A PATH ENUMERATION APPROACH FOR CRITICAL ANALYSIS IN PROJECT NETWORKS WITH FUZZY ACTIVITY DURATIONS

  • Siamak Haji Yakchali
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.575-581
    • /
    • 2011
  • A novel approach for analysis of criticality with respect to path and to activity in networks with fuzzy activity durations is proposed. After recalling the Yager ranking method, the relative degree of criticality of activities and paths are defined. An efficient algorithm based on path enumeration to compute the relative degree of criticality of activities and paths in networks with fuzzy durations is proposed. Examples of former researches are employed to validate the proposed approach. The proposed algorithm has been tested on real world project networks and experimental results have shown that the algorithm can calculate the relative degree of criticality of activities and paths in a reasonable time.

  • PDF

PROCESS RESEARCH FOR DEVELOPMENT OF STRUCTURAL COST ESTIMATING MODEL BASED QUANTITY - FOCUSED ON PUBLIC OFFICE BUILDING PROJECT -

  • Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1170-1175
    • /
    • 2009
  • When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.

  • PDF

Analysis of Data and Information Flow for Pipeline in Permafrost Area

  • Won, Seo-Kyung;Lee, Do-Yun;Lee, Junbok
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.744-745
    • /
    • 2015
  • Since the G20 summit in 2011, South Korea who was dependent on foreign energy needs of 97% receives natural gas from Russia from 2015 to 30 years, but South Korea is a situation of scarce experience and skills of pipeline project in permafrost area. In this study, we kept the target for analyzing the data and information flow of the pipeline projects in permafrost area, and the ultimate goal is set to developing the hierarchy structure of design and construction data for an efficient administration of the project. In order to develop that structure, Configuration Management was introduced and through this method, it is expected to be used to build the overall information management system in O&M phase.

  • PDF

A Study of Improving Project Management and Supervision Cost Estimation of Intelligent Transport Systems (ITS 사업관리 및 감리 대가기준 개선방안에 대한 연구)

  • Byun, Sang-Cheal;Lim, Sung-Han;Heo, Tae-Young
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.16 no.5
    • /
    • pp.197-205
    • /
    • 2011
  • Since Intelligent Transport Systems(ITS) is a complex project combining technology and system of transportation, information and communication and civil engineer, it needs a specialized management activities. However, it is difficult to judge who has responsibility for a shoddy and fault construction since the role between project management and supervision is very ambiguous. The aim of this study is propose an efficient project management and supervision for ITS reflecting the characteristics of ITS. Therefore, we suggest a statistical models using nonlinear regression model to prepare the project management and supervision compensation criteria, hence, we choose the realistic and validation statistical model.

A Study on the Methodology of U-City Services Standardization (신도시 U-City 서비스 표준화 방법론에 관한 연구)

  • Lee, Sang Hun;Yang, Dong Suk
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.8 no.4
    • /
    • pp.53-62
    • /
    • 2012
  • U-City means the high-tech city that applied ubiquitous technology and information communication technology. U-City aims to intensify urban competitiveness and to improve the quality of residents' life through efficient management of the urban. Currently, 77 U-City projects is underway. The each project cost and scale estimate is not clear in the absence of the U-Service Standardization Model. So, many of the project are trouble about making a production the proper number of U-Service or the cost of project. The excessive service construction is reflected on the construction costs, which leads to the rise of sales price and passes onto the executor of a project as a burden of the project costs, and the problem of the delay of the change-over occurs due to supporting the operation costs for the operation of the constructed service and the demand for additional installation of facilities between a local autonomous entity and the executor of a project. In this paper, we suggested the U-Services Construction Standardization Methods and proposed the standardization services guideline of crime prevention services. U-City services in the future are able to maintain the consistency of the system through the utilization of the proposed standard model. As a result, the U-City project's pre-estimated cost and scale can be extracted.

A Study on The Management of A Building by Applying RFID/USN (RFID/USN의 적용을 통한 건축물 관리 방안)

  • Ju, Hyun-Tae;Kim, Kyung-Hwan;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.331-336
    • /
    • 2007
  • The importance of a building management is embossed at construction industry and the concernment about a lengthening longevity and a efficient management of construction project is concentrated. At present, a study about maintenance management of existing building is progressed and normal papers concentrate in partial construction project for showing management method. This paper proposes Management method that make use of RFID/USN at the whole course of construction project that is composed plan, design, supply, construction, operation, maintenance management and so on. First of all, this paper analyzes process and applicable scope of RFID/USN at construction project. At each step, use scope, location, method and so on are decided at plan, design step and equipment, human power, materials and so on are established at supply step. real time progress, human power, safety, material, equipment management and so on put in operation at construction step and building is managemented real time by established sensor tag and wireless sensor network. This paper want to helps efficient project progress and management and presents convenience of maintenance management.

