• 제목/요약/키워드: Electric power supply

검색결과 1,257건 처리시간 0.027초

Power Quality Optimal Control of Railway Static Power Conditioners Based on Electric Railway Power Supply Systems

  • Jiang, Youhua;Wang, Wenji;Jiang, Xiangwei;Zhao, Le;Cao, Yilong
    • Journal of Power Electronics
    • /
    • 제19권5호
    • /
    • pp.1315-1325
    • /
    • 2019
  • Aiming at the negative sequence and harmonic problems in the operation of railway static power conditioners, an optimization compensation strategy for negative sequence and harmonics is studied in this paper. First, the hybrid RPC topology and compensation principle are analyzed to obtain different compensation zone states and current capacities. Second, in order to optimize the RPC capacity configuration, the minimum RPC compensation capacity is calculated according to constraint conditions, and the optimal compensation coefficient and compensation angle are obtained. In addition, the voltage unbalance ${\varepsilon}_U$ and power factor requirements are satisfied. A PSO (Particle Swarm Optimization) algorithm is used to calculate the three indexes for minimum compensating energy. The proposed method can precisely calculate the optimal compensation capacity in real time. Finally, MATLAB simulations and an experimental platform verify the effectiveness and economics of the proposed algorithm.

Development of auxiliary power supply simulator for electric rolling stock (전기 철도차량용 보조전원장치 시뮬레이터 개발)

  • Kim Jae-Moon;Kim Duk-Heon;Kim Yeon-Chung;Lee Sang-Seok;Shin Seung-Kwon
    • Proceedings of the KSR Conference
    • /
    • 한국철도학회 2005년도 춘계학술대회 논문집
    • /
    • pp.889-894
    • /
    • 2005
  • This paper describes the development of the auxiliary power supply simulator for electric rolling stock. Auxiliary power supplies are required for operating air conditioning units, ventilation fans, lighting and battery charging. From the baseline model of the SIV(Static InVerter) for electric rolling stock, we designed the scale down model of the auxiliary power supply simulator consisting of IGBT voltage source inverter. Auxiliary power supply simulator can be used educatory purpose to teach efficiently about operating principles of SIV

A Study on Communication Controller of Electric Vehicle Supply Equipment for Information Exchange between Electric Vehicle and Power Grid (전기차와 전력계통의 정보교환을 위한 전기차 충전장치의 통신 제어기에 대한 연구)

  • Han, Ah;Shin, Minho;Kim, Intaek;Jang, Hyuk-Soo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • 제63권11호
    • /
    • pp.1564-1570
    • /
    • 2014
  • An electric vehicle (EV) not only receives electric power from the electric vehicle supply equipment (EVSE), but it also exchanges the information regarding charging process with the power gird through the EVSE. However, the EV and EVSE communicate using the ISO/IEC 15118 standard while the EVSE and power grid communicate using the IEC 61850 standard. Therefore, the EVSE should support both the ISO/IEC 15118 and IEC 61850 standards, and provide a data mapping function between the two communication protocols so that the EV and power grid, which support different protocols, can communicate with each other throughout the charging process. In this paper, we propose a mapping method of the EVSE, which converts the ISO/IEC 15118 data to IEC 61850 and vice versa, based on the XML schema of each protocol. The proposed method converts the data using the XSL (eXtensible Stylesheet Language) method, which defines the data mapping between two XML schemas. Our approach is more flexible and easier to maintain against changes in charging scenarios and the standards than other existing approaches such as one-to-one data mapping methods.

Modeling and Simulation Reactive Power Compensator using Multi-port Network Algorithm in Electrified Railway (다단자망 알고리즘을 이용한 급전시스템의 무효전력 보상 모델링 및 시뮬레이션)

  • Kim, Joorak
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • 제65권5호
    • /
    • pp.883-887
    • /
    • 2016
  • The power supply system in Korean electrified railway has adopted AT feeding. If a fault occurs in some substation for any reason, the vicinity substation must feed electric power on the outage substation through catenary. So, the feeding distance grows twice of the normal state at extended feeding condition. If substation's feeding distance is longer than normal condition, the catenary impedance and train to supply electric power from the substation. Therefore, the severe voltage drop can occur and power supply shall be not allowed. This paper presents the model of compensator against voltage drop using multi-port network algorithm. Whole traction power supply system can be analyzed with this model. Computer simulation including this model is performed based on real train schedule and increased schedule in case studies.

