건축 시공단계 환경관련 법규 현황 및 개선방향 (Status and Improvement Direction of Environment-related Laws in Construction Phase)

  • 홍석규;김창원;차민수;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.146-148
    • /
    • 2013
  • Recently Construction industry is try to minimize effects on the Environment. So, Korea government is provided the Environmental law, but environmental managers who works in construction phase are not easy to understand the Environmental law because the laws are scattered in the several legislations and hardly to find the clauses for the environmental law. Therefore this study intends to deduct the improvement directions of Environmental laws. The basis data is selected through survey targeting environmental managers and analyzed by AHP.

  • PDF

건축시공단계 환경부하 저감을 위한 우선 관리공종 도출 (Deduction of the Primary Management Works for Reduction of the Environmental Loads at the Construction Phases)

  • 조아라;김창원;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.144-145
    • /
    • 2013
  • With the increasing public concerns on sustainability in construction industry around the world, a variety of standards for sustainable construction have been developed and implemented. However, most of the them focuses operation and maintenance phases and do not have been approached integrally in terms of all construction phases. Especially, considering the quantities of environmental loads occurred intensively at the construction phases, it should not be overlooked. Therefore, the purpose of this study is to deduct primary management works for reduction of the potential environmental loads at the construction phases. In order to assess them quantitatively, we conduct a survey from professionals who are in the relevant fields and analyze these data using Fuzzy-AHP.

  • PDF

Impact Analysis of Construction Delay: The Case of Defects In the Top-down Construction Method

  • Suk, Janghwan;Kwon, Woobin;Soe, Jang-woo;Cho, Hunhee
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.213-221
    • /
    • 2022
  • Defects are the risk factors in the construction process of buildings. They cause damage, delaying the construction duration. They especially cause adverse effects on the top-down construction method. This study analyzed the degree of construction delay induced by each work type, focusing on defects in the top-down method. Then, we derived construction delay induction coefficient from different work types in order by using the severity of construction delay per defect and the occurrence probability of defect; this assessment model measures the impact of defects on construction delay for each work type. Furthermore, by comparing each work type based on the defect frequency and the construction delay induction coefficient, we found work types that need to be administered attentively. We identified that plastering work was easy to overlook, requiring caution in defect management. This study provides an efficient defect management system suitable for the buildings that are built using the top-down construction method.

  • PDF

THE CHECKLIST FOR ENVIRONMENTAL-FRIENDLY CONSTRUCTION PROJECT MANAGEMENT IN CONSTRUCTION PHASE

  • Oh, Kyung-Taek;Jung, In-Su;Lee, Chan-Sik
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1522-1527
    • /
    • 2009
  • Construction project is necessary element for human life to upgrade the quality and convenience. However, due to its contradictory nature to the environment conservation, environmental pollution and damage, deterioration of natural scenery, noise/vibration, water quality pollution, etc. caused in the process of construction greatly affect the environment. The purpose of this study is to propose checklist for environment management can be used in construction phase. For this, we went ahead with the research by studying the existing research related to environment-friendly construction project management both at home and abroad, investigation and analysis of environment-related laws and ordinances, and drawing the checklists for natural environment and living environment at the construction phase. As a result, we were able to compile a checklist for nine items including geological features, animals and plants, use of soil, quality of air, water, and soil, construction wastes, noise, vibration, recreation, and sceneries. The checklist is structured in 4 grades and coded so as to allow it to be developed with the use of computer system in future. We hope that the checklist presented in this study will help lead the managers at the construction phase in construction development sustainable from the perspective of environmental conservation.

  • PDF

A Study on the Construction Plan of Machinery Public Platform through the Survey of the Construction Machinery Rental Market

  • Chang Wook Kim;Myeong Jin Jeong;Hyo Bae Lee;Jong Kwan Ho;Myeong Gu Lee
    • International Journal of Internet, Broadcasting and Communication
    • /
    • 제15권4호
    • /
    • pp.311-325
    • /
    • 2023
  • In the construction machinery rental market, there are frequent cases of sublease through large-scale rental companies or rental through mediation organizations without legal grounds. In addition, institutional improvement of the construction machine safety management system has been required due to concerns over the internalization of legal inspections due to the lack of type approval data and construction machine history management during the construction machine inspection process. The government is responsible for securing safety of construction machinery and promoting mechanization of construction machinery by efficiently managing the construction machinery market by setting safety management such as type approval, registration, and inspection of construction machinery. In order to efficiently implement this, it is required to establish a platform for renting construction machinery and collecting safety management information. We presented a plan to build a public platform for construction machinery to secure the soundness of the construction machinery rental market and to improve safety management.

