• Title/Summary/Keyword: Electrical Construction Industry

Search Result 120, Processing Time 0.028 seconds

Application of BLE-based Beacon in Modular Construction Process (BLE 기술 기반 비콘을 활용한 모듈러 건축 현장 프로세스 제안)

  • Kim, Changjae;Kang, Namwoo;Kwon, Woobin;Kim, Harim;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.36-37
    • /
    • 2021
  • OSC(Off-Site Construction) is regarded as a faster and more economical method in the construction industry, and the attention towards the OSC is growing. In the modular construction process, which is one type of OSC, accurate identification of a module is essential. Because the installation position and the MEP(Mechanical, Electrical, and Plumbing) composition are distinct between modules, a defect in the finishing or junction area is likely to happen during the construction process. This study suggested the modular construction process by applying a beacon receiver using BLE(Bluetooth Low Energy) technology on each module. Construction quality management would be improved using the location and assembly data, particularly for a different module in modular construction.

  • PDF

A Study on the Statistical Continuity of Electrical Construction Cost Index Applied Chain Method (전기공사비지수의 산정방식 변경에 따른 통계연속성 실증분석 연구)

  • Park, Houng-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.46-53
    • /
    • 2015
  • Electrical construction cost index is composed of the cost of albor and material. The producer price index is used to the cost of material. The Bank of Korea restructured the formation method and the basic period of the producer price index in 2013. Because fixed-weighted method can't faithfully reflect industrial structure changes. The weighted value and price index of fixed-weighted method is fixed on the basicp eriod. Electrical construction cost index is changed from fixed-weighted method to chain-weighted method in september 2014, because of these on the need. But the change of organization in formation method changes the weighted value. So there is the need of analysis about the statistical continuity of electrical construction cost index. This study is focused on the time series analysis between fixed-weighted and chain-weighted electrical construction cost index. We uses unit root test, cointegration test, regression analysis of long and short term equation, fitness for the estimation of static forecast as time series analysis. We verify that chain-weighted electrical construction cost index can be replaced to fixed-weighted construction cost index accounting analyses result. So users of it recognize that chain-weighted electrical construction cost index has statistical continuity.

Test Result Analysis of a 1MW HTS Motor for Industry Application

  • Baik, S.K.;Kwon, Y.K.;Kim, H.M.;Lee, E.Y.;Kim, Y.C.;Park, H.J.;Kwon, W.S.;Park, G.S.
    • Progress in Superconductivity and Cryogenics
    • /
    • v.11 no.2
    • /
    • pp.33-36
    • /
    • 2009
  • A 1 MW class HTS (High-Temperature Superconducting) synchronous motor has been developed. This motor is aimed to be utilized for industrial application such as large motors operating in large plants. The HTS field coil of the developed motor is cooled by way of neon thermo siphonmechanism and the stator (armature) coil is cooled by water through hollow copper conductor. This paper also describes evaluation of some electrical parameters from performance test results of our motor, which was conducted at steady state in generator mode and motor mode. Open and short circuit tests were conducted in generator mode while a 1.1 MW rated induction machine was rotating the HTS machine. Electrical parameters such as mutual inductance and synchronous inductance are deduced from these tests. Load test was done upto rating torque during motor mode and efficiency was measured at each load torque.

Developing Computer Integrated Construction Methodologies to Improve Quality of Asphalt Pavement (아스팔트 포장의 품질향상을 위한 정보화 시공법 개발)

  • Lee Heejune
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.208-213
    • /
    • 2001
  • The current progress in computer and electrical engineering has enabled the construction industry to implement innovative technologies in design and engineering. However, the construction segment is still largely based on experience, and this makes it difficult to meet the recent rigorous specifications, especially in the highway construction. This paper describes the current progress and the findings in the development of the computer integrated asphalt paving system, which is expected to assist the equipment operators to construct the quality pavement. The technologies to collect the required information, preferably in real-time, were reviewed comprehensively, and the selected technologies are proposed for the future development. Positional and thermal data were collected at the sample project in real-time to verify the capability of the available technologies. The collected data was analyzed using multiple regression method to confirm the significant factors for the compaction of the sample project, and to develop the empirical model, which can be adopted in the future system.

  • PDF

Construction of On-Site Calibration Facilities of 66 kV Voltage Transformer Comparator System (66kV급 전압변성기 비교측정 장치의 현장 평가설비 구축)

  • Jung, Jae-Kap;Lee, Sang-Hwa;Kwon, Sung-Won;Kim, Myung-Soo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.7
    • /
    • pp.1268-1274
    • /
    • 2007
  • A recently developed methods for the on-site calibration of the voltage transformer (VT) comparator system have been reviewed in the paper. The method utilizes the several traveling standards consisting of the VT, the non-reactive standard resistors, the wide ratio error VT, and the decade resistors. The VT is used for the absolute evaluation of a standard VT belonging to the industry. The non-reactive standard resistor and wide ratio error VT are used for the linearity check of errors in the voltage comparator of the industry. The decade resistors are used for evaluation of a VT burden of the industry.