Analysis of electric characteristics for extension power supply between different grounding railway distribution system (접지방식이 상이한 철도배전계통의 연장급전을 위한 전기적 특성분석)

  • Jung, Ho-Sung;Han, Moon-Seob;Lee, Chang-Mu;Kwon, Sam-Young;Park, Hyeun-Jun
    • Proceedings of the KSR Conference
    • /
    • 한국철도학회 2005년도 추계학술대회 논문집
    • /
    • pp.736-741
    • /
    • 2005
  • This paper presents electric characteristics analysis and safe configuration for extension power supply between existent 6.6kV ungrounded distribution system and establishment and improvement 22.9kV direct grounding distribution system. For this, we model 6.6kV ungrounded and 22.9kV direct grounding distribution system of urban underground, ground region. and rural electrical, unelectrical region using PSCAD/EMTDC and analyze voltage drop, charging current, ground and short fault through simulation. To analyze electric characteristics of extension power supply, we simulate extension power supply of overhead line of 6.6kV ungrounded system and underground line of 22.9kV direct grounding system of rural electrical region and propose operation condition for safe extension power supply through result of analysis. Characteristics of voltage drop, charging current, ground and short fault appear almost similarly with electrical characteristic of direct power supply. However, because unbalance of phases may cause relay's malfunction of ungrounded system and ground fault current of direct grounding system may demage facilities of ungrounded system, we propose safe system configuration such as impedance grounding system of neutral point.

  • PDF

6kW V2H Power Converter Using Isolated CLLC DAB Converter

  • Ko, Hyun-Seok;Hwangbo, Chan;Park, Seong-Mi;Park, Sung-Jun
    • Journal of the Korean Society of Industry Convergence
    • /
    • 제25권4_1호
    • /
    • pp.493-504
    • /
    • 2022
  • Recently, as interest in eco-friendliness grows, the supply of hybrid electric vehicles and pure electric vehicles (EVs) for improving fuel efficiency of automobiles is rapidly expanding. The average daily energy consumption of electric vehicles is less than 20 [%] of the total ESS capacity of the vehicle, and research on additional functions using the ESS of the vehicle is urgently needed to expand the supply of electric vehicles. V2H(Vehicle to Home), like V2G(Vehicle to Grid), includes the concept of cooperating with system stabilization using ESS of electric vehicles. In addition, it includes various operations that can realize home welfare, such as uninterrupted power supply in case of power outage at home, and power supply for home DC devices. Therefore, in order to expand the supply of eco-friendly electric vehicles, it is urgently required to develop a V2H system with various functions that can realize home welfare. In this paper, we propose a V2H system with a CLLC resonant converter and a non-isolated step-up converter that can solve different impedance and resonant frequencies depending on the power transfer direction. The proposed V2H system is 6 [kVA] applicable to 150-450 [V], the voltage range that can use the ESS voltage for electric vehicles, and is designed with a capacity that can handle instantaneous electricity use at home. In addition, in order to verify the feasibility, an experiment by Psim simulation and prototype production was performed.

Estimation of Electricity Price of the Imported Power via Interstate Electric Power System in North-East Asia (동북아 전력계통 연계를 통한 융통전력 도입 시 가격상한 수준에 대한 분석)

  • Kim, Hong-Heun;Chung, Koo-Hyung;Kim, Bal-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • 제55권3호
    • /
    • pp.128-132
    • /
    • 2006
  • Interstate electric power system, as an alternative for energy cooperation under regional economic bloc, has been hotly debated before progressing the restructure in electric power industry and rapidly expanded in many regions after 1990s. Especially, since northeast asia has strong supplementation in resource, load shape, fuel mix etc., electric power system interconnection in this region may bring considerable economic benefits. Moreover, since Korean electric power system has a great difficulty in a geographical condition to interrupt electricity transaction with other countries, it has been expanded as an independent system to supply all demand domestically. As a result, Korean electric power system makes considerable payment for maintaining system security and reliability and expands costly facilities to supply a temporary summer peak demand. Under this inefficiency, if there are electricity transactions with Russia via the North Korea route then economic electric power system operation nay be achieved using seasonal and hourly differences in electricity price and/or load pattern among these countries. In this paper, we estimate price cap of transacted electricity via interstate electric power system in northeast asia. For this study, we perform quantitative economic analysis on various system interconnection scenarios.

