• Title/Summary/Keyword: Dynamic Demand for Facility

Search Result 20, Processing Time 0.022 seconds

Dynamic Experiment for Mode Shape of Pilot LNG Storage Tank (Pilot LNG저장탱크의 모드 형상 파악을 위한 동특성 실험)

  • Lee Kangwon;Hong Seongho;Kim Young Kyun;Kim Ji Hoon
    • Journal of the Korean Institute of Gas
    • /
    • v.7 no.3 s.20
    • /
    • pp.18-23
    • /
    • 2003
  • The demand of LNG in Korea has dramatically increased since it was first imported in 1986. Thus, more LNG storage tanks are required to meet the growing consumption of LNG. However the design, construction, and analysis of LNG storage facility need highly advanced technology compared to the general structures due to the fluid-structure interaction and the low temperature of LNG. Recently Korea Gas Corporation(KOGAS) constructed a pilot LNG storage tank, and it is in operation to develop and accumulate the core technology. As a part of those objects, the fundamental dynamic test for the pilot tank were performed. For this study, dynamic test were carried out and the dynamic characteristics of the pilot tank were verified and analyzed.

  • PDF

Dynamic Peak Load Calculation for Friendly Environment Energy Supply and Demand Plan at the Newport Area in Busan (부산 신항만지역 환경친화적 에너지 수급을 위한 동적 열부하계산)

  • Yee, Jurng-Jae;Lee, Sun-Ae;Cho, Yong-Soo;Doe, Geun-Young
    • Journal of Navigation and Port Research
    • /
    • v.28 no.3
    • /
    • pp.269-276
    • /
    • 2004
  • The reclaimed land has peculiar characteristic of nature environment unlike midtown or inland and also, in comparison with inland, has bad weather condition, such as low temperature, strong wind, excessive sunshine, and moisture involved in a salt. Therefore the case of developing water front needs understanding characteristic of weather environment mused by reclamation in detail and proper development and organized maintenance. If development which doesn't investigate topographic and climate characteristic sufficiently is drove ahead, a rise of expense for energy and maintenance is going to be mused by deteriorating weather environmental, occurring a flaw of facility and calculating inaccurate capacity of facility. We looked into the weather state and drew up the standard weather data of the newport area in Busan which is reclaiming and developing now. In this research at the base qf the standard weather data, we calculate the dynamic peak loads for commerce, business and residence and then we utilize the results of the load calculation as basic information to determine facility capacity in the rear city of the newport area.

Sensitivity Analysis Study of Geotechnical Factors for Gas Explosion Vibration in Shallow-depth Underground Hydrogen Storage Facility (저심도 지하 수소저장소에서의 가스 폭발 진동에 대한 지반공학적 인자들의 민감도 분석 연구)

  • Go, Gyu-Hyun;Woo, Hyeon‑Jae;Cao, Van-Hoa;Kim, Hee-Won;Kim, YoungSeok;Choi, Hyun-Jun
    • Journal of the Korean Geotechnical Society
    • /
    • v.40 no.4
    • /
    • pp.169-178
    • /
    • 2024
  • While stable mid- to large-scale underground hydrogen storage infrastructures are needed to meet the rapidly increasing demand for hydrogen energy, evaluating the safety of explosion vibrations in adjacent buildings is becoming important because of gas explosions in underground hydrogen storage facilities. In this study, a numerical analysis of vibration safety effects on nearby building structures was performed assuming a hydrogen gas explosion disaster scenario in a low-depth underground hydrogen storage facility. A parametric study using a meta-model was conducted to predict changes in ground dynamic behavior for each combination of ground properties and to analyze sensitivity to geotechnical influencing factors. Directly above the hydrogen storage facility, the unit weight of the ground had the greatest influence on the change in ground vibration due to the explosion, whereas, farther away from the facility, the sensitivity of dynamic properties was found to be high. In addition, in evaluating the vibration stability of ground building structures based on the predicted ground vibration data and blasting vibration tolerance criteria, in the case of large reinforced concrete building structures, the ground vibration safety was guaranteed with a separation distance of about 10-30 m.

