• Title/Summary/Keyword: Electric IT Equipment

Search Result 613, Processing Time 0.038 seconds

Diagnosis of a trouble existence and development of prediction method for electrical equipment inside a building (건축물 내 전기설비 이상 유무 진단 및 예측기법 개발)

  • Kim, Young-Dal;Kim, Hyo-Jin;Kim, Dae-Sik;Kim, Jae-Hoon;Han, Sang-Ok
    • Proceedings of the KIEE Conference
    • /
    • 2005.07e
    • /
    • pp.31-33
    • /
    • 2005
  • The accelerating of industrial development causes electricity demand to increase. By that power equipments need high power, multi function and intelligence. Also consumers demand for guarantee power supplying of good quality and reasonable operating equipment. Also they require for reliance and stabilization of power facility. Therefore preventive maintenance of electric installation must be developed and improvement of domestic technical level is needed in the maintenance management of equipment. The diagnosis of trouble existence is technique that compares steady state with unusual condition, whereas the prediction technique makes a diagnosis of remaining equipments life. It is difficult for us to diagnose trouble existence of electric installation and to develop prediction method in building because of a wide scope for electric installation in building. And in this paper we will investigate diagnosis and prediction method for only switch part of electric installation in building.

  • PDF

Frequency-Time Analysis(Partition-FFT) for Tracking Detection (트래킹 검출을 위한 주파수-시간 분석(분할-FFT))

  • Jee S. W.;Lee S. H.;Kim Ch. N.;Lee C. H.;Lee K. S.
    • The Transactions of the Korean Institute of Electrical Engineers C
    • /
    • v.53 no.10
    • /
    • pp.530-538
    • /
    • 2004
  • A electromagnetic waves are used for sensing in insulation diagnosis at electric machine or equipment. When it a method, waves are transformed into the FFT(Fast Fourier Transform); a kind of the process for data transformation. In a general way, a scientist use frequncy band 30[㎒]~l[㎓] to applied field. If we are measured high frequency band, we will need to a high capacity hardware. Also a antenna has a fault on atmospheric phenomena, outside environment and the like. In this paper We proposed new method for detecting electric equipment faulty state using only electric voltage which is generally measured in the electric and electronic field. It is called the Partition-FFT The analytic method is this first divide measured voltage waves into equal parts, second each deal with give effect to the FFT, finally each results deal with a graphic method and gather graphic. We are compare Partition-FFT with discharge form by tracking tester. As the result it demonstrated that the Partition-FFT is applicable.

Development and Simulation Verification of Operation System for Mobile ESS Test Equipment (ESS 이동형 시험장비용 운영시스템의 개발과 모의검증)

  • Shin, Je-Seok;Han, Hyun-Gyu;Kim, Jin-Tae;Lee, Seung-Min;Park, Chan-Wook;Lim, Geon-Pyo
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.67 no.3
    • /
    • pp.168-174
    • /
    • 2018
  • The performance test for 376MW ESS for frequency regulation currently operating in 13 substations is conducted based on the test procedure in the first and second steps. In the first step, components of ESS is moved to the certification authority where the test equipment is located in order to be proceeded with the test. In the second step, the performance test is conducted manually for the ESS equipments installed on site using the movable measurement equipment, and thus it can only be performed on some limited test items and requires a lot of time and manpower. Therefore, mobile test equipment for ESS(MOTES) is being developed that can perform automatically more test items for ESS in the field using the MOTES, and reduce manpower and time. To do this, an algorithm and a prototype of the operating system(MOS) are also being developed that can control MOTES automatically. In this paper, a development of the MOS prototype is introduced and then a simulation is performed to verify the prototype and its algorithm before the field demonstration.

Safety Schematic Diagram and Sequence of Heater in FPD Wet Equipment (FPD 장비 습식공정에서의 안전한 히터 공급 계통도 및 제어 회로)

  • Yoo, Heung-Ryol;Son, Yung-Deug
    • Journal of IKEEE
    • /
    • v.23 no.1
    • /
    • pp.107-111
    • /
    • 2019
  • In FPD WET equipment, heaters are used a lot. There are many electric accidents caused by short circuit and overheating due to the use of heater, so it is necessary to have a safe electric system and interlock. Therefore, in this paper, we propose an electrical schematic and interlock for FPD WET equipment. In this paper, a hardware interlock such as a level sensor, an overheat protector, and an SSR heater sink is inserted, and the electric system is composed of ELB - MC - SSR - EOCR - heater. When the interlock occurs, the magnetic contactor (MC) is turned off and the power of the heater is cut off.EOCR, an electric overcurrent protection device, has an interlock to shut down the MC when there is an abnormality in the heater while checking the overcurrent, undercurrent and disconnection. These circuit configurations and interlocks are likely to be useful not only for WET equipment but also for any equipment in which the heater is placed.

A Preliminary Study on the Electric Corrosion at Electrified Railroad (지하전철구간 전기부식 특성에 관한 기초연구)

  • Lee Cheul-Kyu;Jung Woo-sung;Lee Duck-Hee
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.151-156
    • /
    • 2004
  • Although insulation equipment is installed, it is inevitable to avoid the stray current because rail is the return way of the direct current that is power of electric motor car. In this paper, by the investigation of the present state of underground facilities, and looking into the reason of electric corrosion, and analysis of corrosion accident cases of inside and outside of the country, fundamental data, to reduce of stray current and to prevent electric corrosion, were accumulated to enhance the safety of railway operation service.

