• Title/Summary/Keyword: Electric power plant

Search Result 946, Processing Time 0.026 seconds

Co-combustion of Bituminous Coal with Anthracite in a Down-firing, 200 MW Boiler

  • Park, Ho Young;Baek, Se Hyun;Kim, Young Joo;Kim, Tae Hyung;Kim, Hyun Hee;Lim, Hyun Soo;Park, Yoon Hwa
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.1 no.1
    • /
    • pp.93-97
    • /
    • 2015
  • The combustion tests for Korean anthracite-bituminous coal blend were carried out in the 200 MW utility boiler. The burning characteristics of the blend were studied with a thermogravimetric analyzer (TGA). From the observation of TGA burning profiles, it was found that the presence of bituminous coal in the blend appeared to enhance the reactivity of anthracite in the higher temperature region, indicating certain interactions between the two coals. The plant test showed the boiler operation was reasonably stable with somewhat poor combustion efficiency, and some modification of the combustion environment in the furnace is necessitate for the further stable plant operation.

Failure Analysis of Circulating Water Pump Shaft in Power Plant (발전 계획에서 순환 물 펌프 고장 분석)

  • Lee, Jaehong;Jung, Nam-gun
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.7 no.1
    • /
    • pp.125-128
    • /
    • 2021
  • This paper presents the root cause failure analysis of the circulating water pump in the 560 MW thermal power plant. A fractured austenitic stainless-steel shaft operated for 24 years was examined. Fracture morphology was investigated by micro and macro-fractographic analysis. The metallurgical analyses including chemical analysis, metallography and hardness testing were performed. The analysis reveals that the pump shaft was fractured due to the reverse bending load with combination of rotating bending load. Corrective actions for plant operator was recommended based on the analysis.

A Feasibility Study on the Wind Power Plant for Common Residential Buildings in Youngdo Island, Busan (부산 영도구 공동주택에 대한 풍력발전 도입가능성)

  • Hwang, Kwang-Il;Kim, Jee-Hun;Shin, Hyoun-Ho;Lee, Su-Ho;Han, Je-Deok
    • Proceedings of the Korean Society of Marine Engineers Conference
    • /
    • 2006.06a
    • /
    • pp.255-256
    • /
    • 2006
  • A wind power plant is one of the competitive and effective energy among the regulated 13 renewable energies, especially for the seashore and island. This study is focused on the possibility of wind power plant as a on-site electric power supply system for the common residential building in Youngdo, Busan. The following show the results of this study. 26 apartments' monthly electric power consumptions are surveyed and monthly variations are stable comparing to the metropolitan. With the wind speed measured in Youngdo island and wind power plant efficiency data, the simulation is conducted and the result shows that 35 wind power units are satisfied with full electric power load for all the common residential buildings in Youngdo island.

  • PDF

AGING ASSESSMENT OF CANDU PLANT MAJOR COMPONENTS

  • Jeong, Il-Seok;Lee, Kyoung-Soo;Kim, Tae-Ryong
    • Proceedings of the Korea Society for Energy Engineering kosee Conference
    • /
    • 2003.05a
    • /
    • pp.415-423
    • /
    • 2003
  • Korea Electric Power Research Institute(KEPRI) had worked a comprehensive Plant Lifetime Management (PLiM) project for a CANDU plant in corporation with Korea Hydro and Nuclear Power(KHNP). The project had been performed to understand the aging status of major components screened from the plant and to address provisions for the continued operation over its design life. A feasibility of the continued operation was reviewed in the aspects of technology, economics, and regulatory environments. This paper introduces general approach of aging assessment, screening of critical components and an experience of aging assessment for an example of fuel channel that is the most critical component in CANDU plant.

  • PDF

Development of Power Performance Evaluation System using Modeling Technology (설비 모델링 기술을 이용한 발전성능평가 시스템 구성방안 연구)

  • Lee, Ji-Hoon;Lee, In-tae;Jung, Nam-Joon;Bae, Jung-Seok;An, Young-Mo
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.4 no.2
    • /
    • pp.81-88
    • /
    • 2018
  • Performance evaluation of a plant to efficiently manage and maintain the performance of the plant is a very important procedure. However, since the conventional performance evaluation method is an Excel-based manual method, the preparation procedure is complicated and the versatility is poor. In this paper, we analyze the problems of the existing performance evaluation system, effectively model the equipment, calculate the missing physical properties, and improve the versatility, efficiency and accuracy of the performance evaluation through the equipment modeler which performs automatic index calculation based on this.

