무기체계 연구개발 사업에서의 사업성과관리 적용 이슈 및 고려사항 (Earned Value Management Application Issues and Consideration for Weapon System Development Project)

  • 국승학;김윤희;김용신;유이주
    • 시스템엔지니어링학술지
    • /
    • 제11권1호
    • /
    • pp.41-48
    • /
    • 2015
  • It is generally recommended to use EVM as an efficient means for measuring project performance and progress so that the EVMS user could manage his project successfully. In spite of it's favorable intention, most project participants think it as a heavy load or a sub practiced job with low responsibility. Especially in a weapon system R&D project, the manager should consider a possibility to change plans in the middle of the project because of uncertainty coming from properties of the R&D project. Even though there are lots of variables triggering unpredictable troubles in EVM application, EVM still could be a valuable project health indicator. In this paper we introduce a case study of EVM application for weapon system development project. Furthermore, we suggest several solutions for the issues occurring in utilizing EVM.

CONSTRUCTION MATERIAL MANAGEMENT USING SMART MOBILE COMPUTING

  • Kwang-Pyo Lee;Hyun-Soo Lee;Moonseo Park
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.221-228
    • /
    • 2011
  • As construction works have become larger and more complex, improving productivity by introducing Information Technology (IT) is pursued and more effective construction management is needed in construction industry. In this circumstance, many different kinds of project management system is being introduced, and various IT technologies are applied such as Personal Digital Assistant (PDA), Bar Code, Radio Frequency Identification (RFID), Web Camera, and so on. However, these kinds of technologies might cause re-processing of information and ineffectiveness of project because of lack of real time information processing technology or separation between construction sites and management offices. Meanwhile, these technologies rather decrease the construction productivity except for the data saving and database function. Therefore, this research aims to develop Application that can be applied efficiently for construction material management, by understanding problems of former management system with questionnaires and extracting functions with analysis of requirements. In virtue of the construction material management Application which will be developed in this study, it will be possible to input information automatically, to process and check material information in real time, and to identify the location of necessary material. Then, the problem of separation between construction sites and management offices are solved, and as a result, more efficient management of materials in construction sites will become possible. At the same time, this study will investigate the possibility and applicability of new IT device, Smart Phone to construction sites.

  • PDF

가상 함정획득사업의 Systems Engineering 적용 (INCOSE SE Handbook ver. 3.1 중심으로) (Systems Engineering Application of Imaginary WIG(Wing-In-Ground Effect) Ship Acquisition Project)

  • 이수억;신승천;최낙준
    • 시스템엔지니어링학술지
    • /
    • 제5권1호
    • /
    • pp.57-65
    • /
    • 2009
  • The purpose of Defense Acquisition Project is that the superior weapons validated needs and performance are supplied to military user with limited financial resources and time. The Warship Acquisition Project is not only like this, But also has special characteristics of long project period and first-constructed ship's operation employment. So, The Warship Acquisition Project need systematic and efficient procedure & management. And this paper researches System engineering application of imaginary WIG(Wing-In-Ground Effect) ship acquisition project based Systems Engineering Handbook ver.3.1 published by INCOSE, the lead of field. The Imaginary WIG(Wing-In-Ground Effect) ship acquisition project applied the four processes(technical project, Enterprise & Agreement, Enabling Systems), the basis of INCOSE Engineering Handbook ver.3.1, and the each process output compared with DAPA(Defense Acquisition Program Administration)'s warship acquisition procedure.

  • PDF

건설분야 전자매뉴얼의 프레임워크 및 데이터베이스 구축 방안 (A Sheme of the Database and System Framework for Construction IETM(Interactive Electronic Technical Manual))

  • 강성훈;박문서;이현수;지세현
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.340-343
    • /
    • 2008
  • 최근 국내 외의 건설업은 대형화 복잡화 되어 메가 프로젝트의 성격을 보인다. 메가 프로젝트는 단순 합의 개념으로는 추구할 수 없는 복합적이고 상호 조율된 가치를 추구하므로, 프로젝트 관리의 관점이 아닌 프로그램 관리 관점에서의 접근이 필요하다. 프로그램 관리는 '종합사업관리'로 볼 수 있으며, 효율적으로 프로그램 관리를 위해서는 종합적인 관점에서 신속하게 의사결정을 지원해야 한다. 그러나 기존의 업무 지원 방법으로는 이를 해결 할 수 없기 때문에 의사결정을 지원해줄 수 있는 도구가 필요하며, 전자매뉴얼이 이 역할을 해줄 것으로 기대된다. 그러나 이러한 장점에도 불구하고 시방서 및 법률 등의 시스템 외부 정보들의 변동성으로 인해서 전자매뉴얼에 대한 연구는 미비한 실정이었다. 그러므로 본 논문은 시스템 외부 정보들과 상호 호환될 수 있는 전자매뉴얼 개발에 대한 연구의 일환으로, 사업수행 과정 분석 결과를 반영한 시스템 프레임을 제시하고 이를 바탕으로 데이터베이스를 구축함으로써 건설분야 전자매뉴얼의 국내 도입에 일조 하고자 한다.

