• Title/Summary/Keyword: Electric power equipments

Search Result 218, Processing Time 0.023 seconds

Development of Measurement and Performance Testing System for Heat Pump water Heater (히트펌프 온수기 개발을 위한 계측 및 성능평가시스템 구축)

  • Kwon, Seong-Chul;Yang, Seung-Kwon
    • Proceedings of the KIEE Conference
    • /
    • 2004.07d
    • /
    • pp.2310-2312
    • /
    • 2004
  • In Korea Electric Power Corporation (or KEPCO), several Demand-Side Management (or DSM) program have been carried out to effectively meet electric power demand at least costs by modifying customers electricity use patterns. As one of them, KEPCO applies low-priced night thermal-storage power service for heat appliances to facilitate efficient use of power facilities by shifting relatively high daytime demands to night hours to build loads during the off-peak periods. In the market of heat-storage type water-heater, electric water-heater has been mostly used, but it has low energy efficiency and needs high capacity electric equipments. So in order to replace these electric water heaters, 15 HP air-source heat pump water heater is developed in Korea Electric Research Institute (or KEPRI). This paper shows that measurement system for performance testing of heat pump water heater is established and heating capacity and performance is analyzed and measured for out-door environmental change.

  • PDF

Comparative Analysis of a Competitive Technology for a Major Electrical Power System

  • Koo, Young-Duk;Kim, Eun-Sun;Park, Young-Seo
    • Journal of information and communication convergence engineering
    • /
    • v.2 no.4
    • /
    • pp.243-246
    • /
    • 2004
  • Currently, advanced countries invest lots of efforts to develop improvement of electric power production and supply, confronting environmental problems and new energy development. They set up long term plan focusing on electric power transmission infrastructure construction technology, establishment of the customer care service network using electric technologies, improvement of economic productivity by innovative electric technology, prevention of global warming gas and clean and efficient energy use etc. Comparing to those countries, the level of technologies that we have are in behind and moreover, technological resources are limited. Therefore, Korea is required to reconsider efficient distribution of R&D investment by concentrating on limited R&D resources to important technologies which could be stepping stone to gain competitive advantage. It can be done through comparative analysis of electric technologies among advanced countries and analysis of electric technology development policy.

Estimation of Load Pattern due to Midnight Power Equipment (겨울철 심야기기 사용에 따른 부하사용패턴 추정)

  • Kim, C.S.;Rhee, C.H.;Jin, B.M.;Baek, Y.S.
    • Proceedings of the KIEE Conference
    • /
    • 2001.11b
    • /
    • pp.48-50
    • /
    • 2001
  • Recently, electric heating using midnight power has brought a rapid increase. due to a rise of oil price and a low tariff of midnight power. Therefore, the increase of midnight power use has much influenced on midnight load pattern. This paper estimates the load pattern due to midnight power equipments, analyzes the influence of the spread of midnight power equipments on midnight load and suggests reasonable spread level of equipments.

  • PDF

Diagnosis of a trouble existence and development of prediction method for electrical equipment inside a building (건축물 내 전기설비 이상 유무 진단 및 예측기법 개발)

  • Kim, Young-Dal;Kim, Hyo-Jin;Kim, Dae-Sik;Kim, Jae-Hoon;Han, Sang-Ok
    • Proceedings of the KIEE Conference
    • /
    • 2005.07e
    • /
    • pp.31-33
    • /
    • 2005
  • The accelerating of industrial development causes electricity demand to increase. By that power equipments need high power, multi function and intelligence. Also consumers demand for guarantee power supplying of good quality and reasonable operating equipment. Also they require for reliance and stabilization of power facility. Therefore preventive maintenance of electric installation must be developed and improvement of domestic technical level is needed in the maintenance management of equipment. The diagnosis of trouble existence is technique that compares steady state with unusual condition, whereas the prediction technique makes a diagnosis of remaining equipments life. It is difficult for us to diagnose trouble existence of electric installation and to develop prediction method in building because of a wide scope for electric installation in building. And in this paper we will investigate diagnosis and prediction method for only switch part of electric installation in building.

  • PDF

Design of a Prototype Fibre Optic Based Monitoring and Control System for Future KEPCO's 765kV Substation (765kV 변전소 감시제어용 시범시스템)

  • Jiang, Moon-Myung;Chung, Sang-Jin;Choi, Jong-Hyoub;Park, Jong-Myung
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.883-886
    • /
    • 1996
  • Instead of point-to-point hard wiring between substation yard equipments and SCADA RTU(Remote Terminal Unit), fibre optic cable will be used in the portion between Local Units and Central Unit in the future KEPCO 765kV substation. The connections between substation yard equipments and nearby Local Unit remain the same hard wiring. The new fibre optic system will provide security especially during ground faults and is immune to electrical noise. A prototype system will be manufactured and installed in the existing 154kV Yeosan Substation by the end of July this year and operated for one year. By incorporating the operation experiences acquired in the system, an improved system will be commercially applied to 765kV Shin-An-Seong Substation where 345kV GIS will be installed initially and act as the switching station in the year 1998. The system is composed of one Central Unit and several Local Units. The Central Unit is composed of two workstation level computers, one is in operation and the other backup, and a Communication Control Unit. The Local Unit uses the existing SCADA RTU technology and takes the form of a distributed one. Between the Communication Control Unit and Local Units, the fibre optic system with star-coupler is used.

