• Title/Summary/Keyword: Electrical Construction Cost Index

Search Result 6, Processing Time 0.026 seconds

A Study on the Statistical Continuity of Electrical Construction Cost Index Applied Chain Method (전기공사비지수의 산정방식 변경에 따른 통계연속성 실증분석 연구)

  • Park, Houng-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.46-53
    • /
    • 2015
  • Electrical construction cost index is composed of the cost of albor and material. The producer price index is used to the cost of material. The Bank of Korea restructured the formation method and the basic period of the producer price index in 2013. Because fixed-weighted method can't faithfully reflect industrial structure changes. The weighted value and price index of fixed-weighted method is fixed on the basicp eriod. Electrical construction cost index is changed from fixed-weighted method to chain-weighted method in september 2014, because of these on the need. But the change of organization in formation method changes the weighted value. So there is the need of analysis about the statistical continuity of electrical construction cost index. This study is focused on the time series analysis between fixed-weighted and chain-weighted electrical construction cost index. We uses unit root test, cointegration test, regression analysis of long and short term equation, fitness for the estimation of static forecast as time series analysis. We verify that chain-weighted electrical construction cost index can be replaced to fixed-weighted construction cost index accounting analyses result. So users of it recognize that chain-weighted electrical construction cost index has statistical continuity.

Development of Electrical Construction Cost Index Applied Chain-Weighted Method (연쇄방식 전기공사비지수 개발에 관한 연구)

  • Park, Houng-Hee;Choi, Seung-Dong;Hyun, So-Young;Park, Min-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.49-60
    • /
    • 2014
  • Electrical construction cost index has been applied fixed-weighted method. But fixed-weighted method can't faithfully reflect industrial structure changes. Because the weighted value and price index of fixed-weighted method is fixed on the basic period. Electrical construction cost index is composed of the cost of labor and material. So it fluctuates sharply whenever the construction association of korea announces the laborer's wage of electrical construction. And it depends on only the producer price index changes that is related to electrical construction since then. So a study is focused on developing electrical construction cost index applied chain-weighted method. Because chain-weighted method can reflect the realities of the electrical construction and alleviate the sudden changes of labor cost with link index. We verify that chain-weighted method relieves the step states of electrical construction cost index applied fixed-weighted method.

An Institute for Weight and Price index of Estimation System of Historical Cost Data in the Electrical Construction Works (실적공사비 적산제도에서 전기공사비지수의 적정 가중치 및 가격지수에 관한 연구)

  • Seo, S.S.;Jang, Y.K.;Ryu, K.H.;Kim, K.G.;Choi, S.D.;Kim, D.S.;Baek, S.H.;Won, S.H.;Sohn, H.K.;Park, I.P.
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.2092-2093
    • /
    • 2008
  • Since Jan. 2004, the Ministry of Construction and Transportation has partly introduced estimation system of historical cost data in order to reflect result cost of construction market to cost estimation for public construction. And KEPCO started estimation system of historical cost data in the electrical construction works. Electrical construction cost index a matter of great importance. This paper was conducted to examine estimation methods of the items of the price index estimation system of historical cost data and suggest reasonable applications.

  • PDF

Development of Electrical Construction Cost Index for Historical Construction Costs Estimation System (실적공사비 적산제도 활용을 위한 전기공사비지수 개발)

  • Sohn, H.K.;Lee, H.K.;Park, M.Y.;Park, I.P.;Kwon, Y.M.;Seo, S.S.;Kim, K.G.;Kim, J.H.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07e
    • /
    • pp.37-39
    • /
    • 2005
  • When we have been estimated construction costs, till now, we are used to costs accumulating method of each items based on standard labors rates. But there are some problems of its methods. Our governments are applied to a historical construction costs estimation system for building construction and civil engineering works from January 2004. The electrical construction works are forecasted that applied to historical construction cost estimation systems. This paper is showed to development of electrical construction cost index for estimation of historical costs and contract prices.

  • PDF

Presumption Method for Optimum Correction Rate of Total Construction Cost Using the Median based on Historical Data Analysis in Public Office Buildings (공공건축물 실적자료 분석에 따른 중위수를 활용한 총공사비의 적정보정율 추정방법)

  • Yim, Jin-Ho;Park, Jun-Mo;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.415-422
    • /
    • 2014
  • There is growing difference between a planned value and an actual cost for increasing as an risk of construction cost. A construction cost index is an alternative to redeem a problem, but it is still very difficult to reduce an actual differential as a price fluctuation. Furthermore an existing theory of a construction cost index is overly complex, and is unsuitable for using in working-level. This study suggests an optimum correction rate in respect of a total construction cost. It is analyzing the actual cost of 53 public buildings that the Public Procurement Service ordered. The objects are main processes that include architectural works, mechanical works, electrical works, telecommunication works, and service facilities. It is compared a total construction cost based on absolute error rate using the median from frequentist principle. For this, it is selected the suitable regression model and set a correction rate.

A study on development of measuring index about railway electrification effectiveness (철도전철화 효과 계량지표 개발에 관한 연구)

  • Kim, Jae-Hee;Park, Yong-Gul;Yang, Keun-Yul;Jung, Ho-Sung
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1575-1580
    • /
    • 2006
  • High speed and large transfer capability of railroad has been an important issue in Korean since KTX opening at 2004. Improvement projects for railway electrification are progressed in the conventional line as well as high speed line because various operation plan is performed such as interaction between high speed line and conventional line and operation of tilting train etc. Especially, railway electrification has many advantages which are cost effective and eco-friendly. But it also has some problems such as construction costs and accidents due to electrification. Therefore this paper developed measuring index of electrification railway benefit. By comparing between diesel and electrical locomotive, the operations of before and after the electrification and measurements quantitative index such as energy efficiency, enlargement of transfer capability, environmental pollution and maintenance and efficiency of operation is presented. In the future, Overall benefit and cost of railway electrification will be analyzed.

  • PDF