  • PDF

CONSTRUCTION PROJECT CLAIM MANAGEMENT

  • M. ASLAM MIRZA
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.160-168
    • /
    • 2007
  • Conflicts of interest and independent agenda of the parties brought together for implementation of a construction project often leads to dispute in Contract and claim situations. Construction Industry is notorious for claim that is managed on its arising and there lacks an endeavor to minimize the breeding grounds through efficient planning and alignment to purpose, of all contract-documents. There failure of a concerted effort entails wastage of resources, delayed completion of facilities and stained relationships of parties when collide in mistrust in contract to win over the other. There needs a focus on the claim breeding issue and establish an effective mechanism to deal with disputes in urgency. Claim occurs mostly during the construction phase. But the seeds of claim and nutrients essential for development are contained in the contract documentation and the information supplied or not in pre-contract phase. Opportunity to prevent nutrients for seed of Claim comes to an end once tender-documents are finalized, the contract is awarded and established or not a mechanism for dealing with claim situation. The processes presented here would help in minimizing the breeding grounds and emergence of disputes during progression of works and dealing with eventualities in forceful manners for finding a resolution most effectively in relevant time.

  • PDF

공종분류체계를 활용한 도시철도 시설물 유지관리시스템 개발 (The Development of Urban Metro Maintenance Facility System Using Construction Classification System Management)

  • 현지훈;양병수;문성우
    • 한국건설관리학회논문집
    • /
    • 제13권4호
    • /
    • pp.69-77
    • /
    • 2012
  • 건설정보를 효과적으로 관리하기 위해서는 데이터 생성부터 유지관리까지 전 과정을 관리해야 한다. 그러나 사업관리정보시스템 (PMIS, Project Management Information System)은 설계를 포함하여 시공단계에서 사업관리를 중심으로 운영하고 있어서 유지관리와의 연계가 부족하다. 본 논문에서는 유지관리분류와 도시철도시설물 공종분류를 활용하여 시공단계에서 발생하는 데이터를 유지관리 활동에 활용하는 프로세스를 제시한다. 유지관리분류와 공종분류를 연계함으로써 시공정보와 유지관리정보를 일괄적으로 추적할 수 있으며, 유지관리 시 필요한 시공정보를 손쉽게 활용할 수 있다. 또한 사업관리정보시스템과 유지관리정보시스템(MMIS, Maintenance Management Information System)을 연동할 수 있으며, 시공정보를 건설사업의 라이프싸이클 정보를 관리할 수 있게 하여 생애비용을 추적관리 할 수 있도록 돕는다. 본 논문에서는 유지관리정보시스템 프로토타입을 개발했으며, 업무적용 시 타당성이 있음을 보여줬다.

IMPROVING CONSTRUCTION PROJECT DELIVERY THROUGH AUTOMATION AND ROBOTICS

  • Jasper Mbachu
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.237-241
    • /
    • 2009
  • Automation and robotic technology (ART) has been successfully applied in the manufacturing and allied industries to achieve on-time delivery of quality products at increasingly reduced costs. Meeting time, quality and cost targets still remains a big challenge in the global construction industry with prevalence of time and cost overruns. Application of ART in the construction industry could contribute to significant improvement in the efficient and effective delivery of projects to meet and exceed client expectations. However, the uptake of ART is still low in the construction industry. This study investigates the various ways in which ART could be applied to improve construction project delivery, potential areas of applications, and constraints to the uptake of the technology in the construction industry. Recommendations are made for improving the uptake of ART in the construction industry.

  • PDF

MECHANICAL DESIGN APPROACH FOR THE VIRTUAL MOCK-UP STUDY OF BUILDING ENVELOPE DESIGN AND FABRICATION

  • Minjung M.;Yongcheol L.
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.158-162
    • /
    • 2013
  • Building envelope systems with growing complexity in geometry and performance criteria demand adapted workflow processes toward the efficient integration of their design and fabrication. To facilitate integration of the workflow process, this study analyzes relationships among teams who share digital models and exchange information that help project participants identify areas of improvement in task allocation and exchanges among various actors, systems, and activities. In addition, major gaps identified in knowledge transfer, project tracking, and design integration during the performance evaluation stages, emphasize the need for a more comprehensive approach to integrating the design, the fabrication, and the construction parameters of building envelope systems. To evaluate the effectiveness of streamlining interactions of design parameters with fabrication constraints and constructability assessments, this paper examines a mechanical design approach as it applies to various project scenarios to develop a mechanical solution for streamlining building envelope design and construction workflow.

  • PDF

DEVELOPMENT OF AN INTEGRATED MODEL OF 3D CAD OBJECT AND AUTOMATIC SCHEDULING PROCESS

  • Je-Seung Ryu;Kyung-Hwan Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1468-1473
    • /
    • 2009
  • Efficient communication of construction information has been critical for successful project performance. Building Information Modeling (BIM) has appeared as a tool for efficient communication. Through 3D CAD objects, it is possible to check interception and collisions of each object in advance. In addition, 4D simulation based on 3D objects integrated with time information makes it realize to go over scheduling and to perceive potential errors in scheduling. However, current scheduling simulation is still at a stage of animation due to manual integration of 3D objects and scheduling data. Accordingly, this study aims to develop an integrated model of 3D CAD objects that automatically creates scheduling information.

  • PDF

The Study on Project Information Management System for the Efficient Project Management of Commercialization-Linked Technology Development

  • Kim, Chang-Su;Jang, Bong-Im
    • Journal of information and communication convergence engineering
    • /
    • 제9권5호
    • /
    • pp.597-601
    • /
    • 2011
  • As researches of on scientific technology are considered as a pivotal factor of a national competitiveness, the central and local governments have extended assistance for commercialization-linked technology development (CLTD) and accordingly various outputs are coming out now. However, the valuable findings from painstaking researches are not sufficiently distributed to or shared with other governmental and public organizations, and businesses. As a result, it could be possible for them to become unknown and unused. Therefore, it is being sensed that a measure to coordinately and systematically manage the information and outputs derived from the research projects is urgently needed. Hence, this study designs PIMS to manage CLTD efficiently and transparently.