BENCHMARKING THE PREPROJECT PLANNING PRACTICE FOR THE BUILDING CONSTRUCTION INDUSTRY IN TAIWAN

  • Yu-Ren Wang;Yi-Jao Chen;Chun-Yin Yu;Shin-Si Jang
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.324-329
    • /
    • 2011
  • Significant decisions are made by the project team during the early planning phase of capital facility project developments. The preproject planning phase begins after a decision is made to proceed with a project concept and continues until the detail design stage. Many of the industry practitioners and researchers have recognized the importance of preproject planning and that inadequate early planning is one of the key factors affecting project success. Nevertheless, the preproject planning practices vary significantly for the construction industry in Taiwan and the quality of preproject planning relies heavily on individual project team's experience. This research sets out to benchmark the preproject planning practice for the building construction industry in Taiwan. From late 2007 to early 2010, the researchers collected information from a total of 92 building construction projects using questionnaire survey. The analysis results show that the surveyed projects with better preproject planning have better cost and schedule performances on average. It is recommended that project team spend more efforts in the preproject planning stage to have a better chance of achieving project success.

  • PDF

Suggestion and Verification of Assessment model on Construction-Cost of Steel Bridge in Project Performance Phases

  • Kab-Soo Kyung;Hye-Yeon Park;Sin-Hwa Kang;Eun-Kyoung Jeon
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.606-615
    • /
    • 2009
  • Estimating the reasonable construction-cost according to the construction phase in public construction is an important element for securing and executing a national budget efficiently. As a general rule, the predetermined cost of construction is estimated at the end of the design of the target structure. Therefore, it seems to be a considerably difficult problem to estimate the approximate cost of construction, only with its basic information of the bridge in the design planning phase and the early design stage where we can not have specific detailed-section of the target structure. In this paper, we present the calculation of construction-cost in the planning phase based on the analysis of factors affecting the cost of construction conducted in the previous study. Beside, to estimate the cost of construction in early design phase, we would like to present the calculation of construction-cost in the early design phase by executing the analysis of data collected from 61 steel box bridges. It was found from the result of study that the estimated cost of construction gained by the calculation of construction-cost in this paper reduces the error between the real cost of construction and that by the existing method of using.

  • PDF

Development of framework to estimate environmental loads of PSC beam bridges based on LCA

  • Lee, Wan Ryul;Kim, Kyong Ju;Yun, Won Gun;Kim, In Kyum
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.730-731
    • /
    • 2015
  • This study aims at giving the framework to estimate the environmental load at planning and schematic phase. With increasing awareness of environmental issues, the effort to reduce the environmental impacts caused by human activity has been increasingly enlarged. So far most of researches estimating CO2 emissions have analyzed energy consumption based on BOQ (Bills of Quantity) acquired after detailed design. There is also lack of reliability in the estimated environmental impact using the basic unit of a facility at the planning stage, because it uses a limited specific section of historical data. Thus, this study is targeted at developing framework to assess reliable environmental loads based on information available at project early phases by making case-bases from historical design information on PSC Beam Bridge. Historical database is built on the basis of the LCA (Life Cycle Assessment) and in order to set input information for estimating model, the literature about information in an early project phase are reviewed. Using the information available in the planning and schematic design stage, the Framework is presented to estimate the environmental load in an early stage in the project. Developing an environmental load estimation model in accordance with the Framework presented in this study, it is expected that the environmental load in the initial project phase can be estimated more quickly and accurately.