Agent-Based Modeling for Studying the Impact of Capacity Mechanisms on Generation Expansion in Liberalized Electricity Market

  • Dahlan, N.Y.
    • Journal of Electrical Engineering and Technology
    • /
    • v.10 no.4
    • /
    • pp.1460-1470
    • /
    • 2015
  • This paper presents an approach to solve the long-term generation expansion planning problem of the restructured electricity industry using an agent-based environment. The proposed model simulates the generation investment decisions taken by a particular agent (i.e. a generating company) in a market environment taking into account its competitors’ strategic investment. The investment decision of a particular company is modeled taking into account that such company has imperfect foresight on the future system development hence electricity prices. The delay in the construction of new plants is also explicitly modeled, in order to compute accurately the yearly revenues of each agent. On top of a conventional energy market, several capacity incentive mechanisms including capacity payment and capacity market are simulated, so as to assess their impact on the investment promotion for generation expansion. Results provide insight on the investment cycles as well as dynamic system behavior of long-term generation expansion planning in a competitive electricity industry.

A Study on Competency Evaluation and Improvement Plan of Electrical Construction Management Using Importance-Performance Analysis (IPA를 활용한 전기공사 건설사업관리 역량 평가 및 개선방안 연구)

  • Kim, Seungbeum;Byun, Jeongyoon;Kim, Juhyung;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.103-112
    • /
    • 2014
  • Since recent construction projects become larger and complicated, the level of difficulty of management skill is rising, and the risk is increasing accordingly so the necessity of improving management skill of projects is increasing. In order to solve this problem, Construction Management system was preferentially introduced in construction projects but in case of domestic construction industry, separate contracts by business boundary are being made so the actual state is that the function of the Construction Management system is not properly operated over the overall projects. The partial operation of Construction Management system like this may impose many restrictions on converged and combined projects such as smart grid and intelligent buildings etc. in the future. For improvement of management skill of domestic construction projects, the competence of project management skill by work areas that can overcome heterogeneity of the current project management skill shall be secured, and any factor that impedes cooperation ability shall be found and that shall be solved. Therefore, the difference of work competency of project management system of construction and electrical construction is to be analyzed by utilizing IPA model in this study, and a plan to introduce the project management system of electrical construction for efficient operation of projects is to be looked into.

Generating a Simplistic 3D Model for Mobile Platform Applications

  • Ahmed, Naveed;Park, Jee Woong;Morris, Brendan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1093-1099
    • /
    • 2022
  • The number of buildings is increasing day by day. The next logical footstep is tackling challenges regarding scarcity of resources and sustainability, as well as shifting focus on existing building structures to renovate and retrofit. Many existing old and heritage buildings lack documentation, such as building models, despite their necessity. Technological advances allow us to use virtual reality, augmented reality, and mixed reality on mobile platforms in various aspects of the construction industry. For these purposes, having a BIM model or high detail 3D model is not always necessary, as a simpler model can serve the purpose within many mobile platforms. This paper streamlines a framework for generating a lightweight 3D model for mobile platforms. In doing so, we use an existing structure's site survey data for the foundation data, followed by mobile VR implementation. This research conducted a pilot study on an existing building. The study provides a process of swiftly generating a lightweight 3D model of a building with relative accuracy and cost savings.

  • PDF

EIS Properties of Lightweght Aggregate According to Surface Coating (표면 코팅 유무에 따른 경량골재의 EIS 특징)

  • Pyeon, Myeong-Jang;Jeong, Su-Mi;Kim, Ju-Sung;Kim, Ho-Jin;Park, Sun-Gyu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.107-108
    • /
    • 2022
  • In recent years, the construction industry has a tendency to increase of high-rise builidngs. High rise buildings can use limited space efficiently. But High rise buildings have problem that have extremely heavy weight. Various studies are being conducted to reduce the weight of buildings. Although lightweight aggregate is a meterial that can effectively reduce the weight of buildings, the strength of the aggregate itself is weak and the absorption rate is high, so the strength of the ITZ(Interfacial Transition Zone) area is weak. Therefore, it is essential to improve the interfacial area when using lightweight aggregates. In this study, an experiment was conducted to improve the adhesion between the aggregate and cement paste and to strengthen the interfacial area by coating the surface of the lighteight aggregate with Blast Furnace Slag. To confirm the improvement, compressive strength and EIS(Electrochemical Impedance Spectroscopy) measurements were perfromed. Using EIS, the change in electrical resistance of the cement hardened body was confirmed. As a result, it was confirmed that the lightweight aggregate coated on the surface showed highter compressive strength and electrical resistance than the non-coated lightweight aggregate, and that the coating material was filled in the interfacial area and inside the aggregate that helped to strengthen the compresssive strength and higher electrical resistance.

  • PDF

The Acquisition and Maintenance Strategy of Patent for Electrical Construction Industry (전기공사에 있어 특허기술의 획득 및 관리전략)

  • Choi, Nam-Ho;Han, Sang-Ok
    • Proceedings of the KIEE Conference
    • /
    • 2005.07e
    • /
    • pp.34-36
    • /
    • 2005
  • To promote the mentality on intellectual property, this paper presents the concept and importance of intellectual property, international trend on patent policy and practical acquisition and maintenance strategy of patent for the domestic middle and small business enterprise and engineers.

  • PDF