건설단계 BIM을 이용한 건축물의 전 과정 CO2 평가 기법 제안에 관한 연구 (A Proposal of Life Cycle CO2 Assessment Techniques for Building in Construction Stage by BIM LOD)

  • 방준식;태성호;노승준;금원석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.53-54
    • /
    • 2012
  • This study is aimed at utilizing LCA processor with BIM LOD, eliciting the problems of the existing environmental assessment by constructing the database for environmental values of green buildings. For these objects, environmental load database of BIM construction material and evaluation process are presented, after matching BIM family based environmental load database which is available during evaluation stage, input-output tables and Korea LCI database to standard item code of public procurement service. It is a important factor in environmental assessment of building to develop database unit of standard item code for BIM and construction material. Thus, the results of this study are expected to provide basic data for improving effectiveness of construction through BIM based environmental load evaluation database. Furthermore, the provided environmental load database unit for construction material is considered to be available as basic information for BIM study by suggesting a processor connecting BIM with LCA and along with this, continuous examination on the connection process is needed.

  • PDF

Framework for Estimating Appropriate Construction Duration of CFRD in the Planning Phase

  • Kim, In Kyum;Kim, Kyong Ju;Yun, Won Gun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.604-605
    • /
    • 2015
  • To secure quality of dam construction needs appropriate construction duration. Tight construction schedule may have negative influence on infrastructure quality, work safety and maintenance cost. It is necessary to reflect proper construction duration in the planning phase. There have been standards for estimating construction duration of building and industrial complex development but dam construction have not. In order to estimate construction duration of CFRD, feasible study reports and design reports were analyzed to acquire available information. After that, considering on construction duration methods such as comparison with similar cases, approximate estimating formula, approximate quantity assumption were adapted to Critical Path items. Hence, this study present framework for construction duration estimating of CFRD in the planning phase. This framework can be applied other types of dam along the same line.

  • PDF

건축공사 현장의 환경관리비 실태 조사 (An Investigation of Environmental Management Costs in the Construction Sites)

  • 김성진;김재준
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.588-591
    • /
    • 2004
  • 최근, 사람의 생활가치관이 경제적 발전보다는 삶의 질적 향상으로 변화함에 따라 환경친화적인 건설에 대한 요구가 점차 증가하고 있다. 또한 소음 진동과 같은 건설공해에 대한 민원이 급증하고 있는 추세에 있다. 건설공사에서 건설오염을 완전히 제거하는 것은 불가능 하지만 그 발생을 최소한으로 줄이려는 노력이 필요하다. 이러한 문제를 풀기 위해 먼저 프로젝트 계획단계에서부터 환경관리비용이 적절하게 계상되어야 한다. 그러나 현재 법규상의 계상기준 및 항목 설정에 문제점들이 발생하여 효과적으로 환경관리비용이 계상되지 않고 있다. 이에 본 연구에서는 건축건설현장 78곳의 실적자료를 바탕으로 하여 환경관리비 사용 실태를 조사 분석 하였다.

  • PDF

Cradle to Gate Emissions Modeling for Scheduling of Construction Projects

  • Sharma, Achintyamugdha;Deka, Priyanka;Jois, Goutam;Jois, Umesh;Tang, Pei
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.975-983
    • /
    • 2022
  • This paper presents an innovative way of integrating scheduling and project controls with the environmental impact of a construction project to track, monitor, and manage environmental emissions at the activity level. As a starting point, scheduling and project controls help monitor the status of a project to provide an assessment of the duration and sequence of activities. Additionally, project schedules can also reflect resource allocation and costs associated with various phases of a construction project. Owners, contractors and construction managers closely monitor tasks or activities on the critical path(s) and/or longest path(s) calculated through network based scheduling techniques. However, existing industry practices do not take into account environmental impact associated with each activity during the life cycle of a project. Although the environmental impact of a project may be tracked in various ways, that tracking is not tied to the project schedule and, as such, generally is not updated when schedules are revised. In this research, a Cradle to Gate approach is used to estimate environmental emissions associated with each activity of a sample project schedule. The research group has also investigated the potential determination of scenarios of lowest environmental emissions, just as project managers currently determine scenarios with lowest cost or time. This methodology can be scaled up for future work to develop a library of unit emissions associated with commonly used construction materials and equipment. This will be helpful for project owners, contractors, and construction managers to monitor, manage, and reduce the carbon footprint associated with various projects.

  • PDF

시공단계 환경부하 저감 가이드라인 구축을 위한 주요 구성항목 도출 (Deduction of Critical Components for establishing the Environmental Load Reduction Guideline in Construction Phase)

  • 김창원;김춘학;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.127-128
    • /
    • 2012
  • Recently, Construction industry has been trying to reduce environmental loads reflecting the global trend 'Green Growth'. Internal and External countries are provided 'green building certification', 'relevant law/regulations', 'guideline to life cycle', however, construction phase has been overlooked though environmental loads occurred intensively in this phase. Therefore, this study intend to deduct components reflected the guideline in construction phase and assess them quantitatively. The basis data is collected through survey targeting construction managers and related researchers and analyze these data using Analytic Hierarchy Process.

  • PDF