• Title/Summary/Keyword: Electric IT Equipment

Search Result 614, Processing Time 0.045 seconds

Development and the Long-Term Test of Anti-Adhesion Surface Coating Technology on Electric Power Distribution Equipment (배전기기 외함 부착방지 및 자기세정 코팅기술 개발 및 현장실증)

  • Shim, Myung Jin;Sohn, Song Ho;Seo, Ji Hoon;Han, Sang Chul
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.6 no.3
    • /
    • pp.285-288
    • /
    • 2020
  • The demand for coating technology on electric power equipment that has arisen from such issues regarding the attaching of illegal advertisements and posters to electric power distribution boxes such as TR, SW, etc. in down town areas seeks to produce functional coating surfaces using polymers and nano-materials that will result in improvements in self-cleaning performance and greater stability even under harsh environmental conditions. KEPCO-coatings consist of copolymerized acrylic resin and methacryl-modified reactive silicone that are able to chemically combine, which results in performance improvement without any leakage of of silicone, thus contributing to its properties of high-stability. Thus, the research team has also started long-term on-site testing on 9 electric power distribution spots around a city center in cooperation with the KEPCO Daeduck-yusung branch. The KEPCO-coating technology could advance the best coating materials and processes to meet appropriate circumstances for a variety of outdoor damage environment. It is also predicted that KEPCO could be possible to expand international electric maintenance markets and to arrange business platforms if KEPCO would achieve its original technology (IPs) by the means of upgrading in self-cleaning coating technology and obtaining long-term on-site test records from nationwide electric facilities.

Conformance Test Technique for the Electric Power IT Protocol based on TTCN-3 (TTCN-3를 이용한 전력 IT Protocol Conformance Test 기법)

  • Song, Byeong-Kwon;Jang, Yong-Gi;Jeong, Tae-Eui;Kim, Gun-Woong;Kim, Jin-Chul;Kim, Young-Eok
    • Proceedings of the KIEE Conference
    • /
    • 2008.11a
    • /
    • pp.373-375
    • /
    • 2008
  • TTCN-3(Testing & Test Control Notation Version 3) defined in EISI(2001) are the standardized test specification and test implementation language of applicable for all kinds of black-box testing for reactive and distributed system, telecom systems, Mobile system, Internet, CORBA based system, java, XML, etc. This paper using the TTCN-3 on an Electric Power IT Protocol DLMS(Device Language Message Specification) standards for the implementation of the device equipment test the suitability of the protocol.

  • PDF

Foundation Research for Reinforced Concrete Substitution Grounding Electrode (철근콘크리트 대용접지극에 관한 기초 연구)

  • Kim, Sung-Sam;Lee, Chung-Sik;Koh, Hee-Seog
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2004.11a
    • /
    • pp.305-308
    • /
    • 2004
  • There are ground facility of maintenance in house electric facility of infra maintenance electric home appliances having used multifariousness in house, that use electric energy of common source for equipment. The body of building such as the reinforced concrete construction is structurally united, and the electric resistance is also small. It is possible that those foundations have contacted the ground at large surface area and that it substitutes the building construction body for the earth electrode. This is called "the structure earthing". This method has been defined at electrical facilities technical standards and KS in our country, and it has been used in various quarters practically. However, in our country, there is no example of using the foundation of the house as substitution earth electrode practically, and the means of the evaluation as electrode has not been established either. Then, in this paper, basic research for utilizing foundation of the house as substitution earth electrode is carried out.

  • PDF

Vulnerability Analysis of Network Communication Device by Intentional Electromagnetic Interference Radiation (IEMI 복사에 의한 네트워크 통신 장비의 취약성 분석)

  • Seo, Chang-Su;Huh, Chang-Su;Lee, Sung-Woo;Jin, In-Young
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.31 no.1
    • /
    • pp.44-49
    • /
    • 2018
  • This study analyzed the Vulnerability of Network Communication devices when IEMI is coupled with the Network System. An Ultra Wide Band Generator (180 kV, 700 MHz) was used as the IEMI source. The EUTs are the Switch Hub and Workstation, which are used to configure the network system. The network system was monitored through the LAN system configuration, to confirm a malfunction of the network device. The results of the experiment indicate that a malfunction of the network occurs as the electric field increases. The data loss rate increases proportionally with increasing radiating time. In the case of the Switch Hub, the threshold electric field value was 10 kV/m for all conditions used in this experiment. The threshold point causing malfunction was influenced only by the electric field value. The correlation between the threshold point and pulse repetition rate was not found. However, in case of the Workstation, it was found that as the pulse repetition rate increases, the equipment responds weakly and the threshold value decreases. To verify the electrical coupling of the EUT by IEMI, current sensors were used to measure the PCB line inside the EUT and network line coupling current. As a result of the measurement, it can be inferred that when the coupling current due to IEMI exceeds the threshold value, it flows through the internal equipment line, causing a malfunction and subsequent failure. The results of this study can be applied to basic data for equipment protection, and effect analysis of intentional electromagnetic interference.

