• 제목/요약/키워드: Duration Curve

검색결과 445건 처리시간 0.027초

오염부하지속곡선을 이용한 팔당호 수질항목별 중점관리 시점 선정 (Determination of Important Parameter Control Term for Paldang Lake Water Quality Management using Load Duration Curves)

  • 김동우;장미정;박지형;한인섭
    • 한국물환경학회지
    • /
    • 제29권6호
    • /
    • pp.762-776
    • /
    • 2013
  • Load duration curve was applied to determine important water quality parameter control term for improvement of Paldang lake water quality. Load duration curve was analyzed with long term data from 1985 to 2012 including water quality, flow rate and climate state of Paldang water environment. From the result of flow rate patterns of paldang lake, differences between high and low flow rate of each year showed tendency of increase because rainfall characteristics of paldang lake watershed were changed by climate exchange. Both of land use state of upper Paldang lake watershed and number of limit excess from load duration curve indicated that seasonal action related with land use such as agricultural fertilizer distribution in upper watershed affected Paldang lake water quality. So focused BOD (biological oxygen demand) management during spring season from march to June is required to control organic materials in Paldand lake. The main affecting factor of TOC (total organic carbon) increase in Paldang lake was initial rainfall after march. T-N (total nitrogen) kept increasing during research period, so enhancement of T-N standard is needed to T-N control. Initial rainfall and increase of temperature during spring season from March to June showed a positive correlation with TP (total phosphorus) and Chl-a, respectively.

Assessment of Pollution Levels in the Jangsungcheon Watershed Using Load Duration Curves and Analysis of the Causes

  • Cho, Sohyun;Bak, Jonghun;Lee, Yeong Jae;Kim, Kyunghyun;Jung, Kang Young
    • 한국환경과학회지
    • /
    • 제28권10호
    • /
    • pp.873-885
    • /
    • 2019
  • In this study, a load duration curve was applied to the Jangseongcheon, one of the tributaries of the Yeongsan River, to assess whether the target water quality was achieved. In addition, pollution of the water body was investigated to develop and suggest the optimal management time with respect to polluted flow sections and monthly conditions. The average flow rates of sections JS1 and JS2 were $0.25m^3/s$ and $1.08m^3/s$, respectively. The BOD and T-P for water-quality standards at JS1 were rated at II, whereas the COD and TOC were rated at III, thus indicating a fair level of water quality. By contrast, the BOD at JS2 was rated at III, the T-P at IV, and the TOC at V, indicating poor water quality in this section. The load duration curve was plotted using the actual flow data measured in eight-day intervals for eight years from 2011 to 2018 at locations JS1 and JS2 in the Jangsungcheon Basin. In an assessment using the load duration curve on whether the target water quality was met at location JS1, all of the water quality parameters (BOD, COD, TOC, T-N, T-P, and SS) satisfied the target water quality. By contrast, at location JS2, parameters COD, TOC, T-N, and T-P exceeded target values by more than 50%, indicating the target water quality was not met. The discharge loads of locations JS1 and JS2 were analyzed to identify the reasons the target water quality was exceeded. Results revealed that the land system contributed considerably. Furthermore, the discharge load of JS2 accounted for more than 80% of the load on the entire basin, excluding that of JS1. Therefore, the best method for restraining the inflow of pollutants into the stream near location JS2 must be applied to manage the water quality of the Jangsungcheon.

소수력발전소의 성능예측 기법 (A Study on the Performance Prediction Technique for Small Hydro Power Plants)

  • 박완순;이철형
    • 한국수소및신에너지학회논문집
    • /
    • 제14권1호
    • /
    • pp.61-68
    • /
    • 2003
  • This paper presents the methodology to analyze flow duration characteristics and performance prediction technique for small hydro power(SHP) Plants and its application. The flow duration curve can be decided by using monthly rainfall data at the most of the SHP sites with no useful hydrological data. It was proved that the monthly rainfall data can be characterized by using the cumulative density function of Weibull distribution and Thiessen method were adopted to decide flow duration curve at SHP plants. And, the performance prediction technique has been studied and development. One SHP plant was selected and performance characteristics was analyzed by using the developed technique, Primary design specfications such as design flowrate, plant capacity, operational rate and annual electricity production for the SHP plant were estimated, It was found that the methodology developed in this study can be a useful tool to predict the performance of SHP plants and candidate sites in Korea.

소수력발전소의 성능예측 (A Study on the Performance Prediction for Small Hydro Power Plants)

  • 박완순;이철형
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2005년도 춘계학술대회
    • /
    • pp.448-451
    • /
    • 2005
  • This paper presents the methodology to analyze flow duration characteristics and performance prediction for small hydro power(SHP) plants and its application. The flow duration curvecan be decided by using monthly rainfall data at the most of the SHP sites with no useful hydrological data. It was proved that the monthly rainfall data can be characterized by using the cumulative density function of Weibull distribution and Thiessen method were adopted to decide flow duration curve at SHP plants. And, the performance prediction has been studied and development. One SHP plant was selected and performance characteristics was analyzed by using the developed technique. Primary design specfications such as design flowrate, plant capacity, operational rate and annual electricity production for the SHP plant were estimated. It was found that the methodology developed in this study can be a useful tool to predict the performance of SHP plants and candidate sites in Korea.

