• Title/Summary/Keyword: E-Project Management

Search Result 524, Processing Time 0.022 seconds

Improving Outsourced ISD Project Performance : Focusing on Conflict and Conflict Resolution Facilitation (아웃소싱을 통한 정보시스템 개발성과 향상방안 : 갈등 및 갈등해결 촉진을 중심으로)

  • Cho, Dong-Hwan;Lee, Ho-Geun;Lee, Choong-Cheong
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.33 no.1
    • /
    • pp.71-105
    • /
    • 2008
  • Various stakeholders within and outside of the organization are involved and participate in the outsourced IS development. As their interests and goals are different conflict arises in the process of their interaction, and it is an important factor affecting outsourcing success. The study focuses on the conflict between client users and vendor, i.e. main conflict in the outsourcing project, and examines the relationship of conflict with project success, the antecedents of conflict, and investigates the effectiveness of conflict resolution facilitation. An integrated conceptual model is developed grounded on is outsourcing, IS development, project management, and organizational behavior literature. Nine specific hypotheses on the conflict in outsourcing projects are proposed, and data collection and analysis are performed with 214 ISD outsourcing projects. Results indicated that the conflict between client users and vendor in outsourcing projects was found to have negative effects on project success. Main causes affecting conflict were examined, and relative influences of these causes were clarified. Recently internal IT personnel have been faced their role change with the increase of outsourcing, and the importance of their conflict resolution facilitation was highlighted.

A Study on Schedule Management in Construction Projects by CCPM (CCPM을 이용한 건설사업 일정관리에 관한 연구)

  • Park Young-Min;Kim Soo-Yong;Kim Ki-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.84-92
    • /
    • 2004
  • Construction work varies with the project types. However, the success of all project types depends upon three conditions i.e. schedule, quality and cost. If these three conditions are fulfilled, then project said to be successful. In this paper, scheduling of a construction Project has been dealt with the application of CCPM method. CCPM has been introduced as a new theory in construction industry in 1997 at the United States, but its application is still insufficient in domestic field due to the absence of systematic study, A simulation has been conducted in a Bridge construction project to validate the possibility of CCPM in order to complement PERT/CPM in construction field. The result of study shows that the CCPM could be effective to reduce the project time duration than existing PERT/CPM technique.

Construction Delays in Developing Countries: A Review

  • Islam, Muhammad Saiful;Trigunarsyah, Bambang
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.1
    • /
    • pp.1-12
    • /
    • 2017
  • Construction delay is one of the basic constrains to achieve the project objectives in developing countries. This study aims to find the causes and effects of construction delays in developing countries. A thorough literature review has been done following the content analysis method. The relevant literature of 28 developing countries was collected from the scholarly journals published in the period of 2006 to 2016. The different developing countries are grouped into three geographic regions, i.e. South and Southeast Asia, Middle East, and Africa. In these regions, total 53 potential causes of delay under 8 major groups are identified. Frequency and ranking of these factors have been done. The factors, delay in progress payment by owner, contractors' cash flow problem, improper planning and scheduling, poor site management, and change order by owner during construction, are acknowledged as critical causes of delay in developing countries. This study will assist both academic and professional experts providing more insight about the construction delays and project management in developing countries.

A Methodology for Estimating Optimum Hardware Capacity E-learning System Development (E-러닝시스템 구축 프로젝트의 적정 하드웨어 산정방법론 연구)

  • Jung, Ji-Young;Baek, Dong-Hyun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.3
    • /
    • pp.49-56
    • /
    • 2011
  • Estimating optimum hardware capacity of an e-learning system is very important process to grasp reasonable size of designing technique architecture and budget during step of ISP(information strategic planning) and development. It hugely influences cost and quality of the whole project. While investment on information system hardware has been continuously increased, there was no certified hardware capacity estimating method in e-learning system development. A guideline for hardware sizing of information systems was established by Telecommunication Technology Association in 2008. However, the guideline is not appropriate for estimating optimum hardware capacity of an e-learning system because it was designed to provide general standards for estimating hardware capacity of various types of projects. The purpose of this paper is to provide a methodology for estimating optimum hardware capacity in e-learning system development. To develop the methodology, this study, first of all, analyzes two e-learning development projects, in which the guideline was applied to estimate optimum hardware capacity. Then, this study finds out several key factors influencing on hardware capacity. Finally, this study suggests a methodology for estimating optimum hardware capacity of an e-learning system, in which weights for the factors are determined through AHP analysis.

