• Title/Summary/Keyword: Early Design Stage

Search Result 850, Processing Time 0.028 seconds

Application of Value Engineering to Early Design Phases in Construction Projects (건설사업 설계초기단계 VE 적용방안)

  • Lee Seung-Hoon;Koo Kyo-Jin;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.156-166
    • /
    • 2005
  • The purpose of this study is to present proper VE application methods to euly design phases. Since VE methodology is more effective on early stage of design phase, the study focused on application of VE methodology in early stage of design process. With the examination of past studies, obstacles of VE application in domestic construction industry are defined. To solve these problems, this paper presents (1) subdivision of VE execution time, (2) an appropriate VE targeting method for construction industry, (3) a resonable and practical function analysis process, and (4) modified design-VE job plan.

An application of LT method for Design-decisions to improve energy performance of non-domestic buildings during the early stage of Remodeling Process (비주거용 건물의 리모델링 계획 시 에너지 성능 향상을 위한 LT method의 적용 방법에 관한 연구)

  • Leigh, Seung-Bok;Byun, So-Hyung
    • KIEAE Journal
    • /
    • v.3 no.4
    • /
    • pp.3-14
    • /
    • 2003
  • Remodeling for an aged building is emerging as a potential alternative towards the future of the building industry. It is a more effective method than the new construction in environmental friendly view. Most of remodeling were aimed at the improvement of the function of the deteriorated finishing materials. But, at the early stage of remodeling process, energy performance of a building can be improved by adopting passive design solutions such as daylighting and natural ventilation. The purpose of this study is to explain the passive design strategy in remodeling process and to suggest a application of LT method. LT method is an energy-design tool which responds to parameters available early in design development. It provides an output of annual primary energy for lighting, heating, cooling and ventilation in non-domestic buildings. LT method basically uses the concept of passive zone and non-passive zones and should be used to evaluate the energy performance of a number of options and to make comparisons. In this paper, the process of LT method is introduced and investigated an applicability in our office building.

Considerations in the early stage of Designing the Unit Modular Building (유닛모듈러 건축물의 설계 초기 단계에서의 고려 사항)

  • Lee, Young-Ho;Lee, Du-Heon;Kim, Kyoon-Tai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.133-142
    • /
    • 2012
  • With the recent changes in building environments such as low-carbon green growth, there have been increasing demands for the new building system that is eco-friendly and can maximize efficiency such as the unit modular system. For the unit modular system, more than 80% of the whole process is carried out in the factory while in the field, mostly unit module assembling and finish work are done. Thus, the quality at the pre-construction stage when design and manufacturing are done determines the quality of the building as a whole. In the country, the unit modular method was first applied in 2003 to school buildings and has gradually expanded afterwards, but due to the lack of examples and related information as well as the small scale of modular manufacturers, its characteristics have not been sufficiently reflected in design, manufacturing and field constructions. This study, as an attempt to improve the design quality of unit modular buildings, points to the problem in manufacturing and field construction, compares and analyzes its causes, and suggests major points to be considered in the early stage of designing the unit modular buildings.

Analyzing Data for Development of Structures Cost Estimating Model - Focused on Government Building Project - (건축 구조체 공사비 산정모델 개발을 위한 데이터 분석 - 공공청사를 중심으로 -)

  • Kim, Soo-Min;Cho, Jae-Ho;Lee, Jong-Sik;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.212-215
    • /
    • 2008
  • When managers predict exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But present of public construction cost estimation and management almost after the construction documents design phase. Therefore, construction cost management in the early stage and schematic design phase to generally use approximate estimating is not correct. Accordingly, this study analyze problem of current cost estimating method and a concrete cost plans make using case information of actual cost to analyze in schematic design phase. Possible to check going on the suitable design, this study conducts the preliminary research for the development of cost estimating model.

  • PDF

The Development of an Product Cost Estimation System at the Product Design Stage (제품 설계 단계에서의 제품 원가 추정 시스템 개발)

  • 한관희;박찬우;이규봉;황태일;김강용
    • Korean Journal of Computational Design and Engineering
    • /
    • v.8 no.2
    • /
    • pp.101-108
    • /
    • 2003
  • Presented in this paper is the development of an product cost estimation system at the product design stage. The efficient cost estimation function at the design stage is essential for the cost reduction activities through the entire product life cycle. For this purpose, it is necessary to establish a systematic working procedure, and to develop information system for managing a great deal of production and product-related data required for the cost estimation. The developed system has the capability of estimating a cost of assembly type products as well as unit-item type products. As proposed system is based on the variant approach, it can be used easily at an early design stage without the need for detail design information. Also, this system is integrated with legacy PDM (Product Data Management) and ERP (Enterprise Resource Planning) system for fast. accurate and easy product cost estimation. The estimated cost includes material cost, overhead cost as well as labor cost.

