Recently, the needs and concerns for the power loss are increasing according to the energy conservation at the level of the national policies and power utilities's business strategies. Especially, the issue of the power loss is the main factor for the determining the electric pricing rates in the circumstances of the deregulation of electrical industry. However, because of the lacking of management for power loss load factors (LLF), it is difficult to make a calculation for the power loss and to make a decision for the electric rates. And loss factor(k-factor), which is a most important factor for calculation of the distribution power loss, has been used as a fixed value of 0.32 since the fiscal year 1973. Therefore, This study presents the statistical calculation methods of the loss factors classified by load types and seasons by using the practical data of 65 primary feeders which are selected by proper procedures. Based on the above the algorithms and methods, the optimal method of the distribution loss management classified by facilities such as primary feeders, distribution transformers and secondary feeders is presented. The simulation results show the effectiveness and usefulness of the proposed methods.
This paper presents the result of survey of case study for harmonics in electrical installations of buildings. Recently, many power electronic equipments(power converter, computers, air conditioners electronic ballasts for fluorescent lamps and so on) are used in office buildings, and harmonic current from them influence the other equipments in a distribution line. Notably, voltage distortion or voltage harmonics may approach or exceed is allowable level in power distribution system. Individual electric power consumers and end-users and responsible for reducing current harmonics while companies or utilities are responsible for reducing voltage harmonics at the point of common coupling in distribution system. As for harmonics, which one of the electric power qualities, it becomes important to obtain harmonic voltage/current distribution of the power system precisely because the use of power electronic apparatus in increasing. To suppress harmonics in electrical ins tallations of buildings, one of many methods suggest that resonance frequencies are controlled by modulating the capacities of high-voltage customer's capacitors.
Earthquakes of magnitude 3.0 or greater occur in Korea about 10 times on average yearly, and the number of earthquakes occurring in Korea is increasing. As many earthquakes have recently occurred, interest in the safety of nuclear power plants has increased. Nuclear power plants are equipped with many cabinet-type control facilities to regulate safety facilities, and function maintenance is required during an earthquake. The seismic performance of the cabinet is divided into structural and functional performances. Structural performance can be secured during the design procedure. Functional performance depends on the vibration performance of the component. Therefore, it is necessary to confirm the seismic performance of the components. Generally, seismic performance is confirmed through seismic simulation tests. When checking seismic performance through seismic simulation tests, it is difficult to determine the effect of frequency and maximum acceleration on an element. In this paper, shaking table tests were performed using various frequencies and various maximum accelerations. The seismic performance characteristics of the functions of electrical equipment components were confirmed through tests.
The small coastal vessel registered in Korea, small coastal vessels with a gross tonnage of 10 tons or less account for 94.6 % and among them, aged vessels over 16 years age indicate 40.6 %. In order to reduce GHG emissions from small coast vessels, discussions are underway to replace aging ships' propulsion units with eco - friendly propulsion facilities, and the electric propulsion ship is emerging as one of the measures. The electric propulsion system using the DFE rectifier, which was applied in the conventional large commercial vessel, was effective in reducing the harmonics and improving the DC output voltage of the DC link stage, but it occupied a large volume and caused an increase in the overall system price. Therefore, in this paper, we propose an electric propulsion system using AFE rectifier with a small volume of system that can be applied to a small coastal vessel. In order to analyze the effectiveness of the overall system, the load profile was applied to obtain accurate and rapid speed tracking performance of the propulsion motor affected by the speed load. In addition, the power factor and total harmonic distortion factor of the voltage and current on the improved power output side are derived through simulation.
철도에서의 고압배전선로는 역사조명 및 동력설비, 그리고 열차의 안전운행을 위한 신호설비의 전력을 공급해주는 설비로 열차의 안전운행 및 철도 이용자의 서비스 향상을 위한 중요한 역할을 담당하고 있다. 또한 각종 전력기기의 전자화, 자동화로 인해 양질의 전력공급이 요구되며, 철도 이용자에 대한 보다 향상된 서비스를 제공과 역사내 전기에너지 사용의 급증으로 인한 전력공급의 신뢰성 확보가 요구된다. 본 논문에서는 철도고압배전계통의 고장현상을 분석하기 위하여 철도고압배전 설비 중 접지계통과 비접지계통에 대해서 사고시 전압강하가 발생 여부와 사고를 제거하기 위해 차단기를 동작시켰을 때의 서지전압에 의한 과도특성을 PSCAD/EMTDC를 이용하여 모의하였으며, 이 사고모의 결과를 토대로 비접지 고압배전계통의 보호방법에 대한 대안을 제시하였다.