Advanced Work Packaging (AWP) in Practice: Variables for Theory and Implementation

  • Jung, Youngsoo;Jeong, Yeheun;Lee, Yunsub;Kang, Seunghee;Shin, Younghwan;Kim, Youngtae
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.201-206
    • /
    • 2020
  • Diversification of project delivery methods (PDM) under ever-changing construction business environment has significantly changed the role of project participants. Active efforts to effectively sharing the roles and responsibilities have been observed in the project management offices (PMOs) among owner/operator organizations as well as engineering, procurement, construction and maintenance (EPCM) firms. In order for being effective in a holistic way throughout the project life-cycle, a PMO needs to have 'adequate management skills' as well as 'essential technical capabilities' in cooperating with many different participants. One of the well-known examples of the PMO's tool to support these skills and capabilities is the effective 'work packaging (WP)' that serves as a common basis integrating all relevant information in a structured manner. In an attempt to enhance the construction productivity, the concept of 'advanced work packing (AWP)' has been introduced by Construction Industry Institute (CII). The AWP enables productivity to be improved by early planning of construction packages in the design phase "with the end in mind". The purpose of this study is to identify and evaluate the 'variables' of advanced work packing (AWP) for life-cycle information integration. Firstly, an extended concept of advanced WP based on the CII AWP was defined in order to comprehend many different issues of business functions (e.g. cost, schedule, quality, etc.). A structured list of major components and variables of AWP were then identified and examined for practical viability with real-world examples. Strategic fits and managerial effectiveness were stressed throughout the analyses. Findings, implications and lessons learned are briefly discussed as well.

  • PDF

A STUDY ON THE SELECTION CRITERIA OF DELIVERY SYSTEM BY TYPES OF THE PUBLIC CONSTRUCTION PROJECTS

  • Eun-A Choi;Su-Man Choi;Jai-Dong Koo;Nam-Gi Lim;Sang-Beom Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1440-1445
    • /
    • 2009
  • Clients demands have been changed by construction circumstances such as high-technology, megaprojects, and the complexity of construction. Advanced foreign nations have already introduced and applied new project delivery systems (i.e, CM, DB, etc.) to deal with the change of such that. Korea has also promoted variation of the delivery systems for the progressive measure to the rapid changeable situation. Even though government has made his efforts as stated above, some clients have uniformly used those to public construction projects. That is because there are not selection criteria of project delivery system for clients. Therefore, this study presented the selection criteria of project delivery system based on project types in the public large construction projects. In addition, the study has verified the viability of the presented models through consultation with professionals and experts.

  • PDF

Examining the PMIS Impacts on the Project Performance, User Satisfaction and Reuse Intention among the Project based Industries (프로젝트 성과, 사용자 만족도 및 재사용의도에 미치는 PMIS의 산업별 영향 비교)

