• 제목/요약/키워드: Electric Power System Interconnection

검색결과 44건 처리시간 0.036초

동북아 전력계통 연계로 인한 환경성 분석 및 국내 전원구성에의 영향 평가 (Environmental Analysis and Evaluation on Fuel Mix by Electric Power System Interconnection in Northeast Asia)

  • 정구형;김홍근;김발호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.769-771
    • /
    • 2005
  • Interconnection of electric power systems, as an alternative for energy cooperation under regional economic bloc, has been under extensive debate before progressing the restructure in electric power industry and rapidly expanded in many regions after 1990s. Especially, since northeast asia has strong supplementation in resource, load shape, fuel mix etc., electric power system interconnection in this region may bring considerable economic benefits. In this paper, we evaluate economic benefits from CO2 emission abatement and effectiveness on the fuel mix in Korea by the interconnection in northeast asia. For this analysis, we evaluate effects of CO2 emission abatement under various system interconnection scenarios and compare the results of fuel mix in Korean electric power system with and without transacted electricity via interstate electric power system in northeast asia.

  • PDF

동북아 전력계통 연계에 따른 경제성 분석 (Economic Feasibility on the Interconnected Electric Power System in North-East Asia)

  • 정구형;한석만;김발호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제55권2호
    • /
    • pp.76-84
    • /
    • 2006
  • Interstate electric power system, as an alternative for energy cooperation under regional economic block, has been hotly debated before progressing the restructure in electric power industry and rapidly expanded in many regions after 1990s. Especially, since northeast asia has strong supplementation in resource, load shape, fuel mix etc., interconnection of electric power systems in this region may bring considerable economic benefits. This paper implements a mathematical optimization model, ORIRES, proposed by Russia, in analysing the economic feasibility of system interconnection. Additional analyses on the environmental impact of the system interconnection, and sensitivity of key factor inputs have been performed.

동북아 전력계통 연계를 통한 융통전력 도입 시 가격상한 수준에 대한 분석 (Estimation of Electricity Price of the Imported Power via Interstate Electric Power System in North-East Asia)

  • 김홍근;정구형;김발호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제55권3호
    • /
    • pp.128-132
    • /
    • 2006
  • Interstate electric power system, as an alternative for energy cooperation under regional economic bloc, has been hotly debated before progressing the restructure in electric power industry and rapidly expanded in many regions after 1990s. Especially, since northeast asia has strong supplementation in resource, load shape, fuel mix etc., electric power system interconnection in this region may bring considerable economic benefits. Moreover, since Korean electric power system has a great difficulty in a geographical condition to interrupt electricity transaction with other countries, it has been expanded as an independent system to supply all demand domestically. As a result, Korean electric power system makes considerable payment for maintaining system security and reliability and expands costly facilities to supply a temporary summer peak demand. Under this inefficiency, if there are electricity transactions with Russia via the North Korea route then economic electric power system operation nay be achieved using seasonal and hourly differences in electricity price and/or load pattern among these countries. In this paper, we estimate price cap of transacted electricity via interstate electric power system in northeast asia. For this study, we perform quantitative economic analysis on various system interconnection scenarios.

분산형전원의 계통연계 기술에 관한 연구 (A Study on the Interconnection technology to Power System of the Dispersed Stroage and Generation System (DSG))

  • 노대석;김호용;김응상
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1992년도 하계학술대회 논문집 A
    • /
    • pp.126-129
    • /
    • 1992
  • Compared to other sources of electricity such as Thermal and Nuclear power plant, dispersed storage and generation system (DSG) is environmentally clean, quiet and efficient, thus this source is expected to be introduced In urban area by the utilities and customers. If a great number of DSG will be applied to electric power system in the rear future (around 2000, in Korea), these will give a great influence on the existing power system. In other words, the interconnection to electric power system of these source may bring many problems such as system operation, protection coordination, and service quality related with voltages (110${\pm}$6V, 220${\pm}$13V), harmonics (5%) and pour factor (90% over). So, this analysis of the interconnection to power system of DSG is required

  • PDF

동북아 전력계통 연계를 통한 융통전력 도입 시 가격상한 수준에 대한 분석 (Analysis of Electricity Price Cap Transacted via Interstate Electric Power System in Northeast Asia)

  • 정구형;김홍근;김발호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.772-774
    • /
    • 2005
  • Interstate electric power system, as an alternative for energy cooperation under regional economic bloc, has been hotly debated before progressing the restructure in electric power industry and rapidly expanded in many regions after 1990s. Especially, since northeast asia has strong supplementation in resource, load shape, fuel mix etc., electric power system interconnection in this region may bring considerable economic benefits. Moreover, since Korean electric power system has a great difficulty in a geographical condition to interrupt electricity transaction with other countries, it has been expanded as an independent system to supply all demand domestically. As a result, Korean electric power system makes considerable payment for maintaining system security and reliability and expands costly facilities to supply a temporary summer peak demand. Under this inefficiency, if there are electricity transactions with Russia via the North Korea route then economic electric power system operation may be achieved using seasonal and hourly differences in electricity price and/or load pattern among these countries. In this paper, we estimate price cap of transacted electricity via interstate electric power system in northeast asia. For this study, we perform quantitative economic analysis on various system interconnection scenarios.