본 연구에서는 의사결정기관의 상대적 효율성을 측정할 수 있는 유용한 기법으로 알려진 DEA 모형을 이용하여 국내 6개 발전회사의 효율성을 비교 분석하였다. 투입방향 CCR 및 BCC 모형에 의해서 분석된 연구 결과로는 첫째, 총 발전설비용량을 투입변수로 사용하였을 때와 각 발전원별로 설비용량을 구분하여 투입변수로 사용하였을 때와 서로 다른 연구결과를 얻었다. 이는 각 발전설비의 고정비(발전설비)와 변동비(연료비) 특성이 감안된 결과로 생각된다. 둘째, 본 연구에서 논의된 발전원별 투입변수가 중장기 발전설비용량 확장계획 기간의 효율성 평가에 사용되면 각 발전회사의 효율성은 현재 수준보다 높아질 것이다. 본 연구는 발전회사의 효과적인 경영활동을 위한 유익한 정보를 제공할 수 있을 것으로 기대된다.
무선 통신 기술이 발달함에 따라 유비쿼터스 환경에 대한 많은 연구가 진행되고 있다. 초기 물류분야에서 활용되었던 RFID기술은 점차적으로 센싱 기능을 추가하면서 발전하고 있고, 추후에는 이 센서들 간의 네트워크가 구축되어 USN (Ubiquitous Sensor Network) 형태로 발전해나갈 것이다. 본 연구에서는 전력설비에 대한 감시 감독을 위해 RFID를 이용하여 전력 설비에 대한 자산 관리나 감시 및 순시에 대한 정보를 기록, 관리하며, 다양한 센서를 이용하여 전력 설비에 대한 실시간 정보를 수집할 수 있도록 USN을 활용하는 전력설비관리 서비스 프레임워크를 구현하였다. 안정적인 전력 공급을 위해서는 전력 선로에 대한 안전성 확보가 중요한 요소이며, 이를 위해 실시간 감시는 매우 중요한 요소 중 하나이다. 현재는 중요 설비에 대하여 광케이블이나 PLC 등과 같은 유선 통신망을 설치하여 감시 정보를 수집하고 있다. 본 연구에서는 고가의 유선망을 설치하지 않고 무선 통신 기반의 저가형 센서를 이용하여 데이터를 수집하고 전송할 수 있도록 무선센서노드를 개발하였다. 또한 각 장비로부터 실시간으로 전송되는 데이터를 안정적으로 수집하고 필터링 및 요약을 통해 응용 프로그램에 정보를 제공할 수 있도록 서비스 프레임워크를 설계하였으며, 이를 바탕으로 전력설비관리 서비스를 개발하였다.
본 논문에서는 자가용 전기설비에서 전기안전관리자의 PL인식과 전기설비의 사고발생에 관한 것을 조사하였다. 설문대상은 자가용 수용가 450호를 선정하였으며, 이중 154호가 설문에 응신하여 35.8[%]를 차지하였다 전기안전관리자의 58[%]는 PL에 관해 잘 알고 있었으며, 42[%]는 인식하고 있지 않았다. 이들 중 82.4[%]는 전기설비에 PL법이 적용되어야 된다고 하였으며, 5.8[%]만이 PL법의 적용이 필요 없다고 대답하였다. PL적용의 이유로는 전기설비와 제품의 안정성을 위한 것이 64[%], 동일사고의 방지가 19[%]를 차지하였다. 또한 변압기 사고가 가장 많은 부분을 차지하였으며, 케이블 사고가 그 뒤를 따랐다. 설문조사 결과로부터, 전기안전관리자들은 PL내용에 많은 관심이 있었으며, 그들은 전기사고에 관한 PL적용의 필요성을 기대하고 있었다.
In addition to the energy storage facilities based on high power technologies, Electric double layer capacitors(EDLC) are today's candidate for power quality stabilization. However, its low energy density is often inhibiting factor for application of electric power industry. Hybrid supercapacitor is an promising energy storage device that positioned between conventional EDLC and Li-ion battery. This paper describes the preparation and characteristics of a hybrid supercapacitor and module for power quality stabilization. A cylindrical 3200F hybrid supercapacitor ($60{\times}74.5mm$) was assembled by using the $Li_4Ti_5O_{12}$ electrode as an anode and activated carbon as a cathode. It shows 2.5 times higher energy density than conventional EDLC with the same volume. In order to determine the characteristics of the hybrid supercapacitor Module for uninterruptible power supply (UPS), hybrid supercapacitor cells were connected in series with active balancing circuit. At even the high current density of 14A(10C), Module prepared by 18 cells showed the capacitance of 170F at 30~50V, suggesting the applicability for UPS.
Internet Data Centers (IDCs), which are essential facilities in the modern IT industry, typically have scores of MW of concentrated electric loads. The provision of an Uninterruptible Power Supply (UPS) is necessary for the power feed system of IDCs owing to the need for stable power. Thus, conventional IDC AC power feed systems have three cascaded power conversion stages, (AC-DC), (DC-AC), and (AC-DC), resulting in a very low conversion efficiency. In comparison, DC power feed systems require only a single power conversion stage (AC-DC) to supply AC main power to DC server loads, resulting in comparatively high conversion efficiency and reliability [4-11]. This paper compares the efficiencies of a 220V AC power feed system with those of a 300V DC power feed system under equal load conditions, as established by the Mok-Dong IDC of Korea Telecom Co. Ltd. (KT). Experimental results show that the total operation efficiency of the 300V DC power feed system is approximately 15% higher than that of the 220V AC power feed system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.