• Title/Summary/Keyword: Earth-Block

Search Result 182, Processing Time 0.033 seconds

A new species of the primitive stromatoporoid Cystostroma from the Ordovician of East Asia

  • Jeon, Juwan;Li, Qijian;Oh, Jae-Ryong;Choh, Suk-Joo;Lee, Dong-Jin
    • Geosciences Journal
    • /
    • v.23 no.4
    • /
    • pp.547-556
    • /
    • 2019
  • A new species of the most primitive rosenellid stromatoporoid Cystostroma, C. primordia sp. nov. is reported from the Hunghuayuan Formation (Lower Ordovician, Floian) of Guizhou Province in the South China Block and the Duwibong Formation (Middle Ordovician, Darriwilian) of the Taebaeksan Basin in mid-eastern Korea (North China Block). This species is the first representative of the genus found in both the North and South China blocks. Cystostroma primordia sp. nov. is characterized by the absence of denticles and distinctively smaller cyst plates (height 0.04-0.20 mm, length 0.09-0.39 mm) than any other known species of Cystostroma. The presence of C. primordia sp. nov. in Lower to Middle Ordovician strata of western Gondwana challenges the long-held view of the late Middle Ordovician emergence of Paleozoic stromatoporoids. The simple internal morphological features of this new species and its occurrence in the Lower Ordovician of South China strongly indicate that an Early Ordovician Cystostroma-type precursor from western Gondwana is located near the base of the stromatoporoid stock. This occurrence greatly preceded the late Middle Ordovician (late Darriwilian) stromatoporoid diversification in circum-equatorial regions worldwide.

Research on the Load Reduction Effect Using EPS (EPS의 압축성을 이용한 토압저감효과에 관한 연구)

  • 김진만;조삼덕;최봉혁;오세용
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.1
    • /
    • pp.101-108
    • /
    • 2004
  • For the last 30 years, the use of EPS as a lightweight filling material has grown significantly throughout the world. The fields of applying EPS block have also increased. The most representative example in geotechnical applications is using EPS block as a compressible inclusion that causes the reduction of static earth pressure on earth-retaining wall, bridge abutment and pipes. EPS blocks have a good workability by its lightweight characteristic and a uniform engineering property with the change of its density. Also EPS blocks have best material property as a compressible inclusion. This paper analyzes that the compressible inclusion function of EPS causes the reduction of static earth pressure on retaining wall and concrete box culvert. A series of in-situ tests were conducted to evaluate the reduction of static earth pressure using EPS inclusion. Based on in-situ test, it is found that the magnitude of static earth pressure was reduced to about 20% for the retaining wall and about 45∼53% for the box culvert compared with theoretical active earth pressure.

Current State and Technical Development of Geosynthetics-Reinforced Earth Wall (토목섬유 보강토옹벽의 기술현황 및 개발동향)

  • Cho, Sam-Deok;Lee, Kwang-Wu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.141-157
    • /
    • 2008
  • Since 1984, block-type reinforced earth wall with geogrid reinforcement has been widely used for retaining wall applications till now in Korea. The use of geogrid as a reinforcement in the reinforced earth wall is steadily increased in an amount over $6,500,000m^2$ in a year. However, still need exists that some problems in design and construction practices should be made to review. Therefore, this paper reviewed current state and development items of geosynthetics-reinforced earth wall technology on design and construction point of view.

  • PDF

The Development and Application of KOESWall System (분리형 보강토 옹벽의 개발 및 적용사례)

  • 김영윤
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.10a
    • /
    • pp.323-328
    • /
    • 2001
  • In the ordinary reinforced earth wall, which was constructed by incremental construction method, the horizontal deformation of the facing due to the compaction induced horizontal earth pressure was unavoidable. Thus the KOESWall system which are adopted the isolated construction method was developed by I&S Eng. Co., Ltd. in 1999. Due to its systematical feature, KOESWall system is able to minimizes the horizontal deformation of reinforced wall effectively and it can be used as temporary structures more economically without the lacing block. In this report, it is shown that the concept and case histories of KOESWall system as a retaining structures.

  • PDF

Displacement and Earth Pressure Distribution of the Reinforced Soil Segmental Retaining Walls under the Simulated Cyclic Train Loading (모사열차 반복하중 재하에 따른 블록식 보강토 옹벽의 변위 및 토압 분포)

  • 이진욱;고태훈;이성혁;심재훈
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.620-625
    • /
    • 2002
  • In this study, the simulated cyclic train loading test was carried out in order to investigate the dynamic behavior in/at the block type reinforced earth retaining wall. The results in this test were compared with unreinforced and reinforced case, respectively. It was shown that we confirmed the correlation between earth pressure and displacement, the confining effect of wall displacement by the effect of geogrid.

