• Title/Summary/Keyword: E-Project Management

Search Result 524, Processing Time 0.028 seconds

A Study on the Effect of PMO Capability and Organization Justice on IT Project Performance (PMO의 역량과 조직공정성이 IT 프로젝트 성과에 미치는 영향에 관한 연구)

  • Kim, Ki-Hyun;Park, Geun-Wan;Hwang, Seung-June
    • The Journal of Society for e-Business Studies
    • /
    • v.21 no.3
    • /
    • pp.129-151
    • /
    • 2016
  • The objective of this study is to examine the relationship of organizational justice, project performance and internal and external PMO (Project Management Office) capability by conducting survey of IT project participants worked with PMO. This study was the first case which classifies PMO capability into internal and external by ownership of PMO. PLS-SEM analysis, which used for this study shows internal PMO capability connects with distributive justice and procedural justice, and directly related to project performance. By comparison, external PMO capability has relationship only with procedural justice, but never related to project performance. Furthermore, distributive justice and procedural Justice all have correlation with project performance. In general, capability of external professional consulting firms is utilized for the fairness and objectivity in spite of sufficient internal project management capability. However, the internal PMO capability has greater influence on procedural justice than external's (internal PMO capability > external PMO capability). Also, distributive justice and project performance have direct correlation only with the internal PMO capability. This paper will be an indicator of finding human capabilities which are necessary for internal and external PMO performance, and has great significance of laying a groundwork of project management strategy by PMO.

GIS for Agricultural Project and Program Evaluation

  • Punyaratabandhu, Sompit
    • Proceedings of the KSRS Conference
    • /
    • 2003.11a
    • /
    • pp.38-40
    • /
    • 2003
  • Project monitoring and evaluation is very important, as it can be used to indicate progress and success, including problems and impact of the project. It can also be used for improving project plan, administration, and management. GIS is the visualization method that is extremely helpful in decision making and planning. So GIS is an appropriate tool for agricultural project and program monitoring and evaluation. There are three ways of using GIS in project undertakings i.e. GIS for feasibility studies, GIS for project and program monitoring, and GIS for project and program evaluation.

  • PDF

Development of Learning Model for Knowledge Management in Construction Area (건설분야의 지식관리 적용을 위한 학습모델 개발)

  • Jung In-Su;Kim Byung-Kon;Na Hei-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.1 s.9
    • /
    • pp.65-73
    • /
    • 2002
  • By its nature, software part of the construction industry such as engineering and so forth has been kept secret to outside, as it determines a company$^{\circ}{\phi}s$ competitiveness. As a result, construction field knowledge usually disappears with the end of a project. The objective of this study is to develop the knowledge management (BM) learning model tuned in to construction area in order to manage project-related knowledge and promote the knowledge management. This study presented a learning model for knowledge management in the construction field, with the aim to integrate a series of processes. The model is composed of EIP, EDMS, knowledge and failure cases management, CoP and e-Learning.

Decision Support System for Project Duration Estimation Model (프로젝트기간예측모델을 위한 의사결정지원시스템)

  • 조성빈
    • Journal of Intelligence and Information Systems
    • /
    • v.6 no.2
    • /
    • pp.91-98
    • /
    • 2000
  • Despite their wide application of some traditional project management techniques like the Program Evaluation and Review Technique, they lack of learning, one of important factors in many disciplines today, due to a static view for project progression. This study proposes a framework for estimation by loaming based on a Linear Bayesian approach. As a project Progresses, we sequentially observe the durations of completed activities. By reflecting this newly available information to update the distribution of remaining activity durations and thus project duration, we can implement a decision support system that updates e.g., the expected project completion time as well as the probabilities of completing the project within the due bate and by a certain date. By implementing such customized system, project manager can be aware of changing project status more effectively and better revise resource allocation plans.

  • PDF

Conceptual WBS Model for a Large-Scale Information System Acquisition Project (대규모 정보시스템 개발 프로젝트를 위한 개념적 작업분담구조도의 모형화에 관한 연구)

  • Nam Yong Lee
    • The Journal of Society for e-Business Studies
    • /
    • v.6 no.1
    • /
    • pp.55-67
    • /
    • 2001
  • Over the past decade, the topic of work breakdown structure (WBS) has gained an increasing amount of attention from information technology Professionals as an effective tool for managing the complexity of a large-scale information system development project. It is a method for planning and controlling a large-scale information system development. A WBS provides the basis for project organization, cost estimation, task scheduling, and contract management. Based on the authors' practical experience, this paper discusses how to establish a specific WBS and some considerations for developing a well-defined WBS. The model of WBS suggested in this study will provide useful insight and guidelines for establishing the spec-ific WBS for a large-scale information systems development.