  • PDF

Development of an Integrated Control and Monitoring System for Emergency Power Generators (비상발전기 통합제어 및 감시시스템 개발)

  • 진강규;류길수;윤지근;유성호;김재환
    • Proceedings of the Korean Society of Marine Engineers Conference
    • /
    • 2001.05a
    • /
    • pp.192-196
    • /
    • 2001
  • These days, most of electric power facilities need high stability. Therefore integrated system has been required to monitor and control electronic power distribution system in fields at all times when the interruption of electric power has occurred. To construct this system, unit that convert and process the input signal from fields needed. And for control and monitoring from remote place MMI software is required. Lastly network equipments are required for real-time communications. So, in this paper, units for control and monitoring of emergency power generator and for electric power monitoring in normal electric power and interruption of electric power are developed. Also integrated remote system for monitoring in remote is developed.

  • PDF

A Study on the Unification of the Grounding System of SeoulMetro (서울메트로 접지설비 표준화 방안 연구)

  • Kim, Gyun-Sig;Park, Han-Yeong;Back, Yu-Ho
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1027-1036
    • /
    • 2007
  • Since the opening of the Seoul Metro in 1974, the electric railway passengers have been increased rapidly and as the advanced equipments(OC,PSD) were introduced, additional power facilities were built in a limited area for the comfortable transportation environment. Present grounding system were built according to old Electric equipment standards and all the electric signal, communication and electronic equipments were built only for the purposes of protecting building structure, people and electronic equipments. Grounding system which was additionally built in the limited area caused problems with the building structure and it caused secondary damages when earth fault happens. One of the problems is grounding system of the building structure; grounding system does not work properly since grounding equipments are not separated from each other. So, existing grounding system needs to be improved and unified grounding system in the building should be established. The purposed of this study is to analyze all the grounding systems that had been built in different year and to establish unified grounding system of Seoul Metro.

  • PDF

Technical Problems and solution based on Connection of Dispersed Power System into Power Distribution System (분산형전원의 배전계통연계에 따른 기술적 과제와 대책)

  • Yoon, G.G.;Yoon, T.S.;Roh, H.N.;Park, C.H.;Kim, J.O.;Kim, J.S.
    • Proceedings of the KIEE Conference
    • /
    • 2001.04a
    • /
    • pp.485-487
    • /
    • 2001
  • Electric power has traditionally been supplied to the demander through power generation, its transmission, and final distribution system. It is, however, expected that the various dispersed power system will be located near demanders and act as a power source based on the efficient management of electric power demanders and the optimal utilization of substitute energy. More stable electric power and efficient utilization of various power sources can be guranteed through the connection of the dispersed power system into the existing power system. It is the purpose of this study that, in the case of the connection of dispersed power system into the existing distribution line, effects of the connection on the power quality and plans for protection of power equipments are discussed and solutions of them are proposed.

  • PDF

A Method for Determining Appropriate Maintenance Intervals of Equipments in Thermal Power Stations

  • Nakamura, Masatoshi;Katafuchi, Tatsuro;Hatazaki, Hironori
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1998.10a
    • /
    • pp.312-317
    • /
    • 1998
  • Reliable maintenance scheduling of main equipments is a crucial problem in thermal power stations in order to skirt overall losses of power generation resulted from severe failures of the equipments. A reasonable method was proposed to determine the maintenance scheduling of whole pump system in thermal power stations in order to reduce the maintenance cost by keeping the present avail-ability of the pump system throughout the operation. The dimensional reduction method was used to solve problems encountered due to few data which involved many operational factors in failure rate of pumps. The problem of bandlimited nature of data with time was solved by extrapolating future failures from presently available actual data with an aid of Weibull distribution. The results of the analysis identified the most suitable maintenance intervals of each pump type accordingly and hence reduce the cost of unnecessary maintenance with an acceptable range in the overall system availability.

  • PDF

The hardware and software design of new distribution automation system (신 배전자동화 시스템의 하드웨어 및 소프트웨어 설계)

  • Ha, Bok-Nam;Han, Yong-Huei;Lee, Jung-Ho;Cho, Nam-Hun;Lim, Seong-Il
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1428-1430
    • /
    • 1999
  • The New Distribution Automation System(NDAS) was composed of several equipments, computer system, communication system, feeder remote unit, switches and so on. In this paper, we introduce the conception of hardware and software design about Central Control System, the communication method and protocol in Feeder Remote Unit, the Automatic Switch, the operating software, consideration factors in the feeder automation(FA) and the system configuration of NDAS in power distribution test center.

  • PDF