is located in order to be proceeded with the test. In the second step, the performance test is conducted manually for the ESS equipments installed on site using the movable measurement equipment, and thus it can only be performed on some limited test items and requires a lot of time and manpower. Therefore, mobile test equipment for ESS(MOTES) is being developed that can perform automatically more test items for ESS in the field using the MOTES, and reduce manpower and time. To do this, an algorithm and a prototype of the operating system(MOS) are also being developed that can control MOTES automatically. In this paper, a development of the MOS prototype is introduced and then a simulation is performed to verify the prototype and its algorithm before the field demonstration.

A Study on the Reduction Methods of Sheath Circulating Current using the Reduction Equipment in Underground Transmission Systems (지중송전계통에서 저감장치를 이용한 시스 순환전류 저감방안에 관한 연구)

  • Gang, Ji-Won;Yang, Hae-Won
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.51 no.9
    • /
    • pp.474-481
    • /
    • 2002
  • Sheath circulating current is increased in the change of sheath mutual impedance which is caused by unbalanced cable system, and different section length between joint boxes. If excessive current flows in sheath, sheath loss which is reduced the transmission capacity is produced. Recently, excessive sheath circulating current was partially measured in underground cable systems of KEPCO. Accordingly, actual schemes to reduce excessive sheath circulating current are urgently required for installed cable system as well as newly-installing cable systems. This paper describes the relation analysis of sheath circulating current and burying types. And also, various schemes to reduce excessive circulating current using EMTP/ATPDraw and applicable schemes are proposed through a detailed analysis regarding cable systems by considering various electrical and environmental factors. It is evaluated that the proposed reduction schemes can be effectively applied to reduce the excessive sheath circulating current with the minimized electrical problems. And reduction effect is Proved with sheath circulating current reduction equipment.

Implementation of Exposure Stage Integrated Control System for FPD (FPD용 노광 스테이지의 통합 제어시스템 구현)

  • Kim, Jong-Won;Seo, Jae-Yong;Cho, Hyun-Chan;Cho, Tai-Hoon;Kang, Heung-Seok
    • Journal of the Semiconductor & Display Technology
    • /
    • v.5 no.4 s.17
    • /
    • pp.11-15
    • /
    • 2006
  • Expose equipment system that is used for manufacturing process of Flat Panel Display, is most important equipment in whole process. Expose equipment that is for making pattern of mask on substrate, consists of optical part, stage part and transport part. The stage is an important part that aligns mask and substrate for delivering pattern of mask to substrate exactly. In this paper, control system of expose stage that is able to use mask and substrate of diverse size, with PC controller using GUI interface instead of PLC control system. The existing PLC control system does not have the suitable structure for using mask of diverse size. GUI interface integration control system is based on PC. So it has the advantage of convenient use and active operation. We embodied PLC control system in integration control system based on PC, and verified utility possibility through the standard test course.

  • PDF