  • PDF

Groundwater use management using existing wells to cope with drought

  • Amos, Agossou;Yang, Jeong-Seok
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.450-450
    • /
    • 2022
  • The study aims to develop scenarios for efficient groundwater use using existing wells in order to prepare for an eventual drought. In the recent decades, droughts are not only intensifying, but they are also spreading into territories where droughts used to be less intense and relatively infrequent. With the increasing disaster, efficient groundwater use is urgently needed not only to prevent the problem of groundwater depletion but also drought risk reduction. Thus, the research addressed the problem of efficient aquifer use as source of water during drought and emergencies. The research focused on well network system applied to Yanggok-ri in Korea using simulation models in visual MODFLOW. The approach consists to variate groundwater pumping rate in the most important wells used for irrigation across the study area and evaluate the pumping effect on water level fluctuation. From the evaluation, the pumping period, appropriate pumping rate of each well and the most vulnerable wells are determined for a better groundwater management. The project results divide the study area into two different regions (A and B), where the wells in the region A (western part of the region) show a crucial drop in water level from May to early July and in august as consequence of water pumping. While wells in region B are also showing a drawdown in groundwater level but relatively less compare to region A. The project suggests a scenarios of wells which should operate considering water demand, groundwater level depletion and daily pumping rate. Well Network System in relevant project, by pumping in another well where water is more abundant and keep the fixed storage in region A, is a measure to improve preparedness to reduce eventual disaster. The improving preparedness measure from the project, indicates its implication to better groundwater management.

  • PDF

Estimating Maintenance Cost by Actual Database Based on Operation in Sewage Treatment Plant (하수처리장 실적데이터베이스를 활용한 유지관리비용 예측)

  • Lee, Tai-Sik;Kwak, Dong-Koo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.10
    • /
    • pp.2803-2809
    • /
    • 2009
  • For a successful construction project not only construction engineering and project management technology but also economic evaluation technique is required. Design and construction technologies are necessary to receive a project order. However, construction management technology which can be apply from the project initial phase to the project operation and management phase is required to create a benefit from the project. Construction management technology is one of the effective factors for project success. Economical and efficient cost management from the planning phase influences the project success. This study investigated cost flow and cost factors of domestic Sewage Treatment Plant project for systematic analysis of cost items following the entire project phase. Particularly, data modeling based on domestic Sewage Treatment Equipment maintenance cost DB was performed, and maintenance cost estimation trend line is suggested using Monte carlo Simulation Method to decrease uncertainty of actual results DB and for feasibility study. Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society. The Korea Academia-Industrial cooperation Society.

An Analysis of Region Industry Total Information System (지역산업종합정보망 구축현황 분석)

  • Oh, Han-Seok
    • Journal of the Korean BIBLIA Society for library and Information Science
    • /
    • v.22 no.1
    • /
    • pp.231-246
    • /
    • 2011
  • National R&D project management agencies have promoted continuous investment and development to provide efficient information such as collection and analysis of industry and technology information and research trend information, and development of user oriented information system. This research analyzes Region Industry Total Information System status to manage regional R&D and suggests methods for regional industry project management. This paper may contribute to the advancement of efficient information management system though research method.

A Study on the Improvement of Construction Progress Management for EVMS (공정-원가 통합관리를 위한 진도관리 개선 방안)

  • Lee, Kyoo-Hyun;Park, Chan-Jung;Choi, In-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.3
    • /
    • pp.155-162
    • /
    • 2002
  • The Ministry of Construction-Transportation released a plan about EVMS in 1993 in order to prepare measures for an efficient public construction project, and prepared an enforcement proposal concretely in June for 2000 years, and have enforce a public project by an example with a target. Therefore, accurate analysis and evaluation about field progress are required for efficient management of a building construction, and must be established building construction management system for fast action about a problem However, unified management cannot be consisting because a work progress system is different from details estimate system within a country. and There is not still a definite standard in progress measurement for an application of EVMS. A purpose of this study is to present an improvement about a problem of progress measurement for an application of EVMS. The contents of a study, inquired into a progress measurement method and a standard to use in the field of a public construction and private construction and Checks a problem and presented an improvement item necessary for and is as follows. $\circled1$ must establishes a control account and progress measurement standard. $\circled2$ must manage progress in a activity viewpoint. $\circled3$ must use an accurate CPM process management technique.