• Title/Summary/Keyword: Effect of excavation

Search Result 411, Processing Time 0.028 seconds

Suggestion of a Modified RMR based on Effect of RMR Parameters on Tunnel Displacement in Sedimentary Rocks (퇴적암 기반 터널에서의 지질인자별 변위 영향도를 고려한 RMR 수정 제안)

  • Seo, Yong-Seok;Yim, Sung-Bin;Na, Jong-Hwa;Park, Si-Hyun
    • The Journal of Engineering Geology
    • /
    • v.18 no.2
    • /
    • pp.197-205
    • /
    • 2008
  • Total displacement under non-reinforcement is a quantitative index of rock mass behavior during tunnel excavation and depends widely upon geological characteristics. The primary purpose of this study is to suggest a rock mass evaluation method, well representing tunnel behavior during excavation, according to rock type. A 3-D numerical analysis was carried out, with consideration of the shape of tunnel section, excavation condition and so forth, in a sedimentary rock-based tunnel, and total displacements under non-reinforcement according to rock mass class were calculated. Finally, quantification analysis was carried out to assess correlation of the total displacement with RMR parameters. As the result, a modified RMR system fer quantification of rock mass behavior during tunnel excavation is suggested.

Monitoring Rock Physical Property Changes due to Excavations Using Horizontal Crosshole Georadar Tomography (수평 시추공간 지오레이다 토모그래피를 이용한 터널 굴착에 의한 암반 물성 변화의 고찰)

  • Jung, Yun-Moon;Lee, Myung-Sung;Song, Myung-Jun;Woo, Ik
    • Tunnel and Underground Space
    • /
    • v.6 no.4
    • /
    • pp.342-347
    • /
    • 1996
  • The changes of electromagnetic wave velocity in rock were monitored to investigate rock behaviors due to the drill & blasting excavations through georadar tomography during the construction of the underground rock laboratory (5 m wide, 6 m high, and 140 m long) at Mabuk-Ri, Goosung-Myun, Yongin-Si, Kyunggi-Do. Two horizontal boreholes spaced 1.4 m apart were drilled parallel to the test tunnel before excavating it, high-resolution crosshole georadar tomography with about 500 MHz electromagnetic waves was performed at pre-excavation phase (May, 1996) and post-excavation phase (August, 1996). The data were acquired with the combination of 34 sources and 44 receivers with space of 0.3 m. Only 11 continuous receivers were selectively utilized with one fixed source. Sampling interval was 0.4 ns and each trace has 512 samples. The first arrival of each trace was picked manually with a picking software. The total number of rays used in inversion amounted to 34x11 and the size of pixel was determined to be 0.3 m. As an inversion technique, SIRT(Simultaneous Iterative Reconstruction Technique) was applied in this study. The velocity of electromagnetic waves at post-excavation phase decreased as large as 15% in comparison with that at pre-excavation phase, which may be attributed to the creation of micro-cracks in rock due to excavations and saturation with groundwater. Small amount of borehole deviation made a critical effect in radar tomography. Totally different tomograms were created after borehole deviation corrections.

  • PDF

Suggestion of empirical formula between FPI and specific energy through analysis of subsea tunnel excavation data (해저 터널 굴진자료 분석을 통한 FPI와 비에너지의 경험식 제시)

  • Kim, Kyoung-Yul;Bae, Du-San;Jo, Seon-Ah;Ryu, Hee-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.4
    • /
    • pp.687-699
    • /
    • 2018
  • The construction of subsea tunnel differs from that of inland tunnel because of high water pressure due to sea water level and difficulties to reinforce the ground under construction. Therefore, it is very important to prevent trouble in advance when the subsea tunnel is constructed. In this paper, we established lots of databases about characteristics of geological and mechanical parameters on the construction of subsea tunnel using micro slurry TBM which depth is about 60 m. The correlation analysis is conducted to confirm the effect of thrust, torque and RPM among the excavation database on the net penetration rate. Also, An empirical formula is suggested to predict the net penetration rate through the correlation analysis between FPI (Field Penetration Index) and specific energy from the subsea tunnel excavation database.