  • PDF

TAGUCHI OPTIMIZATION OF DISPLACEMENTS DURING THE DESIGN PHASE OF A CONSTRUCTION PROJECT

  • E.S. N. Telis;G. J. Besseris
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.721-728
    • /
    • 2007
  • The prediction of quality characteristics during the design phase of a construction project was fragmented, because no particular method exists. One of the most important key responses is the total displacements (horizontal and vertical). A brainstorming session produces the quality parameters i.e. the control factors which here are identified as: the steel joint, the pile's length, the excavation depth and angle, the distance between the piles, the anchor stretch and length to name just some of the most engaging in the design. The purpose of this study is to optimise these parameters to minimize the total displacements following a methodology based on Taguchi method. For this reason, a 2-level, L8 orthogonal array has been employed to organize the experimentation. Data is obtained from a real-life excavation project designed on the Plaxis v.8 CAE package. Taguchi analysis is performed in the statistical package Minitab.

  • PDF

Quantifying Risk Factors on Cost Performance By Characterizing Capital Facility Projects

  • Jang, Myung-Hoon;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.177-183
    • /
    • 2006
  • Risk-based estimation has been successfully introduced into the construction industry. By incorporating historical data associated with probability analysis, risk-based estimate is an effective decision support aid in considering whether to launch a particular project. The industry challenges, however, especially related with management issues, such as labor shortage, wage growth, and supply chain complexity, have often resulted in poor cost performance. The insufficient assessing the project characteristics (i.e., resource availability, project complexity, and project delivery method) can be the main reasons in the poor cost performance. Because the accuracy level of cost performance prediction can be enhanced by extensive evaluation of the subject project characteristics, a new approach for predicting cost performance in an earlier stage of a project can improve the Industry substantiality, in other words, value maximization. The purpose of this paper is to develop a new methodology in developing a risk-based estimate tool by incorporating extensive project characteristics. To do this, an extensive industry survey was conducted from both private and public sectors in building industry in Korea. In addition, significant project characteristics were identified in terms of cost performance indicator. Although the data collection is limited to Korean industry the suggested approach provides the industry with a straightforward methodology in risk management. As many researchers maintained that front-end planning efforts are crucial in achieving the successful outcome in building projects, the new method for risk-based estimation can Improve the cost performance as well as enhance the fulfillment in terms of business sustainability.

Ordering of Project priorities For Open Market Portfolio (오픈마켓 포트폴리오 관리를 위한 프로젝트 우선순위결정)

  • Lee, Yong-Hee;Lee, Gun-Ho
    • The KIPS Transactions:PartD
    • /
    • v.18D no.4
    • /
    • pp.299-308
    • /
    • 2011
  • In the recent years, a variety of projects have been conducted in order to enhance competitiveness of leading businesses and their followers in the market. Accordingly, the importance of project portfolio management has risen in the open market industry. Project portfolio management refers to crucial decision-making processes which aim to maximize benefits by selecting projects most suitable for a strategic objective among multiple projects with limited resources. In this study, the trend of project portfolio management studies is introduced. The study also presents a mathematical model of the problem, which aims at maximizing project values, possibility, and similarity between projects in the limited resources. We use the genetic algorithm to obtain the priority orders of projects. In order to verify this study, we compare the results of this study and the existing schedules of the E-open market in South Korea. This study ultimately reduces project risks, improves efficiency of development and continuity of tasks by properly ordering projects and assigning developers to the projects.

Optimizing Construction Alternatives for Scheduling Repetitive Units

  • Park, Sang-Min;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.158-160
    • /
    • 2015
  • Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of existing time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes to cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.

  • PDF

Decision Support System for Project Duration Estimation Model (프로젝트기간 예측모델을 위한 의사결정 지원시스템)

  • 조성빈
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 2000.11a
    • /
    • pp.369-374
    • /
    • 2000
  • Despite their tilde application of some traditional project management techniques like the Program Evaluation and Review Technique, they lack of learning, one of important factors in many disciplines today due to a static view far prefect progression. This study proposes a framework for estimation by learning based on a Linear Bayesian approach. As a project progresses, we sequentially observe the durations of completed activities. By reflecting this newly available information to update the distribution of remaining activity durations and thus project duration, we can implement a decision support system that updates e.g. the expected project completion time as well as the probabilities of completing the project within talc due date and by a certain date. By Implementing such customized systems, project manager can be aware of changing project status more effectively and better revise resource allocation plans.

  • PDF