Proceedings of the KIEE Conference (대한전기학회:학술대회논문집)
- 1998.07c
- /
- Pages.1042-1045
- /
- 1998
Development of the Integrated System for Power System Operational Planning an
전력수급계획 및 운용해석 종합시스템 개발
- Park, Si-Woo (Korea Electric Power Research Institute) ;
-
Yoon, Yong-Beum
(Korea Electric Power Research Institute) ;
- Nam, Jae-Hyun (Korea Electric Power Research Institute) ;
- Ahn, Yang-Keun (Korea Electric Power Research Institute)
- Published : 1998.07.20
Abstract
The main purpose of HITES(Highly Integrate Total Energy System) is to build and develop an integrated energy system for power system operational planning and analysis which consists of load forecast, economic generation schedule, stability analysis and relational database system. The integrated energy system can be utilized to supply a stable electric power and operate KEPCO power system facilities economically. This system will be put into operation in 1999. This paper describes the main feature of the HITES, system main functions, numerical methods adopted this system, and network configuration.
Keywords