• Title/Summary/Keyword: EIA Council

Search Result 8, Processing Time 0.017 seconds

A Study on the Improvement of the EIA Items and the Operating System Based on the Analysis of EIA Items Usage (환경영향평가의 평가항목 이용현황 분석을 통한 평가항목 조정 및 운영체계 개선안 도출)

  • Park, Ji Hyeon;Choi, Joon Gyu
    • Journal of Environmental Impact Assessment
    • /
    • v.27 no.1
    • /
    • pp.1-16
    • /
    • 2018
  • Selecting target items of EIA(Environmental Impacts Assessment) is very important process in conducting the EIA. In Korea, like other countries, the EIA Council selects the target items before starting the EIA process. However, the assessment items stipulated in the Enforcement Decree of the Environmental Impact Assessment Act is almost wholly applied to most businesses. Thus, the EIA is difficult to carry out reflecting the characteristics of the target business. Additionally, the items of EIA have a structure that is difficult to change, so that the items of EIA is easy to fall apart from the current social needs. Therefore, the purpose of this study is to suggest adjustment of the items of EIA by reflecting the changes in the assessment and social conditions based on analysis of the usage and effectiveness of the current EIA items. In addition, this study would like to propose a improvement of the operating system in order to ensure that EIA items can be selected effectively.

Environmental Impact Assessment in Europe : Legal Basis and Recent Developments (유럽에서의 환경영향평가)

  • Bunge, Thomas
    • Journal of Environmental Impact Assessment
    • /
    • v.4 no.3
    • /
    • pp.55-61
    • /
    • 1995
  • The European Community (EC) began dealing with the subject of environmental impact assessment (EIA) in the mid-1970s. After ten years of preparatory work and more than 20 draft versions, the EC Council of Ministers adopted, in 1985, the Directive on the assessment of the effects of certain public and private projects on the environment (85/337/EEC). This directive requires the member states to make EIA mandatory for certain projects. Its Article 3 defines the purpose of the instrument: "The environmental impact assessment will identify, describe and assess the direct and indirect effects of a project. There are no rules on scoping or on post-project analysis. However, member states are free to adopt, in their domestic legislation, more stringent rules regarding the scope and procedure of EIA. Consequently, they have developed national EIA systems which differ considerably from each other. Also, EIA practice in each of these countries is different from that in the others. In 1992, the EC Council adopted the 'Flora, Fauna, Habitat' Directive which lays down an additional EIA requirement. Member states will have to develop a network of 'European' nature conservation areas. Each project or plan possibly endangering these areas will have to be assessed whether it is in line with the protection purposes laid down for them. Although the directive does not say so explicitly, this means that a kind of EIA will have to be carried out for those projects and plans. For several years, the Commission has been developing proposals for a directive on EIA of plans and programmes ("strategic EIA"). This would supplement directive 85/337/EED, and would require and EIA for plans and programmes influencing decisions on specific projects(e.g. agricultural plans or energy programmes). At present, procedural and methodological questions of strategic EIA are being discussed extensively both within and without the European Union.

  • PDF

Institutional Features of Environmental Impact Assessment System in the Jeju Special Self-Governing Province (제주특별자치도 환경영향평가제도의 제도적 특징에 관한 고찰)

  • Yang, Soon-Mi;Lee, Ki-Ho;Hu, Chul-Goo
    • Journal of Environmental Science International
    • /
    • v.30 no.8
    • /
    • pp.647-658
    • /
    • 2021
  • Jeju Special Self-Governing Province has implemented a self-governing environmental impact assessment system (Jeju-EIAS) in recognition of its autonomy. In this study, the institutional features of Jeju-EIAS were examined by analyzing the development projects whose consultation under Jeju-EIAS were completed from 1994 to 2019. The consultation procedure of Jeju-EIAS, such as the actual operation of Review Committee for Environmental Impact Assessment (EIA), the consent of the provincial council, and the regular follow-up activities for the implementation of EIA consultations, has been implemented differently from those of other metropolitan cities and provinces. Under Jeju-EIAS, types of development projects subject to consultation on EIA also take into account local conditions, and include the construction of aquarium basin and building. In addition, provisions concerning the scale of development projects is strengthened above the Korean Environmental Impact Assessment Act (EIA Act).