An analysis on the surface roughness and residual stress of SUS-304 using abrasive film polishing (Abrasive Film Polishing을 이용한 SUS-304의 표면거칠기·잔류응력 분석)

  • Shin, Bong-Cheol;Kim, Byung-Chan;Lim, Dong-Wook;Min, Kyung-Ho
    • Design & Manufacturing
    • /
    • v.12 no.2
    • /
    • pp.16-21
    • /
    • 2018
  • Recently, as the demand for high-precision parts increases due to industrial development, a machine tool system for ultra-precision machining and polishing has been actively developed. As a result, there is an increasing demand for ultra-precision surface roughness along with dimensional processing. However, due to the increase in processing time due to the demand for ultra-precise surfaces and enormous facility investment, it is difficult to secure competitiveness. The polishing process using the abrasive film in super precision machining has been applied to machines, electronic devices, aerospace, and medical fields. Super finishing using the abrasive film which is applied in the industrial field recently can achieve high surface roughness in a short time. Super finishing using the abrasive film which is applied in the industrial field recently can achieve high surface roughness in a short time. Also, application of industrial field is increasing due to advantages such as low noise and low dust. Recently, researches on stainless steel having strong resistance to corrosion, heat resistance, heat resistance, toughness and weldability have been actively conducted with respect to the nuclear energy industry or marine development. Therefore, in this study, surface roughness and residual stress were measured after SUS304 polishing using dynamic analysis of film polishing apparatus and polishing film.

Multi-level UnderVoltage Load Shedding Scheme Considering Rate of Change of Voltage for Voltage Stability (전압 변동률을 고려한 수도권 전압 안정화 다단계 부하차단 적용 방안)

  • Lee, Yun-Hwan;Kim, Tae-Gyun;Kim, Ji-Hun;Lee, Byong-Jun;Kang, Bu-Il;Cho, Jong-Man
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.12
    • /
    • pp.2335-2341
    • /
    • 2009
  • High technique growth of modem times and high industrial facility in consequence of buildings demand for electric power of an extensive scale with stability supply and maintenance of high quality. But, power system always have risk of network contingency. When power system break out disturbance, it circumstantially happen like uncontrolled loss of load developing from of cascading. Severely which would be raised wide area blackout, plan to prevent, which make stability through a little of load shedding and multi-level UnderVoltageLoadShdding should work. This paper presents target, sensitivity of bus voltage have choose appropriating load shedding location and load shedding decision making logic with considering rate of change of voltage have studied multi-level under voltage load shedding scheme. Calculation of rate of change of voltage applied method of least square. As a result, we are studied an dynamic analysis of 2008 summer peak data. We have been known that network analysis is a little development and developing UnderVoltageLoadShedding scheme.

Minimization of Pump Running Cost in the Large-scale Water Supply System (광역상수도 계통의 Pump 운전비용 최소화)

  • Lee, Gwang-Man;Kang, Shin-Uk;Kim, Soo-Myung
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.9
    • /
    • pp.759-771
    • /
    • 2009
  • The electricity cost of pumping system accounts for a large part of the total operating cost for long distance water supply networks. This study presents a method based on dynamic programming for establishing an joint optimal operation of pumps and storages system on a hourly basis. Analysis is taken of the relative efficiencies of the available pumps, the structure of the electricity tariff, the consumer-demand pattern, and the storage characteristics and operational constraints of the pipe. The possible system objectives and constraints are described. An application of the method to the existing Yangju Water Supply System consisted of two pump station and 5 storage pools under the condition of expanding pumping facility in the part of the Capital Area Water Supply System is presented, showing that considerable electricity cost savings are remarkable. The approach was found to be implementable in real system operation and large-scale water supply system design in respect of minimizing life-cycle total cost.

Design of HUST-PTF beamline control system for fast energy changing

  • Li, Peilun;Li, Dong;Qin, Bin;Zhou, Chong;Han, Wenjie;Liao, Yicheng;Chen, Aote
    • Nuclear Engineering and Technology
    • /
    • v.54 no.8
    • /
    • pp.2852-2858
    • /
    • 2022
  • A proton therapy facility is under development at Huazhong University of Science and Technology (HUST). To meet the need for fast energy changes during treatments, a beamline control system (BCS) has been designed and implemented. The BCS coordinates and controls various beamline devices by adopting a distributed architecture divided into three layers: the client, server, and device layers. Among these, the design of the server layer is the key to realize fast energy changes. The server layer adopts the submodule programming paradigm and optimizes the data interface among modules, allowing the main workflow to be separated from the device workflow and data. Furthermore, this layer uses asynchronous, multithreaded, and thread-locking methods to improve the system's ability to operation efficiently and securely. Notably, to evaluate the changing energy status over time, a dynamic node update method is adopted, which can dynamically adjust the update frequency of variable nodes. This method not only meets the demand for fast updates on energy changes but also reduces the server's communication load in the steady state. This method is tested on a virtual platform, and the results are as expected.

