• 제목/요약/키워드: Electric power supply

검색결과 1,259건 처리시간 0.026초

안정적 전력공급을 위한 154kV 변전소 배전선로간 연계운영에 관한 연구 (A Study on Loop operation of 154kV Substation Distribution line for Stable power supply)

  • 김광호;손명권;정종찬
    • 산업기술연구
    • /
    • 제29권B호
    • /
    • pp.221-228
    • /
    • 2009
  • For a stable supply of electric power, periodical inspection of the electric facilities and repair of the distribution lines are required. In case of any unexpected accidents, looped operation among distribution lines may be necessary in order to supply electricity through the sound lines, separating the faulted lines. As a result of this study, it was found that normal looped operation became impossible when phase difference of the looped distribution lines is more than 3 degrees compared with the voltage supply of the distribution lines. Therefore, for a stable supply of electric power to Chuncheon, it is judged to be desirable that looped operation of the distribution lines coming from the same substation M. Tr Bank shall be performed in principle and in case of looped operation with the substation of different system, looped operation among the lines shall be performed after voltage regulation of the substation M. Tr Bank, maintaining similar voltages and load supply volume in order to avoid phase difference through checking the operation conditions of each substation M. Tr Banks. And when looped operation among the distribution lines is scheduled, voltage regulation schedule has been established so far by calculating maximum supply volume through the transformer of the substation and the maximum load volume through the distribution lines but in the future, looped operation of the distribution lines shall be carried out by removing voltage difference with regulating tap or load of the surrounding transformers, with giving prior notice to the substation operators.

  • PDF

수력발전소 물 공급 설비에 대한 FTA 모형 (FTA Modeling of Water Supply System for Hydro-power Plant)

  • 전태보;권창섭
    • 산업기술연구
    • /
    • 제26권B호
    • /
    • pp.145-155
    • /
    • 2006
  • High level of reliability in facility operation is specifically required these days. The goal of this study is to secure a methodology for reliability analysis of hydro-power plant so that an appropriate decision for operation and investment can be made. Fault tree analysis of water supply system within hydro-power plant has been performed in this study. We briefly examined the electric power generation facility and water supply system. We then developed fault tree for the water supply system based on failure modes and effects analysis. We conclude this study and provided future research areas.

  • PDF

마그네트론 스퍼터용 20kW급 플라즈마 전원장치 개발 (Development of Module Type 20kW Plasma Power Supply for Magnetron Sputter)

  • 서광덕;김상훈
    • 산업기술연구
    • /
    • 제27권A호
    • /
    • pp.157-162
    • /
    • 2007
  • This paper describes a power supply aimed at the production of plasma and its control method for a magnetron sputter in thin film coating process of PVD(Physical Vapor Deposition). Plasma load changes its impedance characteristic easily according to operating conditions and frequently produces electric arc. So. in this paper, a plasma power supply with improved output control performance in the transient state for the plasma load is presented. Also, it includes a strategy that can detect arc rapidly and reduce arc energy effectively into a load. The validity of the proposed power supply through experimentation on 20kW system was proved.

  • PDF

424 MHz 소출력 무선주파수 전파특성 측정 및 분석 (The Measurement and Analysis of Radio Characteristic of 424 MHz Short Range Wireless Frequency)

  • 임용훈;최효열;오규환;이범석;현덕화
    • 한국전자파학회:학술대회논문집
    • /
    • 한국전자파학회 2005년도 종합학술발표회 논문집 Vol.15 No.1
    • /
    • pp.437-442
    • /
    • 2005
  • This paper deals with the measurement and analysis of radio characteristic of 424 MHz for using the automation of transmission and supply of electric power, ana automatic meter reading(AMR). Normally radio propagation characteristic is the base of system design, performance evaluation and choice of position of the base station in wireless communication. It is the most accurate way to design a base station through practical measurements, but it costs much time, money and engineers. So, we developed 424 MHz short range wave propagation model for AMR service.

  • PDF

에어컨부하 직접 제어시스템 실용화 연구 (Direct Load Control System for Air-conditioner)

  • 고상천;이상윤;김명수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 G
    • /
    • pp.3051-3053
    • /
    • 1999
  • In recent years, it becomes a worldwide trend that the power utilities focus their attention to Demand Side Management. Increasing Electric power consumption, they adopt a direct load management to accomplish low cost and stability of electric supply. Following this trend, KEPCO is researching a Direct Load Control System for Air Conditioner. This Paper presents the development results of the Direct Load Control System to Control electric power consumption of Conditioner in summer period this year.

  • PDF

전력수급계획 및 운용해석 종합시스템 개발 (Development of the Integrated System for Power System Operational Planning an)

  • 박시우;윤용범;남재현;안양근
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 C
    • /
    • pp.1042-1045
    • /
    • 1998
  • The main purpose of HITES(Highly Integrate Total Energy System) is to build and develop an integrated energy system for power system operational planning and analysis which consists of load forecast, economic generation schedule, stability analysis and relational database system. The integrated energy system can be utilized to supply a stable electric power and operate KEPCO power system facilities economically. This system will be put into operation in 1999. This paper describes the main feature of the HITES, system main functions, numerical methods adopted this system, and network configuration.

  • PDF

건물용 독립형 1kW급 PEMFC-배터리 하이브리드 시스템 기술 개발 (Development of Independent 1 kW-class PEMFC-Battery Hybrid System for a Building)

  • 양석란;김중석;최미화
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제5권2호
    • /
    • pp.113-120
    • /
    • 2019
  • We have developed 1 kW-class PEMFC-battery hybrid system independently powering to the building, through the process of system design, current load characteristics analysis, power system configuration for demonstration site and performance evaluation. In order to use the fuel cell and battery as the hybrid type, a control technology for the charging/discharging decision and charging speed of the battery is required rather than using fuel cell. Also output power distribution between PEMFC and the battery is a core of energy management technology. It is confirmed that it is possible to supply independently 1kW powering the building to ensure optimal energy management through the power control experiment of the hybrid system.

전력수급기본계획에 열병합발전 설비 반영 방법론의 개발 (The Development of Methodology in order to consider Combined Heat and Power in the Basic Plan of Long Term Electricity Supply & Demand)

  • 김용하;김미예;우성민;조성린;임현성
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제55권12호
    • /
    • pp.570-575
    • /
    • 2006
  • This paper develops methodology in order to consider CHP(Combined Heat and Power) capacity in the Basic Plan of Long Term Electricity Supply & Demand. We develop generating cost of CHP considering electric and heat. Also we develop mixed load duration curve which includes the electric load and heat load and then apply CHP capacity to SCM(Screening Curve Method) considering CHP feature. Accordingly, it decide the optimal CHP capacity in the Basic Plan of Long Term Electricity Supply & Demand. Also, We perform the sensitivity analysis according to cost variation.