  • PDF

민간 개발 프로젝트 기획단계의 분석절차 및 리스크 관리 모델 구축 (Establishment of Analysis Process and Risk Management Model of Planning Phase in Private Development Project)

  • 허열;김수용;양진국
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.408-413
    • /
    • 2004
  • 민간 개발 프로젝트의 초기 기획단계는 프로젝트 전체의 성패를 좌우하는 중요한 부분이다. 하지만 기존의 기획단계 분석결과의 신뢰도는 중요도에 비해 높지가 않다. 따라서 기존 민간 개발 프로젝트 기획단계의 사례연구 및 연구자료 분석을 통해 근원적인 문제점을 분석하였다. 그 결과 기획단계의 업무 절차나 방법에 관한 체계적 분석 모델의 구축이 되지 않은 것에 그 원인이 있는 것으로 나타났다. 이에 본 연구에서는 그 해결방법으로 기획단계 분석절차 모델과 리스크 관리 모델 구축을 통해 체계적 분석방법을 제시하고자 한다. 제시된 분석방법은 기획단계 분석결과의 신뢰성을 증대시킬 수 있을 것으로 기대된다. 이와 함께 프로젝트 진행단계별 가이드라인을 제시함으로써, 프로젝트의 효율적 수행을 지원할 것으로 기대된다.

  • PDF

Orbit Determination and Maneuver Planning for the KOMPSAT Spacecraft in Launch and Early Orbit Phase Operation

  • Lee, Byung-sun;Lee, Jeong-Sook;Won, Chang-Hee;Eun, Jong-Won;Lee, Ho-Jin
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1999년도 제14차 학술회의논문집
    • /
    • pp.29-32
    • /
    • 1999
  • Korea Multi-Purpose SATellite(KOMPSAT) is scheduled to be launched by TAURUS launch vehicle in November, 1999. Tracking, Telemetry and Command(TT&C) operation and the flight dynamics support should be performed for the successful Launch and Early Orbit Phase(LEOP) operation. After the first contact of the KOMPSAT spacecraft, initial orbit determination using ground based tracking data should be performed for the acquisition of the orbit. Although the KOMPSAT is planned to be directly inserted into the Sun- synchronous orbit of 685 km altitude, the orbit maneuvers are required fur the correction of the launch vehicle dispersion. Flight dynamics support such as orbit determination and maneuver planning will be performed by using KOMPSAT Mission Analysis and Planning Subsystem(MAPS) in KOMPSAT Mission Control Element(MCE). The KOMPSAT MAPS have been jointly developed by Electronics and Telecommunications Research Institute(ETRI) and Hyundai Space & Aircraft Company(HYSA). The KOMPSAT MCE was installed in Korea Aerospace Research Institute(KARI) site for the KOMPSAT operation. In this paper, the orbit determination and maneuver planning are introduced and simulated for the KOMPSAT spacecraft in LEOP operation. Initial orbit determination using short arc tracking data and definitive orbit determination using multiple passes tracking data are performed. Orbit maneuvers for the altitude correction and inclination correction are planned for achieving the final mission orbit of the KOMPSAT.

  • PDF

기술논문 : KSR-Ⅲ 비행안전 시스템 구현 (Technical Papers : Implementaion of KSR-3 Range Safety System)

  • 김주년;고정환;이재득;박정주
    • 한국항공우주학회지
    • /
    • 제30권1호
    • /
    • pp.147-154
    • /
    • 2002
  • 발사체의 발사 시험과 운용에 있어, 예기치 못한 로켓의 오작동으로 인한 인명과 재산의 피해를 예방 또는 최소화하기 위하여 비행안전 시스템은 매우 중요한 역할을 한다. KSR-Ⅲ 발사시 처음으로 운용될 비행안전 시스템은 비행안전 디스플레이 시스템과 비행종단 시스템으로 나뉘어진다. 발사 후 비행중인 로켓의 여러 비행상태와 예상낙하점등은 실시간으로 디스플레이 시스템을 통하여 관찰되며, 로켓이 안전영역을 벗어나거나 로켓의 추적이 불가능하게 될 경우 비행종단시스템은 로켓의 비행을 즉시 중단시키는 역할을 한다. 본 논문에서는 비행안전 시스템 구현에 관하여 수행된 실시간 비행안전 디스플레이 시스템과 비행종단시스템의 개발에 관하여 기술하고 있다.