Electrorheological Properties of ER Fluid under High Shear Flow (고속 전단유동에서 ER유체의 전기유변 특성)

  • Kim Y. C.;Kim K. W.
    • Proceedings of the Korean Society of Tribologists and Lubrication Engineers Conference
    • /
    • 2003.11a
    • /
    • pp.229-234
    • /
    • 2003
  • As electrorheological fluid(ER fluid) has a characteristic that apparent viscosity varies when electric field applied, so rheological characteristic(yield stress & viscosity) changes in proportion to the electric field applied and the response time is very short within a few miliseconds . In case of using ER fluid for journal bearing as lubricant, it is estimated that it's possible to realize very effective journal bearing system that is not complicate and has a very quick response time. It is necessary to examine the influence of rheological characteristic that varies with electric field applied on bearing characteristic to apply ER fluid to journal bearing, however there are few studies for about that. As for the journal bearing, it comes under high shear flow mode that has shear rate range of $10^3\~10^4s^{-1}$ because rotational speed is very high and clearance is small. But most of the studies for about ER fluid issued until now is about the range of $10\~10^2s^{-1}$. So, there are a lot of difficulties to understand the characteristic offish shear flow mode and furthermore it is restricted to make an experiment for about the characteristic of ER fluid because of the limitation of experimental equipment. The equipment was prepared to make an experiment lot high shear flow mode that has the range of $10^3\~10^4s^{-1}$ using ER fluid that is composed of silicon oil with dispersed particle of starch. Using the above system, the fluid characteristic of ER fluid was studied.

  • PDF

A Study of Demonstration Procedure for Onboard Ship Equipment (선내 장비 실선시험을 위한 절차연구)

  • Hyoseung Kim;Geonhong Kim;Seojeong Lee
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2022.06a
    • /
    • pp.218-219
    • /
    • 2022
  • The Korea Institute for Advancement of Technology and the Ulsan ICT Promotion Agency are building an electric smart ship using a full range of ICT with advanced technology, and are expected to demonstrate it in 2022. For the demonstration of onboard ship equipment, it needs to develop a demonstration procedure. There are 4 types of onboard equipment preferentially selected for the development of the demonstration test procedure which are an electronic chart display and information system, a ship RADAR system, a voyage data recorder, and a ship energy efficiency monitoring system. This paper describes the demonstration procedure based on the equipment standard for the electronic chart display and information system among 4 selected types of demonstration equipment, and also the verification test checklist and template is introduced.

  • PDF

Predictive Maintenance System using Condition Monitoring System of Hydro-turbine Generator (수차발전기 상태진단시스템을 이용한 예지보전체계)

  • Kim, Eung-Tae;Ko, Sung-Ho;Kim, Hyun;Jeong, Yong-Chae;Choi, Seong-Pil
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2007.05a
    • /
    • pp.453-456
    • /
    • 2007
  • The purpose of this study is to explain the importance of Vibration Monitoring Device by introducing an example of Predictive Maintenance System using Condition Monitoring System of Hydro-turbine generator. Confirming vibration of generation equipment is commissioning procedure during equipment completion for checking guaranteed items. Data from Generator output range are used to determine output band to continue the performance of equipment. The Vibration Monitoring System is not absolute method of maintenance, but if it is used well with expert, it will be visible, data-analyzed, scientific maintenance more than others. And also, Condition Monitoring System is very important for remote controlled small hydro-power plant although most of it is installed in Large hydro-power plant.

  • PDF

Development of Watt-Hour Meter Exchange Equipment without Outage (전력량계 무정전 교체장치 개발에 관한 연구)

  • Jung, Tae-Hoon;Cho, Sung-Min;Shin, Hee-Sang;Lee, Hee-Tae;Kim, Jae-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.23 no.8
    • /
    • pp.99-103
    • /
    • 2009
  • This paper presents equipment that can exchange watt-hour meters without outage for customers, It is simpler than other methods to avoid outage during exchange. Furthermore, it has protective function to ensure customer's facility from engineer mistake. Because of good point mentioned above, it can improve efficiency and safety. Adopting developed equipment can ensure continuous electric power supply to customers.

Predictive Maintenance System using Condition Monitoring System of Hydro-turbine Generator (수차발전기 상태진단시스템을 이용한 예지보전체계)

  • Kim, Eung-Tae;Ko, Sung-Ho;Kim, Hyun;Jeong, Yong-Chae;Choi, Seong-Pil
    • 유체기계공업학회:학술대회논문집
    • /
    • 2006.08a
    • /
    • pp.57-60
    • /
    • 2006
  • The purpose of this study is to explain the importance of Vibration Monitoring Device by introducing an example of Predictive Maintenance System using Condition Monitoring System of Hydro-turbine generator. Confirming vibration of generation equipment is commissioning procedure during equipment completion for checking guaranteed items. Data from Generator output range are used to determine output band to continue the performance of equipment. The Vibration Monitoring System is not absolute method of maintenance, but if it is used well with expert, it will be visible, data-analyzed, scientific maintenance more than others. And also, Condition Monitoring System is very important for remote controlled small hydro-power plant although most of it is installed in Large hydro-power plant.

  • PDF

Report on Predictive Maintenance System using Condition Monitoring System of Hydro-turbine Generator (수차발전기 상태진단시스템을 이용한 예지보전체계 사례)

  • Ko, Sung-Ho;Jeong, Yong-Chae;Choi, Seong-Pil;Kwack, Young-Kyun;Han, Seung-Yeul
    • The KSFM Journal of Fluid Machinery
    • /
    • v.13 no.1
    • /
    • pp.29-34
    • /
    • 2010
  • The purpose of this study is to explain the importance of Vibration Monitoring Device by introducing an example of Predictive Maintenance System using Condition Monitoring System of Hydro-turbine generator. Confirming vibration of generation equipment is commissioning procedure during equipment completion for checking guaranteed items. Data from Generator output range are used to determine output band to continue the performance of equipment. The Vibration Monitoring System is not absolute method of maintenance, but if it is used well with expert, it will be visible, data-analyzed, scientific maintenance more than others. And also, Condition Monitoring System is very important for remote controlled small hydro-power plant although most of it is installed in Large hydro-power plant.