  • PDF

Economic Feasibility on the Interconnected Electric Power Systems in North-East Asia

  • Chung, Koo-Hyung;Kim, Bal-Ho H.
    • Journal of Electrical Engineering and Technology
    • /
    • 제2권4호
    • /
    • pp.452-460
    • /
    • 2007
  • The interstate electric power system, as an alternative for energy cooperation under regional economic block, was fervently debated prior to the restructuring of electric power industries and rapidly expanded in many regions since the 1990s. Especially, electric power system interconnection in the Northeast Asia region may bring considerable economic benefits since this region has strong supplementation in resource holdings, load shape, fuel mix, and etc. In this paper, we implement the ORIRES model, proposed by ESI of Russia, in order to analyze the economic feasibility on the Northeast Asia Region Electrical System Ties (NEAREST) project.

동북아 전력계통 연계에 따른 경제성 분석 (Economic Analysis on the Interconnected Electric Power System in Northeast Asia)

  • 정구형;김경민;박중성;한석만;김발호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.766-768
    • /
    • 2005
  • Interstate electric power system, as an alternative for energy cooperation under regional economic bloc, has been hotly debated before progressing the restructure in electric power industry and rapidly expanded in many regions after 1990s. Especially, since northeast asia has strong supplementation in resource, load shape, fuel mix etc., interconnection of electric power systems in this region may bring considerable economic benefits. For the economic analysis, we implement ORIRES model developed by ESI, Russia. ORIRES is a linear programming (LP) model for electric power system operation and planning. Since ORIRES requires data relatively less than other model, it is suitable for northeast asia that has considerable restriction against required data acquisition. In this paper, we perform an economic analysis on interconnection in northeast asia.

  • PDF

서부아프리카 국가간 연계 송전망 타당성 조사 (Feasibility Study for the Ghana-Mali 225kV Interconnection Project)

  • 김종화;이철휴;이영길;최상주
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.38-39
    • /
    • 2008
  • KEPCO conducted the project called the "Feasibility Study for the Han (Ghana) - Bobo Dioulasso (Burkina Faso) - Bamako (Mali) Interconnection Project" as its first African project. This paper deals with power system analysis and Transmission line and substation design of approximately 750 kilometers of the 225 kV single circuit transmission lines and six substations. The main contents of the power system analysis results and preliminary engineering design include power flow, transient stability, eigenvalue analysis, transmission line design, substation design and economic analysis.

  • PDF

PV 시스템의 계통연계를 위한 새로운 고립운전 방지 알고리즘 (A Novel Anti-islanding Algorism for Utility Interconnection of PV System)

  • 윤중혁;김흥근;최종우;유권종
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 춘계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.271-273
    • /
    • 2005
  • Islanding of PV systems occurs when the utility grid is removed but local sources continue to operate and provide power to local loads. Islanding is one of the serious problems in an electric power system connected with dispersed power sources. Also, this can present safety hazards and the possibility of damage to other electric equipments. If the real and reactive power of RLC load and PV system are closely matched, islanding phenomena can't be detected by the passive methods. Several active methods were proposed to detect islanding phenomena. The most effective method is SFS method which was suggested by Sandia National Laboratory. In this paper, a new anti-islanding algorithm is proposed and its validity is verified through simulation and experimental results for utility interconnection of PV system.

  • PDF

배전선로의 분산 전원 상시 연계용량 기준 상향 타당성 연구 (Increasing Hosting Capacity in KEPCO Distribution Feeders)

  • 조성수;심준보;임현옥;김현진;김성만;주상도;송종협
    • KEPCO Journal on Electric Power and Energy
    • /
    • 제5권4호
    • /
    • pp.311-321
    • /
    • 2019
  • 정부의 재생e 3020 이행계획 및 제 8차 전력수급 기본계획과 함께 국내 분산 전원 연계 사업이 활발하게 진행되고 있다. 특히 2016년 10월 시행된 1 MW이하의 분산 전원 접속 보장 제도의 시행 이후, 배전 계통의 분산 전원 연계 신청이 급증함에 따라 송배전 설비부족으로 분산 전원 접속 지연이 일어나는 문제와, 이로 인해 국내 분산 전원의 70 %가 연계되어 있는 배전 계통의 신증설 투자비가 증가하는 문제가 이슈로 부각되고 있다. 현재 배전 계통의 분산 전원 수용력(hosting capacity) 확보 방법은 물리적인 배전 설비 추가 확충 이외에는 대안이 없는 것이 현실인데, 이러한 방식은 아래와 같은 어려움이 따른다. 첫째, 분산 전원의 대다수를 차지하는 태양광은 일조량이 풍부하고 지가가 저렴한 야외, 산악지역에 보급되므로 배전선로 경과지 확보가 점점 어려워지고 있다. 이로 인해 지중 구간이 증가하여 공사비가 증가하며, 태양광 야외 지역 위치로 공사 거리, 기간이 증가하게 된다. 둘째, 지자체의 공사 인허가 비협조 사례가 증가하여 이로 인해 공사가 지연되어 민원이 야기된다. 셋째, 배전선로 공사 자체에 1년 이상의 공사기간이 소요되므로 분산 전원을 적기에 접속시킬 수가 없으며, 넷째, 접속 신청은 지속 증가하므로 이에 따라 배전 설비 확충 비용 또한 지속 증가 할 수 밖에 없다. 이렇게 물리적 설비확충으로 발생하는 문제에 대응하여 접속 대기를 최소화하면서도 공사(투자비)를 최소화 할 수 있는 방안은 설비이용률을 극대화하는 것이며, 본 연구는 이러한 고민에서 시작되었다. 그러므로 본 논문에서는 현재 배전 계통의 분산 전원 연계 현황, 태양광 최대 출력 실적, 최소 부하, 선로 특성의 분석을 통해 배전선로의 분산 전원 상시연계용량 기준을 상향하기 위한 타당성을 검토하였으며, 배전선로의 분산 전원 상시연계용량 기준을 위한 상향(안)을 제시하였다.