Development of 132kV XLPE Cable Composite Bushing EB-A (132kV XLPE Cable용 Composite Bushing 기중종단접속함 개발)

  • Kim, J.H.;Oh, E.J.;Kim, K.Y.;Park, J.K.;Jeoung, Y.W.
    • Proceedings of the KIEE Conference
    • /
    • 2000.11c
    • /
    • pp.547-549
    • /
    • 2000
  • Silicone insulators have many advantages over porcelain insulators. Especially silicone insulators have good characteristics of impact hardness, surface insulation, ease of processing, mass productivity and don't have risk of bombardment and vandalism. Recently insulation part made by silicone are becoming widely used. In this paper we introduce the development of Sealing End for 132kV XLPE cable with silicone composite hollow insulator and the adoption of it to a actual transmission line in abroad. This paper contains of design procedure, structure, electrical performance of it.

  • PDF

Load Test Simulator Development for Steam Turbine-Generator System of Nuclear Power Plant

  • Jeong, Chang-Ki;Kim, Jong-An;Kim, Byung-Chul;Choi, In-Kyu;Woo, Joo-Hee
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.1384-1386
    • /
    • 2005
  • This paper focuses on development of load test simulator of a steam turbine-generator in a nuclear power plant. When load is taken off from electrical power network, it is very difficult to effectively control the steam flow to turbine of the nuclear turbine-generator, because of disturbances, such as electrical load and network unbalance on electrical network. Up to the present time, the conventional control system has been used for the load control on nuclear steam generator, owing to the easy control algorithms and the advantage which have been proven on the nuclear power plant. However, since there are problems with stability control during low power and start-up, only a highly experienced operator can operate during those procedures. Also, a great deal of time and an expensive simulator is needed for the training of an operator. The KEPRI is developed simulator for 600MW nuclear power plant to take a test of generator load rejection, throttle valve, and turbine load control. Total load test is implemented before start up.

  • PDF

Technical and Economic Assessment of CO2 Transportation Options for Large-scale Integrated Carbon Capture & Sequestration(CCS) Project in South Korea

  • Lee, Ji Hyun;Kim, Beom-Ju;Kwak, No Sang;Shim, Jae-Goo;Shin, Su Hyun;Hwang, Sun-Na;Lee, Jung-Hyun
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.3 no.1
    • /
    • pp.49-56
    • /
    • 2017
  • In order to examine the feasibility of Carbon Capture & Sequestration, a major technological strategy for the national goal of greenhouse gas reduction, this paper studies the various methods and corresponding costs for the transportation of $CO_2$ captured at the domestic thermal power plants, as well as performing comparative analysis with overseas CCS demonstration projects. It is predicted that the investment cost would be about 98 million USD when the using land-based pipelines to transport captured $CO_2$ from the thermal power plant located in the south coast. And using marine-based offshore pipelines, it will cost about twice the amount. When the captured $CO_2$ is transported from the power plant in the west coast instead, the cost is expected to increase substantially due to the transportation distance to the storage site being more than double to that of the south coast power plant case.

Nondestructive Testing and Applications for Electric Power Plant Equipments by Acoustic Emissin Technology (음향방출기술에 의한 발전설비 비파괴검사 및 응용)

  • Lee, Sang-Guk
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.24 no.4
    • /
    • pp.396-409
    • /
    • 2004
  • Diagnosis f structural integrity is the basis for correct treatment of and countermeasures against progressive structural abnormalities. An exact diagnosis is at present the most reliable means for determining the soundness of structures during power plant operations. Acoustic emission(AE) technology has recently strengthened its application base, and practitioners' understanding of the technique's fundamentals. This paper presents the results of a survey and assessment on AE monitoring applications in nuclear, fossil and hydraulic power plant. The main objective of this paper was to obtain information on various applications of AE technology in electric power plant.