  • PDF

Earth Building Characteristic Analysis to Utilize in Architecture Plan (건축 계획적 활용을 위한 흙건축 특성분석)

  • Lee, jang-hyuk;Hwang, hey-zoo;Kim, Jeong-Gyu
    • KIEAE Journal
    • /
    • v.7 no.4
    • /
    • pp.3-8
    • /
    • 2007
  • This study is aimed to apply basic data to planning earth building through analyzing characteristics of earth building. For doing it, we investigated a research paper in advanced countries(New zealand, Australia, etc.) that has been used for earth building standards for a long time, and then we corrected inadequate standards that would apply our earth building environment. As a result, we can devide earth characteristics into three parts that are materials, plan, and maintenance and repair. First, as material selection is very important factor, a general plan is possible to change in accordance with what material is selected. These methods that made mud brick, pressed earth block, rammed earth, cob have been well used during the current 30 years in earth building. Second, the plan is composed of site select and architecture plan. In architecture plan, we should consider from foundation to eaves protection, and in site selection, consider sides of the environment and the social. Third, we should always check a periodical inspection through watchful observation because earth buildings need more time and efforts in maintaining and repairing than others.

Development of Common Reinforced Concrete Block for Slope Protection (사면보호용(斜面保護用) 범용보강(凡用補强)콘크리트블록의 개발(開發))

  • Ryu, Neung-Hwan
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.404-409
    • /
    • 2005
  • The reinforced concrete blocks for reinforced earth layer are combined with soil structures consisted of facing unit, reinforcing materials and soil. Those environmentally friendly facing units of reinforced concrete blocks are made of mine waste and tailing and that will be played a role of the effects of recycling use of wasted resources. The block are consisted of three types as curved or straight in order to control topography. The systems are also not limited to wall hight so that they are effectively used for protecting the slope of banking and cutting of earth works. The reinforced concrete blocks developed this time will be effectively applied for not only retaining wall, road, park, golf course, public office building constructions but also protecting of slope stabilization projects.

  • PDF

A Case Study on the Discrete Segmental Retaining Wall in Highway Construction (분리형 보강토공법의 고속도로 적용사례)

  • 노한성;최영철
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.10a
    • /
    • pp.337-344
    • /
    • 2001
  • The application of mechanically stabilized earth wall(MSEW) with segmental front panel has been increasing in highway construction due to its cost-effectiveness. However, some failures during construction have been reported and many field engineers are reluctant to select this method for important structure. One of the main reasons may be that there is no moderate specification for design and construction of MSEW yet. This paper discussed the main results of analysis on a case of block-type segmental retaining wall in highway construction. Based on the results, some recommendations on design and construction method of MSEW are presented.

  • PDF

Design of DubaiSAT-1 S-band Receiver RF block (DubaiSAT-1 위성용 S-band 수신기의 RF 블록 설계)

  • Park, In-Yong;Min, Seung-Hyun;Kim, Byung-Jin
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.39 no.2
    • /
    • pp.178-182
    • /
    • 2011
  • A FSK receiver RF block has been developed for Dubaisat-1 Low Earth Orbit satellite. The receiver has Doppler tracking function which compensate frequency shift on uplink channel for commanding the satellite. It consist of LNA, downconverter and IF module. The IF module has Doppler tracking circuitry which sweep and lock on to input signal. It satisfies the requirement of the Dubaisat-1 in mass, power consumption, tracking speed and BER performance.

A Paleomagnetic Study of the Tonggo Formation in Tanyang Area (단양지역에 분포하는 동고층에 대한 고지자기 연구)

  • Doh, Seong-Jae;Park, Yong-Hee;Kim, Ji-Youn
    • Economic and Environmental Geology
    • /
    • v.31 no.1
    • /
    • pp.45-52
    • /
    • 1998
  • Paleomagnetic data have been obtained from the Lower Triassic Tonggo Formation which is exposed in Tanyang area comprising the Pyeongan Supergroup in eastern Korea. Mean characteristic direction of the Tonggo Formation is declination/inclination=$121.4^{\circ}/-26.4^{\circ}$ (k=52.7, ${\alpha}_{95}=7.2^{\circ}$, N=9 Sites) and paleopole at longitude/latitude=$30.7^{\circ}E/33.3^{\circ}N$ ($dp/dm=4.2^{\circ}/7.8^{\circ}$). The mean direction passes reversal test and fold test at 99% confidence level. Therefore, it is inferred to be a pre-folding component. The paleopole position of this study is close to the Triassic pole positions of the North China Block; it is far from those of the South China Block. Therefore, a first order correlation between the Korean Peninsula and North China at least since Lower Triassic times is identified in this study.

  • PDF