Systematization of Evaluation Indicators for Integrated Safety Performance Verification of Buildings in the Early Design Stage (초기설계단계에서 건축물 통합 안전성능 검증을 위한 평가요소 체계화에 관한 연구)

  • Seo, Ji-Hyo;Choo, Seung-Yeon
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.34 no.3
    • /
    • pp.53-60
    • /
    • 2018
  • When planning buildings, safety should be considered as a priority over any other performance. The study aims to derive and systematize elements that can be reflected in the design stage, which affects the safety of construction workers and building users. The elements for safety of workers are classified by type of work, and the elements for safety of users are classified by fields. Elements that are difficult to be reflected in design stage or those whose effects are insignificant are excluded. In addition, application scenarios have been proposed for each element so that the elements created in this study can be directly applied and utilized in practice. This will contribute to lowering the accident rate of construction projects by evaluating the harmful risks of construction projects at the design stage.

The use of network theory to model disparate ship design information

  • Rigterink, Douglas;Piks, Rebecca;Singer, David J.
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.6 no.2
    • /
    • pp.484-495
    • /
    • 2014
  • This paper introduces the use of network theory to model and analyze disparate ship design information. This work will focus on a ship's distributed systems and their intra- and intersystem structures and interactions. The three system to be analyzed are: a passageway system, an electrical system, and a fire fighting system. These systems will be analyzed individually using common network metrics to glean information regarding their structures and attributes. The systems will also be subjected to community detection algorithms both separately and as a multiplex network to compare their similarities, differences, and interactions. Network theory will be shown to be useful in the early design stage due to its simplicity and ability to model any shipboard system.

Design Process for Stage Costume of the Theatre 'White Neutral Nation(Original: Andorra)' (연극 '하얀중립국(원제:안도라)'의 무대의상 전개과정)

  • Cho, Woo-Hyun;Cho, Hyun-Jin;Park, Min-Jae
    • Journal of the Korea Fashion and Costume Design Association
    • /
    • v.15 no.4
    • /
    • pp.1-15
    • /
    • 2013
  • The stage costume in theater, along with the stage art, is the element that has the biggest visual effect in helping the audience to understand the theater. Nevertheless, in the domestic theater production system, compared with the other public performance products, the stage costume has been rented or purchased due to the lack understanding of the importance of the stage costume and budget problem, and thus the role of the stage costume has been undervalued. Such a phenomenon is more noticeable in the small scale theater. However, in this play White Neutral Nation (Original: Andorra), the production team and the directing team recognized the importance of the costume in the early stage of production, and accordingly lots of efforts, such as staff meetings and budget allocation, were made for the stage costume. As a result, the entire production process of the stage costume could be examined. Recently, performance culture in Korea has made rapid progress and diverse forms of public performances are created and planned. Accordingly, the level of audience has been rising and the interest in the stage costume is also rising. So, it can be said that not only the stage costume but also the production system that makes it are important. This research examined the production process of the stage costume only of the play White Neutral Nation but it is considered necessary to make researches on the production process of the stage costume used for the theater of different themes and public performances of different kinds and to systematize their production process of the stage costume.

  • PDF

Kinematics and Dynamics Analysis of Precision stage (정밀 스테이지의 기구 동역학 해석)

  • Ju, Jae-Hwan;Yim, Hong-Jae;Jang, Si-Youl;Jung, Jae-Il
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2007.05a
    • /
    • pp.677-682
    • /
    • 2007
  • Recently, a precision stage is widely used in the fields of the nano technology. In this paper, the precision stage which consists of linear motor, vision system, light source system and controller, is designed and developed for nano imprint machine. Stiffness design considering resonance frequency is important for the precision stage. A virtual machine simulation is useful for machine development the early design stage. Kinematic and dynamic simulations of XYZ stage are performed. To consider the resonance frequency and vibration effects flexible multibody dynamics are utilized with FE modeling of the structural components.

  • PDF

Effective Estimation Method of Routing Congestion at Floorplan Stage for 3D ICs

  • Ahn, Byung-Gyu;Kim, Jae-Hwan;Li, Wenrui;Chong, Jong-Wha
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • v.11 no.4
    • /
    • pp.344-350
    • /
    • 2011
  • Higher integrated density in 3D ICs also brings the difficulties of routing, which can cause the routing failure or re-design from beginning. Hence, precise congestion estimation at the early physical design stage such as floorplan is beneficial to reduce the total design time cost. In this paper, an effective estimation method of routing congestion is proposed for 3D ICs at floorplan stage. This method uses synthesized virtual signal nets, power/ground network and clock network to achieve the estimation. During the synthesis, the TSV location is also under consideration. The experiments indicate that our proposed method had small difference with the estimation result got at the post-placement stage. Furthermore, the comparison of congestion maps obtained with our method and global router demonstrates that our estimation method is able to predict the congestion hot spots accurately.