Evaluation of Track Irregularity Effect due to Adjacent Excavation on Serviced Railway Line (철도시설물 인접굴착공사에 따른 운행선 궤도의 궤도틀림 영향 평가)

  • Choi, Jung-Youl;Park, Dong-Ryong;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.4
    • /
    • pp.401-406
    • /
    • 2019
  • The three-dimensional precision numerical analysis was performed using the finite element model applied with the railway track model consisting of rails, sleepers, and track elastic springs(ballast, rail pad). As a result of analyzing the track deformation level of the existing tracks due to the excavation work adjacent to the railway facilities, it was found that the track irregularity evaluation criteria (allowed values) of both conventional and high-speed railways lines were satisfied. Based on the numerical analysis using the track model, it was analyzed that the results of the prediction of the track irregularity due to the excavation work and the level of the track deformation occurring at the actual site could be approximated as closely as possible.

A Study on the Upper Ground Reinforcement Effect in Underground Cavern (지하공동 상부지층 보강효과에 관한 연구)

  • Kim, Ki Ho;Lim, Jong Se;Jang, Won Yil
    • Tunnel and Underground Space
    • /
    • v.25 no.3
    • /
    • pp.275-283
    • /
    • 2015
  • Excavation of underground space in soft ground implicate to the structure, such as subsidence. As a result, it has been acting as a serious risk to the stability of the roads and facilities. Therefore, in order to stabilize the soil stabilization and reinforcement of the structure, we have been using a number of methods and injecting material. In this study, we compared and analyzed the amount of subsidence regarding the ground reinforcement during underground excavation in soft ground by performing model test. And three-dimensional numerical analysis was performed using FLAC 3D. The subsidence was simulated numerically according to the tunnel excavation. The subsidence results of the model tests and numerical analyzes were relatively consistent. Thus comparing the ground subsidence by varying the reinforcement area on the numerical analysis was analyzed. As a results, three-dimensional numerical simulation could be regarded to simulate better on the ground subsidence by various kinds of underground excavation and it can be used as a material of subsidence prevention methods.

Effect of Rock Mass Condition on the Earth Pressure Against an Excavation Wall in Rock Mass: Numerical Investigation (암반지층 굴착벽체 작용토압에 대한 암반조건의 영향: 수치해석적 조사)

  • Son, Moorak;Adedokun, Solomon
    • Journal of the Korean Geotechnical Society
    • /
    • v.33 no.11
    • /
    • pp.83-95
    • /
    • 2017
  • This study examined the magnitude and distribution of earth pressure on the excavation wall in jointed rock mass by considering different groundwater conditions under various rock types, joint inclination angles, and earth pressure coefficients. Based on a physical model test (Son and Park, 2014), extended studies were conducted considering rock-structure interactions based on the discrete element method, which can consider the joints characteristics of rock mass. The results showed that the earth pressure was highly influenced by the groundwater condition as well as the rock type, joint inclination angle, and earth pressure coefficient. The results were also compared with Peck's earth pressure for soil ground, and clearly showed that the earth pressure in jointed rock mass can be greatly different from that in soil ground.

Groundwater Flow Analysis During Excavation for Underground Tunnel Construction (지하 터널 건설을 위한 굴착 시 지하수 유동 분석)

  • Sungyeol Lee;Wonjin Baek;Jinyoung Kim;Changsung Jeong;Jaemo Kang
    • Journal of the Korean GEO-environmental Society
    • /
    • v.25 no.6
    • /
    • pp.19-24
    • /
    • 2024
  • Urban densification has necessitated the development of subterranean spaces such as subway networks and underground tunnels to facilitate the dispersal and movement of populations. Development of these underground spaces requires excavation from the ground surface, which can induce groundwater flow and potentially lead to ground subsidence and sinkholes, damaging structures. To mitigate these risks, it is essential to model groundwater flow prior to construction, analyze its characteristics, and predict potential groundwater discharge during excavation. In this study, we collected meteorological, topographical, and soil conditions data for the city of ○○, where tunnel construction was planned. Using the Visual MODFLOW program, we modeled the groundwater flow. Excavation sections were set as drainage points to monitor groundwater discharge during the excavation process, and the effectiveness of seepage control measures was assessed. The model was validated by comparing measured groundwater levels with those predicted by the model, yielding a coefficient of determination of 0.87. Our findings indicate that groundwater discharge is most significant at the beginning of the excavation. Additionally, the presence of seepage barriers was found to reduce groundwater discharge by approximately 59%.