Development and validation of a simple, sensitive enzyme immunoassay for quantification of androstenedione in bull plasma

  • Mallick, Smrutirekha;Kumar, BS Bharath;Prakash, BS;Aggrawal, Anjali;Pandita, Sujata
    • Journal of Animal Science and Technology
    • /
    • v.57 no.4
    • /
    • pp.13.1-13.5
    • /
    • 2015
  • As an alternative to radioimmunoassay a simple and highly sensitive enzyme immunoassay (EIA) was developed and validated for androstenedione quantification in plasma of Karan Fries bulls using second antibody coating technique. The wells of the microtitreplate were coated with affinity-purified goat immunoglobulin (antirabbit IgG) that binds the hormone specific antibody. The EIA was performed to analyze androstenedione directly in $40{\mu}l$ of bull plasma. The androstenedione standards ranged from 0.20 to 200 pg/$40{\mu}l$/well and the sensitivity of the assay was 5 pg/ml plasma. Serially diluted bull plasma containing high endogenous androstenedione showed good parallelism with bovine androstenedione standard curve. Intra- and inter-assay coefficients of variation (CV) were found to be 8 and 9%, respectively. Peripheral plasma androstenedione concentrations determined in young and adult bull samples ranged between 104-990 pg/ml and 184-2040 pg/ml, respectively.

A Study on Integrated Approaching Factors of Environmentally-Friendly Companies Certification Scheme and Environmental Impact Assessment of Korea (환경친화기업지정제도와 환경영향평가제도에서의 통합적 환경관리 요소에 대한 기초적 연구)

  • Hong, Jun-Suk;Kim, Kyu-Yeon;Kwon, Oh-Sang
    • Journal of Environmental Impact Assessment
    • /
    • v.17 no.2
    • /
    • pp.113-124
    • /
    • 2008
  • A worldwide trend of permitting system for industrial installation to achieve a high level of protection of the environment has been moved from single media to multimedia in approach. The Council of the European Community issued the Directive 96/61/EC, the IPPC Directive, concerning integrated pollution prevention and control in 1996. The IPPC Directive is one of the most ambitious legal measures that the European Union (EU) has initiated with a view to applying the prevention principle for industrial activities. The IPPC aims to achieve the integrated prevention and reduction of environmental pollution emitted by those industrial installations with a higher potential of emissions to the environment. Organization for Economic Cooperation and Development (OECD) recommended on Environmental Performance Reviews of Korea in 2006 that IPPC permitting concept should be considered for large stationary sources at the national and regional levels. Any Korean law doesn't provide for integrated pollution control with a single process covering all pollution from economic activities. However, one exception might be the "environmentally-friendly companies" certification scheme, introduced in 1995, in which participants agree to meet targets beyond the legal emission limit values in exchange for government technical and financial support to operate environmental management systems. The other exception might be Environmental impact assessment (EIA) of projects, in 1977, which has been strengthened and reinforced to be more preventive through development of the prior environmental review system (PERS) in 1999. The aim of this work is to introduce the contents of IPPC Directive at the viewpoint of Korea policy and to survey the integrated approaching concept of Environmentally-Friendly Companies (EFC) Certification Scheme and EIA policy of Korea. The study will be helpful in the future to prepare the infrastructure of integrated permitting system and to enforce the integrated permit which the authorities of local government issues on industrial activities. It can be said that the data calculated through both EFC Certification Scheme and EIA will be discussed as worthful information to determine Korean BAT reference notes for integrated permitting process.

The Train System Specification Development Using Systems Engineering Process (시스템엔지니어링 프로세스에 따른 열차시스템사양서 개발)

  • Han, Seong-Ho;Choe, Seong-Gyu;Lee, Jung-Yun
    • 시스템엔지니어링워크숍
    • /
    • s.1
    • /
    • pp.134-139
    • /
    • 2003
  • The mission of tilting train development project is enhancing the speed of transportation of railway passenger using existing infrastructure. The threat of this project is the tilting technology is newly incorporated to this project. To overcome the threat this project incorporate systems engineering technology to development tilting train system. The systems engineering process, which was used in this project, was performed in accordance with systems engineering standard EIA632. This paper shows the systems engineering technology which was used to develop the tilting train system specification. This paper also shows the requirement template which was developed to communicate and synthesis various specialty engineering.