Study of Peak Load Demand Estimation Methodology by Pearson Correlation Analysis with Macro-economic Indices and Power Generation Considering Power Supply Interruption

  • Song, Jiyoung;Lee, Jaegul;Kim, Taekyun;Yoon, Yongbeum
    • Journal of Electrical Engineering and Technology
    • /
    • 제12권4호
    • /
    • pp.1427-1434
    • /
    • 2017
  • Since the late 2000s, there has been growing preparation in South Korea for a sudden reunification of South and North Korea. Particularly in the power industry field, thorough preparations for the construction of a power infrastructure after reunification are necessary. The first step is to estimate the peak load demand. In this paper, we suggest a new peak demand estimation methodology by integrating existing correlation analysis methods between economic indicators and power generation quantities with a power supply interruption model in consideration of power consumption patterns. Through this, the potential peak demand and actual peak demand of the Nation, which experiences power supply interruption can be estimated. For case studies on North Korea after reunification, the potential peak demand in 2015 was estimated at 5,189 MW, while the actual peak demand within the same year was recorded as 2,461 MW. The estimated potential peak demand can be utilized as an important factor when planning the construction of power system facilities in preparation for reunification.

The Introduction of #2 HVDC SYSTEM (육지-제주간 2차 HVDC SYSTEM 개요)

  • Jang, Suk-Han;Yoo, Sung-Hwan;Shin, Myoung-Sik;Lee, Gyu-Yong
    • Proceedings of the KIEE Conference
    • /
    • 대한전기학회 2008년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.107-109
    • /
    • 2008
  • Cheju-Haenam HVDC transmission system start it's commercial operation since 1998. JEJU island is supplied with it's about 45% of total electric power from main land with HVDC link. In JEJU island, the demand of electric power is growing every year. With a current power supply, electric power reserve rate will be below the recommended one. For a stable power supply to JEJU island, KEPCO start a construction of #2 HVDC transmission system. This report is for introduction and understanding of #2 HVDC system which will be installed between JEJU island and main land. This report includes a specification of converter station and DC cable. KEPCO expect that this system will solve the power supply problem and maximum wind power plant capacity problem as well.

  • PDF

High Efficient Inductive Power Supply System Implemented for On Line Electric Vehicles

  • Huh, Jin;Park, Eun-Ha;Jung, Gu-Ho;Rim, Chun-Taek
    • Proceedings of the KIPE Conference
    • /
    • 전력전자학회 2009년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.105-110
    • /
    • 2009
  • The On Line Electric Vehicles(OLEV) that can pick up inductive power from underground coils on driving with high efficiency have been developed this year, and is now proposed in this paper. The IPS(Inductive Power Supply) system consists of power supply inverters, power supply rails, pick up modules, and a regulator. There are 3 generations of IPS have been developed so far, and the $4^{th}$ generation IPS is being developed. The $1^{st}$ generation has been demonstrated this Feb. 27, which is equipped with mechanically auto tracking pick-up module with 1cm air gap, and showed 80% power efficiency. The $2^{nd}$ generation IPS applied to an 120kW (average)/240kW(peak) motor powered electric bus has 17cm air gap with 72% power efficiency. For the $2^{nd}$ generation IPS, the Power supply inverter has 440V, 3phase input and 200A @ 20kHz output. The test power supply rail of 240m long is segmented by 60m each, where newly developed core structure and power cable are constructed under the road covered with asphalt of 5cm thickness. The pick-up modules which consist of core, winding wire, and rectifiers are fixed to the bottom of the bus which can carry more than 40 passengers and can pick up max. 60kW. To remove parasitic component and to transfer maximum power between them resonant circuit topology is applied to the primary and secondary sides. The EMF level is below 62.5mG at 1.75m from the center of the road to meet the regulation. Several effective ways of reducing EMF levels have been developed. In addition, effective ways to solve problems related high frequency power cables buried in ground and it's proof from soil have been studied also. This development shows that the IPS system is capable of supplying enough power to the pick-up of OLEV and can reduce battery size, weight and cost, which means the IPS with OLEV is one of the best candidate for EV.

  • PDF