Fuel Spiking Test for the Surge Margin Measurement in a Gas Turbine Engine (연료 돌출 시험에 의한 가스터빈엔진의 서지마진 측정)

  • Lee, Jin-Kun;Lee, Kyung-Jae;Ha, Man-Ho;Kim, Chun-Taek;Yang, Soo-Seok;Lee, Dae-Sung
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.8 no.2
    • /
    • pp.18-24
    • /
    • 2004
  • A fuel spiking test was performed to measure the surge margin of the compressor in a gas turbine engine. During the test, fuel spiking signal is superposed on the engine controller demand signals and the combined signals are used to control a fuel control valve. For the superposition, a subsystem composed of a fuel controller and a function generator is used. The real engine test was performed at the Altitude Engine Test Facility (AETF) in Korea Aerospace Research Institute (KARI). In the preliminary test, the fuel spiking signals are in good agreement with the dynamic pressure at the fuel line and at the compressor discharge point. After the preliminary test, a fuel spiking test to measure the surge point at a specific engine speed was performed. The test results show that the fuel spiking test is very effective in the measurement of surge.

A Fuel Spiking Test for the Surge Margin Measurement in Gas Turbine Engines

  • Lee, Jinkun;Kim, Chuntaek;Sooseok Yang;Lee, Daesung
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2004.03a
    • /
    • pp.380-384
    • /
    • 2004
  • A fuel spiking test was performed to measure the surge margin of the compressor in a gas turbine engine. During the test, fuel spiking signal was superimposed on the engine controller demand and the mixed signals were used to control a fuel line servo-valve. For the superimposition, a subsystem composed of a fuel controller and a function generator was used. During the fuel spiking test, the original scheduled fuel signals and the modified signals were compared to guarantee the consistency excluding the spiking signals. The spiking signals were carefully selected to maintain the engine speed constant. The fuel spiking effects were checked by three dynamic pressure sensors. Sensors were placed before the servo-valve, after the servo-valve, and after the compressor location, respectively. The modulations of the spiking signal duration and fuel flow rate were examined to make the- operating point approach the surge region. The real engine test was performed at the Altitude Engine Test Facility (AETF) in Korea Aerospace Research Institute (KARI). In the real engine test, fuel spiking signals with 25~50 ㎳ of spiking signal time and 17~46 % of base fuel flow rate condition were used. The dithering signal was 5~6 ㎃ at 490 Hz. The test results showed good agreement between the fuel spiking signals and the fuel line pressure signals. Also, the compressor discharge pressure signals showed fuel spiking effects and the changes of the operating point on the compressor characteristic map could be traced.

  • PDF

Assessment of the Structural Collapse Behavior of Between Offshore Supply Vessel and Leg in the Jack-up Drilling Rig (잭업드릴링 리그의 레그와 작업 지원선 충돌에 의한 구조붕괴 거동 평가)

  • Park, Joo-Shin;Seo, Jung-Kwan
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.28 no.4
    • /
    • pp.601-609
    • /
    • 2022
  • Jack-up drilling rigs are mobile offshore platforms widely used in the offshore oil and gas exploration industry. These are independent, three-legged, self-elevating units with a cantilevered drilling facility for drilling and production. A typical jack-up rig includes a triangular hull, a tower derrick, a cantilever, a jackcase, living quarters and legs which comprise three-chord, open-truss, X-braced structure with a spudcan. Generally, jack-up rigs can only operate in water depths ranging from 130m to 170m. Recently, there has been an increasing demand for jack-up rigs for operating at deeper water levels and harsher environmental conditions such as waves, currents and wind loads. All static and dynamic loads are supported through legs in the jack-up mode. The most important issue by society is to secure the safety of the leg structure against collision that causes large instantaneous impact energy. In this study, nonlinear FE -analysis and verification of the requirement against collision for 35MJ recommended by DNV was performed using LS-Dyna software. The colliding ship used a 7,500ton of shore supply vessel, and five scenarios of collisions were selected. From the results, all conditions do not satisfy the class requirement of 35MJ. The loading conditions associated with chord collision are reasonable collision energy of 15M and brace collisions are 6MJ. Therefore, it can be confirmed that the identical collision criteria by DNV need to be modified based on collision scenarios and colliding members.