  • Park, So-Hyun;Lee, Ayeon;Kim, Seung-Chul
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.3
    • /
    • pp.276-287
    • /
    • 2021
  • Project Management Information System (PMIS) is a special purpose information system that is created to provide useful information for project managers and participants to make effective and efficient decision making during projects. The use of PMIS is increasing in project based industries such as construction, defense, manufacturing, software development, telecommunication, etc. It is generally known that PMIS helps to improve the quality of decision making in project management, and consequently improves the project management performance. However, it is unclear what are the difference of PMIS impacts between industries, and still need to be studied further. The purpose of this study is to compare the impact of PMIS on project management performance between industries. We assume that the effects of PMIS will be different depending on the industry types. Five hypotheses are established and tested by using statistical methods. Data were collected by using a survey questionnaire from those people who had experience of using PMIS in various project related industries such as construction, defense, manufacturing, software development and telecommunication. The survey questionnaire consists of 5 point scale items and were distributed through e-mails and google drive network. A total of 181 responses were collected, and 137 were used for analysis after excluding those responses with missing items. Statistical techniques such as factor analysis and multiple regression are used to analyze the data. Summarizing the results, it is found that the impacts of PMIS quality on the PM performance are different depending on the industry types where PMIS is used. System quality seems to be more important for improving the PM performance in construction industry while information quality seems more important for manufacturing industry. As for the ICT and R&D industries, PMIS seems to have relatively lesser impact compared to construction and manufacturing industries.

An Analysis of Construction Execution Tasks for Successful Residential Mechanical Projects (프로젝트 성공을 위한 효과적인 시공업무 및 영향 분석 - 아파트 설비공사를 중심으로 -)

  • Kang, Sang-Hun;Kim, Dae Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.60-67
    • /
    • 2019
  • The main purpose of this study is to identify the tasks performed at the construction stage of apartment houses and analyze the major construction tasks that may affect the performance indicators and analyze the impact on project performance. Based on expert opinions through preliminary research, pilot data, construction database, and other research trends, domestic and foreign research trends are divided into five major tasks, and each is divided into process management (P'1 ~ P'6), construction management (C'1 ~ C'5), environmental management (E'1 ~ E'4), quality control (Q'1 ~ Q'5), safety management (S'1 ~ S'5). Subsequently, each major task was subdivided into 24 detailed tasks. An independent t-test was conducted to analyze the impact on cost. We compared the importance of achieving the project goal and identified the construction work of concrete important construction which affects not only the cost but also the schedule performance index for the degree of significance of less than 0.05.

An Evaluation Model of IT PMO Performance Using Pentagon Model (Pentagon Model을 활용한 정보화 프로젝트 PMO의 성과평가 모형 제시)

  • Kim, Ki-Hyun;Park, Geun-Wan;Hwang, Seung-June
    • The Journal of Society for e-Business Studies
    • /
    • v.21 no.4
    • /
    • pp.119-136
    • /
    • 2016
  • Precedent studies revealed that success of IT project strongly depends on the competency of PMO(project management offices), however, there are only few studies which show the importance of PMO competency. In this study, we will suggest an evaluation model of IT PMO competency using the Pentagon Model which is a tool to assess the performance of project organization, and the Analytic Hierarchy Process. We classified effect factor of PMO competency into 25 items in 5 fields such as Structure, Technology, Culture, Interaction, Social Relations and Networks based on pentagon model, also analysis of criticality between the effect factors was conducted by AHP. The study result shows 3 factors of Structure were included in the top 10, while 2 factors of Technology, Culture, Interaction were included separately. In terms of Social Relations and Networks, only 1 factor was included in the top 10. Therefore Structure of PMO should be aggressively considered for the successful IT project.

A Study on Policies of the Ordering and Receiving System for Public e-Learning Project in Korea (공공 이러닝 프로젝트 수발주시스템 정책에 관한 연구)

  • Noh, Kyoo-Sung;Ju, Seong-Hwan
    • Journal of Digital Convergence
    • /
    • v.12 no.3
    • /
    • pp.29-36
    • /
    • 2014
  • The purpose of this study is to suggest a proper improvement direction of the public ordering and receiving system in related with e-Learning. The research methods for this paper are derived from survey about e-Learning companies and the written materials of the present public e-Learning project. According to the study, in most cases, the public e-Learning projects don't affect positively e-Learning company's businesses. It indicates that the public e-Learning project has three problems or improvement items. And as a solution to the problems, it presented the policy alternatives the policy alternatives as the concept of ordering and receiving system.