  • PDF

A Study on the Establishment of Preventive Measures for Electric Fires Using the 4M Technique (4M 기법을 활용한 전기화재 예방대책 수립 연구)

  • Oh, Teakhum;Park, Chanseok
    • Journal of the Korea Safety Management & Science
    • /
    • v.23 no.4
    • /
    • pp.23-29
    • /
    • 2021
  • The purpose of this study is to reduce the probability of occurrence of electric fires as a preemptive preventive measure, and to strengthen the capability of preventing electric fires by strengthening the cooperative function between electric fire-related departments and establishing a cooperative system. In this study, the general aspects of electric fires were identified by reviewing the literature such as ignition mechanisms of electric fires. And the major electrical fires that occurred in the last 10 years were classified into ignition factors (short circuit, overload/overcurrent, and earth leakage/ground fault) and ignition sources (wiring/wiring appliances, electrical equipment/household appliances). And the 4M technique was used to analyze the potential causes of ignition at the fire site and to suggest preventive measures. In the case In this study, out of 48 electrical fires in the past 10 years, 16 short-circuit fires, 3 overload/overcurrent fires, 3 short-circuit and earth fault fires, 16 fires in wiring/wiring appliances, and 10 fires in electrical equipment/home appliances classified as cases. And prevention measures were presented in terms of human, machine, media, and management by using the 4M technique. For the preemptive prevention of electric fires, strengthening the compulsory electrical safety inspection and making it mandatory to report when new or expanding electric facilities, charging a fee for electric safety inspection for detached houses and granting benefits subject to inspection completion, improvement of the electric safety voluntary inspection table and safety indications; It was suggested as a policy to organize and operate electrical safety inspection personnel in a two-person team (mixed), establish a close work cooperation system with related organizations, and strengthen electrical safety education and publicity.

A Study on Development of Signal Conditioner for Test of Automatic Control Equipments in Hydro Power Plant (수력발전소 자동제어설비 시험용 신호변환장치 개발에 관한 연구)

  • Byun, Doo-Gyoon;Chang, Moon-Soung;Kim, Ju-Hyeon
    • Proceedings of the KIEE Conference
    • /
    • 1995.11a
    • /
    • pp.169-171
    • /
    • 1995
  • Automatic control equipment in hydro power plant, such as turbine governor or automatic voltage regulator have to act promptly against for variation of power system, so it is necessary to check and test continuously. During last five years, the performance test of automatic control equipment was performed about 20 units of hydro turbine generator. In this process, because it has complex connection and before calibration, signal conditioner was developed as an auxiliary equipment for performance test. It includes function of signal amplifier, transducer, and meters. As a result of use this equipment for electric governor test at soyang-gang hydro power plant, it was possible to find output data equal to old one.

  • PDF

Analysis of Insulation Resistance Change according to the Installation Environment of Food Manufacturing Electrical Equipment (식료품 제조업 전기설비의 설치환경에 따른 절연저항 변화 분석)

  • Youn Su Jeong;Doo-Hyun Kim;Sung-Chul Kim
    • Journal of the Korean Society of Safety
    • /
    • v.38 no.1
    • /
    • pp.34-41
    • /
    • 2023
  • In this study, S food manufacturing business located in Chungbuk was selected as the subject, and the transition in insulation resistance in major electrical equipment used in this food manufacturing business was analyzed for 4 years (2018-2021). It was confirmed that the insulation resistance decreased over time for all 18 electrical facilities. Insulation resistance changed due to environmental influences such as load characteristics and ambient temperature. Particularly in the case of the food manufacturing industry, it was confirmed that the decrease started after 2 years, although it varied depending on equipment and environmental influences. Furthermore, it was confirmed that management through predicting the management cycle of electrical equipment is possible by deriving a regression equation through regression analysis of insulation resistance measurement values.

Development of Carbody Structure for Freight Electric Locomotives (화물전기기관차 차체개발)

  • Choi, Won-Ho;Kwak, Tea-Ho;Kim, Ku-Sik
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2635-2643
    • /
    • 2011
  • Current freight electric locomotives (132 ton) of the eco-friendly and can carry large cargo logistics as a means of generation has increased the demand at home and abroad. Especially, Freight electric locomotives to increase the traction, it is easy to mass and rapid transport. In addition, Freight electric locomotives is no exhaust and low noise compared to diesel -electric locomotives and it can be eco-friendly transportation. CO_CO BOGIE of Freight electric locomotives has no the center pivot and Traction_Rod and Spring of CO_CO BOGIE is mounted on the body. These freight electric locomotives to be satisfied with the safety regulations. Carbody development satisfied Implementation of optimum body and collision is the focus. Accordingly, the different approach in the upper and lower carbody structure and interior and equipment placement is needed. On this paper, the contents give explanation of cases on carbody design composed of freight electric locomotives now developed and process of improvement by structure analysis and collision analysis.

  • PDF

RCM Based Failure-Prediction System for Equipment (RCM 기반 설비 고장 예측시스템)

  • Song, Gee-Wook;Kim, Bum-Shin;Choi, Woo-Sung
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.34 no.9
    • /
    • pp.1281-1286
    • /
    • 2010
  • Power plants have many components and equipment. It is difficult for operators to know the time of failure or the equipment that fails. Plants incur heavy economic losses due to unexpected failure. The equipment in power plants is constantly monitored by various sensors and instruments. However, prevention of failure is very difficult. Therefore, engineers are developing many types of failure-alarm systems that can detect the abnormal functioning of equipment. Such failure-alarm systems inform only about the abnormal functioning of equipment and do not indicate the cause of failure or the parts that have failed. In this study, we have developed a failure-prediction system that can provide details on the cause of trouble and the maintenance method.