A Study on the Restraint Effect on Lateral Displacement of an Inclined Earth Retaining Structure Integrated with Soil Nailing in Sandy Ground (사질토지반에 설치된 소일네일 복합형 IER의 수평변위 억제효과에 관한 연구)

  • Park, Tae-Keon;Im, Jong-Chul;Yoo, Jae-Won;Kim, Chang-Young;Kang, Sang-Kyun;Lee, Woo-Je
    • Journal of the Korean Geotechnical Society
    • /
    • v.33 no.10
    • /
    • pp.33-47
    • /
    • 2017
  • A self-supported temporary excavation method called IER is normally applicable to excavation depth ranging from 6.0 m to 7.0 m though the method depends on ground condition and overburden load. Combining IER with another method is required in deeper excavation depth in order to maintain the structural stability of the IER. In this study, we performed model tests and 3D FE analysis to check the stability of the IER adopting soil nailing method, and to propose its effective installation method. The lateral displacement of the IER using soil nailing decreased by 92% of that of IER without soil nailing. Optimum design is possible for both economic feasibility and stability when interval spacing and length of soil nails is $1.5m(S_h){\times}0.75m(S_v)$ and 86% of excavation depth, respectively. Excavation depth using IER increases 1.71 times by adopting soil nailing in increment of lateral displacement of IER right before the last excavation stage.

Comparative analysis of cutting performance for basalt and granite according to abrasive waterjet parameters (연마재 워터젯 변수에 따른 현무암 및 화강암 절삭성능 비교분석)

  • Park, Jun-Sik;Cha, Hyun-Jong;Jo, Seon-Ah;Jung, Ju-Hwan;Oh, Tae-Min
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.5
    • /
    • pp.395-409
    • /
    • 2022
  • To overcome the limitation of conventional rock excavation methods, the excavation with abrasive waterjet has been actively developed. The abrasive waterjet excavation method has the effect of reducing blasting vibration and enhancing the excavation efficiency by forming a continuous free surface on the rock. However, the waterjet cutting performance varies with rock fracturing characteristics. Thus, it is necessary to analyze the cutting performance for various rocks in order to effectively utilize the waterjet excavation. In this study, cutting experiments with the high pressure waterjet system were performed for basalt and granite specimens. Water pressure, standoff distance, and traverse speed were determined as effective parameters for the abrasive waterjet cutting. The cutting depth and width of basalt specimens were analyzed to compare with granite results. The averaged cutting depth of basalt was shown in 41% deeper than granite; in addition, the averaged cutting width of basalt was formed by 18.5% narrower than granite. The results of this study are expected to be useful basic data for applying rock excavation site with low strength and high porosity such as basalt.

Forecasting and Assessment of the Grouting Effect, using a Numerical Model, to Prevent Groundwater Inflow during Excavation of a Vertical Shaft for a Selective Intake Structure (선택취수설비 굴착시 지하수 유입 방지를 위한 그라우팅 효과의 모델링 예측 및 평가)

  • Kim, Gyoo-Bum;Kim, Wan-Soo;Park, Jung-Hoon;Son, Yeong-Cheol;Kim, Jin-Woo
    • The Journal of Engineering Geology
    • /
    • v.23 no.3
    • /
    • pp.227-234
    • /
    • 2013
  • The vertical shaft of a selective intake structure, which is constructed in a large reservoir, is required to be impermeable and to employ a grouting technology to prevent water inflow from the reservoir or surrounding ground. In this study, groundwater inflow is estimated using a numerical model for two cases (i.e., grouting or non-grouting cases at the exterior of a vertical shaft) and compared with data measured during an excavation at the construction site of a selective intake structure in the Soyang reservoir, Korea. Groundwater inflow is estimated to range from 444 to 754 $m^3/d$ in the case of non-grouting and from 58 to 95 $m^3/d$ in the case of grouting. The groundwater inflow measured in a vertical shaft, which ranges from 30 to 100 $m^3/d$, is similar to the simulated amount. It is recommended that before the excavation of a shaft, water inflow is estimated using a numerical model and a grouting test to ensure excavation stability and improve excavation efficiency.