  • PDF

Risk Assessment in OECD High Production Volume Chemicals Program and its Countermeasure (OECD 대량생산화학물질 위해성평가 및 대책)

  • Kim, Myungjin;Bae, Heekyung;Choi, Yeonki;Kim, Mi Kyoung;Koo, Hyun-Ju;Song, Sang-Hwan;Choi, Kwang-Soo
    • Journal of Environmental Impact Assessment
    • /
    • v.14 no.5
    • /
    • pp.347-353
    • /
    • 2005
  • The risk assessment is the qualitative or quantitative evaluation of the risk posed to human health and the environment by the actual or potential presence or release of hazardous substances, pollutants or contaminants. The environmental impact assessment (EIA) is assessed by the environmental criteria, and risk assessment is assessed by the risk rate. Risk rate based on dose-response values may not be easy to apply on regulatory basis like EIA for uncertainty. Internationally there is an example of OECD program. Risk assessment of High Production Volume (HPV) Chemicals has started since the OECD Program with the 1990 Council Act on the Co-operative Investigation and Risk Reduction of Existing Chemicals. These HPV chemicals include all chemicals produced or imported at levels greater than 1,000 tonnes per year in at least one Member country or in the European Union region. The SIDS called the Screening Information Data Set is regarded as the minimum information needed to assess an HPV chemical to determine whether any further work should be carried out or not. All the data elements of SIDS including assessment for environment and health are prepared as three formats of the full SIDS Dossier, the SIDS Initial Assessment Report (SIAR), and the SIDS Initial Assessment Profile (SIAP) of an HPV chemical. In 1998 the global chemical industry through the International Council of Chemical Associations (ICCA) has joined to work with OECD. The OECD has assessed approximately 1,000 chemicals from 1991 through 2004 with ICCA. Till the February of 2005, 592 chemicals of those chemicals completed SIDS reports. Member countries have been targeted the goal of 1,000 new chemicals from 2005 to 2010 and Korea shared 36 chemicals from the 1,000 new chemicals. Currently Korea has completed SIDS reports of 7 chemicals among sponsored 24 chemicals. In conclusion SIDS project will be linked to national program for outputs application with more reliable production. Both the OECD and industry will carry out their commitment to complete assessments for more and the remaining chemicals assessment. The major outputs will contribute to cope with international chemical management.

Composting Method and Physicochemical Characteristics of By-products from Home Garden Plants and Small Herbivore Feces (옥수수 부산물과 토끼 분변의 이화학적 성분특성 및 퇴비 제조조건)

  • Kim, Dae-Gyun;Kim, Jin-Young;Lee, Won-Suk;Kim, Hye-Hyeong;Seo, Myung-Whoon;Park, In-Tae;Hyun, Junge;Yoo, Gayoung
    • Journal of Environmental Impact Assessment
    • /
    • v.27 no.6
    • /
    • pp.695-703
    • /
    • 2018
  • This study was conducted to suggest a sustainable farming practice forresource recycling in vegetable gardens of North Korea. In North Korea, farmers are allowed to own private vegetable gardens less than $100m^2$. However, usage of fertilizers in private vegetable gardens is very limited due to economic sanctions by UN security council. If North and South Korea initiated the cooperative action in the near future, agricultural sector would be the highest priority cooperation area. Considering the current North Korean situation in agriculture, we would like to suggest a method for producing organic fertilizer manure. For raw materials for producing manure, we selected corn byproduct, which is the most abundant material, and rabbits' feces, which are easily obtained from individual private farms in North Korea. As we cannot get corn byproducts and rabbits' feces from North Korea, we prepared samples of corn byproducts and rabbits; feces from many places in South Korea. After statistical analysis of variance, there was no significant difference in the T-N contents of corn byproducts from Gyeonggi, Gangwon, Chungnam, Chungbuk, Jeollabuk and Gyeongsangnam-dos, which indicates that the fertilizing quality of corn byproducts does not vary significantly in the spatial scale of South. Korea. In this sense, if we use corn samples from Gyeonggi province, they would not be very different from those of North Korean regions. Physicochemical properties of rabbits' feces were different between those eating feed grains and those eating plants only. Hence, we used rabbits' feces of the rabbits from Yeonchun area, which were fed by plants only. Using three different mixing ratios of corn byproducts and rabbits' feces, composting was conducted for 60 days. The mixing ratio of 1:1 produced the manure with % T-N of 1.98% and OM/N ratio of 31.7 after 30 days of composting, which is comparable to the quality of commercial manure.