• Title/Summary/Keyword: Earthworks Quantity

Search Result 3, Processing Time 0.067 seconds

A Study on the Development of the Guidelines for Supervision and Inspection of Earthworks Quantity Using 3D Scanning Technology (3D 스캐닝 기술을 이용한 토공사 기성관리 감독 및 검사 가이드라인 개발)

  • Lee, Young-ho;Yun, Won Gun;Park, Jae-woo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.5
    • /
    • pp.735-746
    • /
    • 2020
  • Recently, in Korea, various technology developments have been made to utilize 3D space and facility data such as unmanned aerial vehicles (UAV) and laser scanners with the goal of improving productivity at construction sites. However, the lack of related regulations for 3D laser scanner surveying has been a barrier to using the technology across the surveying industry. As a result, owners, contractors, and construction supervisors are reluctant to introduce and apply technology to the site. In this study, the guidelines (drafting and inspection work to be supervised by construction supervisors when constructing earthworks using laser scanners) was developed and presented so that the earth surveying and quantity calculation technology using a laser scanner could be applied and diffused in a construction site. Through the development of this guideline (proposal), it is judged that the supervision and inspection of earthworks quantity using a laser scanner will be activated in the field.

A measure for activating BIM by actual application analysis of integrated utilization process of quantity, process(4D), and construction cost(5D) in view of life-cycle

  • Lee, Jae-Hong;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.25 no.12
    • /
    • pp.1-15
    • /
    • 2020
  • In this paper, we propose a novel method for converting the existing 2D processes in the design and construction phase of civil engineering, to the future BIM-based processes. First, we compare and analyze the actual application processes of the outputs of the existing 2D method and the outputs of the 3D BIM method, for the whole process of BIM design of earthworks and road structures and integrated utilization of quantity, process(4D) and construction cost(5D), in view of life-cycle. The proposed method acquire the outputs of the design phase integrating IFC international common standard file information and CBS/OBS/WBS standard classification scheme information, and acquire the outputs of the construction stage by using an integrated utilization module for quantity, process(4D) and construction cost(5D). Ultimately, we intend to commercialize the step by step technologies for BIM design and construction in civil engineering by using the proposed method.

Performance Effectiveness Case Study of the Machine Guidance System for Dozer Eartwrok Grading Work (도저 정지작업 시 머신 가이던스 시스템 적용에 따른 토공성과 향상 사례분석)

  • Moon, Sungwoo;Kim, Sangtae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.78-86
    • /
    • 2020
  • Dozer is an expensive construction equipment and has a significant performance impact on earthwork performance. A machine guidance system has been applied to dozer equipment as a solution that can improve the performance. The system can provide earthwork-related information to equipment operators so that earthworks can be carried out with minimum support from surveyors. Construction Equipment Machine guidance has the function of supporting earthwork according to an earthwork plan by providing excavation-related information to machine operators. The objective of this study is to evaluate the performance improvement of a machine guidance system for an dozer earthwork operation, and to compare the machine guidance method with the traditional method. The performance has been evaluated in two folds: 1) productivity and 2) accuracy. The productivity shows the quantity of earthwork for a given unit time. The accuracy shows the deviation of grading level from the designed level on the construction drawing for earthwork. The machine guidance system has been applied to a testing bed in a construction site. Data comparison analysis showed that the earth earthwork had 46.59% improvement in productivity as well as 46.96% improvement in accuracy, and is expected to provide a tool for applying smart constrction to the earthwork operation.