Lessons Learned during the Early Phases of a Modular Project: A Case Study of UNLV's Solar Decathlon 2020 Project

  • Choi, Jin Ouk;Lee, Seungtaek;Weber, Eric
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.543-550
    • /
    • 2022
  • The U.S. Department of Energy conducts the Solar Decathlon competition as a student-based achievement that encourages sustainable design with energy efficiency and solar energy technologies. In the 2020 competition, the University of Nevada, Las Vegas (UNLV) team designed, fabricated, and constructed a net-zero modular house that applies innovative and highly efficient building technologies. This paper focused on the lessons learned during the early phases of this ongoing modular project. The research methodology included obtaining feedback from key project participants using a well-structured questionnaire. The results showed that the major items/challenges in the project's planning phase included selecting the modular size, planning the construction system, planning the materials and procurement, estimating costs and duration, selecting a fabricator, collaboration and communication, safety, and planning module transportation. These findings will help modular practitioners and future Solar Decathlon competition participants better understand how and what factors they should consider most during the early phases through the lessons learned.

  • PDF

A PROFIRABILITY MODEL BASED ON PRIMARY FACTOR ANALYSIS IN THE EARLY PHASE OF HOUSING REDEVELOPMENT PROJECTS

  • Kyeong-Hwan Ahn;U-Yeong Gim;Jong-Sik Lee;Won Kwon;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.497-501
    • /
    • 2013
  • An important decision-making element for the success of housing redevelopment projects is a prediction of the profitability of redevelopment. Risk factors influencing profitability were deduced through a review of the literature about profitability and a risk analysis developed by a survey of maintenance projects. In addition, a profitability prediction depending on the analysis of risk factors is necessary to judge the business feasibility of a project in the planning stages. A profitability prediction model of management and disposal method, which is calculated by proportional rate and which helps estimate contributions to profitability, is proposed to prevent difficulties in business development. The proposed model has the potential to prevent interruptions, reduce the length of projects, generate cost savings, and enable rational decision-making during the project period by allowing a judgment of profitability at the planning stage.

  • PDF

FPSO DPM 시스템 소개 및 초기 설계 시 고려사항 (Introduction of FPSO DPM System and Design Consideration Factor at the Early Design Phase)

  • 이충열;전광헌;이희성;권용락
    • 대한조선학회 특별논문집
    • /
    • 대한조선학회 2013년도 특별논문집
    • /
    • pp.97-102
    • /
    • 2013
  • As the offshore oil and gas upstream industry moves into deeper water, the FPSOs are the cost-effective solution. In the harsh environment such as in North Sea, station keeping and heading control capability obtained through the DP and Position Mooring (DPM) system of FPSOs play important roles to keep the safety. This paper introduces the concept, function and sub-system of the DPM systems which has been applied for the North Sea FPSOs since the late 1980s. The requirements and guidelines of some internationally recognized standards are also described, which are important to build the design basis at the early phases of the project.

  • PDF

Automated Safety Planning of Scaffolding-Related Hazards in Building Information Modeling (BIM)

  • Kim, Kyungki;Cho, Yong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.255-258
    • /
    • 2015
  • Scaffolds are frequently used in construction projects. Despite the impact on the entire safety, scaffolds are rarely analyzed as part of the safety planning. While recent advances in BIM (Building Information Modeling) provides opportunity to address potential safety issues in the early planning stages, it is still labor-intensive and challenging to incorporate scaffolds into current manual jobsite safety analysis which is time-consuming and error-prone. Consequently, potential safety hazards related to scaffolds are identified and presented during the construction phase. The objective of this research is to integrate scaffolds into automated safety analysis using BIM. A safety checking system was created to simulate the movements of scaffolds along the paths of crews using the scaffolds. Algorithms in the system automatically identify safety hazards related to activities working on scaffolds. Then, the system was implemented in a commercially available BIM software program for case studies. The results show that the algorithms successfully identified safety hazards that were not noticed by project managers of the projects. The results were visualized in BIM to facilitate early safety communications.

  • PDF