  • PDF

주식 거래 자료 분석을 위한 ACD 모형 성능 비교 (Performance Evaluation of the ACD Models for Analysing the Transaction Data of the KOSPI Stocks)

  • 김삼용;정다운
    • Communications for Statistical Applications and Methods
    • /
    • 제16권1호
    • /
    • pp.21-29
    • /
    • 2009
  • Engle과 Russell (1998)의 ACD 모형은 재무학에서 가격과 거래 시간의 밀접한 관계에 대한 관심을 불러 일으켰다. ACD 모형은 GARCH 모형과의 유사성을 바탕으로 Box-Cox 변환과 충격 함수 곡선(shocks impact curve)을 적용시켜 Log ACD, Power ACD, Box-Cox ACD 등과 같은 보다 유연한 모형으로 일반화될 수 있다. 본 연구에서는 이와 같이 일반화된 ACD 모형들을 국내 주식시장에서 거래되고 있는 주식의 price duration에 적용시켜 그 성능을 비교해보고자 한다.

영천댐 건설이 금호강의 어류 서식환경에 미치는 영향에 관한 평가 (An Evaluation of Fish Habitat Conditions due to the Construction of Youngchun Dam in the Gumbo River)

  • 박봉진;성영두;정관수
    • 한국수자원학회논문집
    • /
    • 제38권9호
    • /
    • pp.771-778
    • /
    • 2005
  • 금번 연구에서는 금호강의 금호 수위관측소 지점에서 영천댐 건설에 따른 유황분석을 하였다. 분석 결과, 영천댐 건설 전에는 갈수랑 $10.49\;m^3/s$, 저수량 $13.30\;m^3/s$, 평수랑 $15.65\;m^3/s$, 풍수량 $25.00\;m^3/s$ 이었으나, 건설 후에는 갈수량이 $2.07\;m^3/s$, 저수랑 $2.89\;m^3/s$, 평수량 $4.0\;m^3/s$, 풍수량 $9.36\;m^3/s$ 으로 유황이 상당히 열악해 진 것으로 분석되었다. 유지유량 증분법의 물리적 서식처모의 모형을 적용하여 피라미의 성장단계별 가중된 가용면적-유량 관계곡선을 작성하였다. 이 관계곡선으로 유지 가능일 수를 초과확률로 가중된 가용면적의 서식처 현황곡선을 작성하고, 영천댐건설에 따른 하천의 유황변화가 어류 서식환경에 미치는 영향을 평가하였다. 평가결과, 산란기와 성어기 모두 영천댐건설에 따라 가중된 가용면적이 감소하여 어류 서식환경이 저하되었다. 그러나 산란기중 유량의 초과확률 $90\;\%$ 이상에서는 영천댐에서 하류지역의 관개용수를 공급함으로써 유황이 개선되고 가중된 가용면적도 증가하여 어류서식환경이 개선된 것으로 평가되었다.

재현기간별 설계유효우량의 지속기간결정 (A Determination of the Rainfall Durations of Various Recurrence Intervals)

  • 윤용남;전병호
    • 물과 미래
    • /
    • 제12권2호
    • /
    • pp.56-62
    • /
    • 1979
  • 강우자료로부터 설계 홍수량을 추정하는 많은 방법들은 설계강우량의 지속기간 결정에 매우 복잡한 시행 착오법을 사용하고 있으나, 본 연구에서는 순간단위유량도 이론을 적용한 해석적 방법에 의하여 근사 지속기간을 결정하는 방법을 이론적으로 전개하였다. 이렇게 유도된 방법을 무심천 대표유역에 적용하여 교점유량비곡선(hydrograph curve)과 재현기간별로 설계강우곡선(rainfall curve)을 계산하고, 그 결과를 동일 좌표상에 그려 그 교점이 표시하는 유효우량 지속기간을 결정하였다.

  • PDF

공사 진행단계별 기울기 추정을 통한 최종 공사비 및 공기 예측 (Prediction of Final Construction Cost and Duration by Forecasting the Slopes of Cost and Time for Each Stage)

  • 진의재;곽수남;김두연;김형관;한승헌
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.137-142
    • /
    • 2006
  • 비용과 공기는 수익과 직접적인 상관관계를 갖는 중요한 요소로 성공적인 프로젝트를 위해서는 이들에 대한 정확한 예측이 이루어져야 한다. 현재 최종 공사비와 공기 예측을 목적으로 EVMS(Earned Value Management System)가 범용적으로 활용되고 있지만, 기존에 제시된 공사비 및 공기 예측모텔은 선형적인 예측방식을 사용하기 때문에 예측결과가 부정확하고 시공업체의 성향, 프로젝트의 특성, 진도율에 따른 변화 등을 고려하지 못하는 한계가 있었다. 본 연구에서는 건설산업의 다양한 특성이 반영될 수 있도록 PB-S curve와 다중회귀분석을 이용한 진행단계별 공사비 및 공기의 기울기 예측모델을 제안하고 이를 동해 최종 공사비 및 공기를 예측하고자 한다. 이를 위하여 국내 건설업체로부터 23건의 도로공사 EVMS 자료를 활용하여 공사 진행단계별 기울기 예측을 위한 회귀분석방정식을 도출하고, 활용성을 검증하였다.

  • PDF

공주지역의 강우강도-지속기간-빈도곡선 개발 (Development of the Intensity-Duration-Frequency Curve at Kong-Ju Area)

  • 정상만;박석재;유찬종
    • 한국방재학회 논문집
    • /
    • 제2권2호
    • /
    • pp.85-93
    • /
    • 2002
  • 본 연구는 공주지역의 한국확률강우량도를 이용하여 확률강우량을 산정한 후 강우강도-지속기간-빈도곡선식을 개발하는데 목적이 있다. 공주지역의 재현기간별 확률강우강도식의 산정결과 강우강도식은 장 단기간으로 구분하는 것이 타당하였고, 강우강도식의 신뢰성을 설명하는 장기간의 결정계수($R^2$)는 $0.9924{\sim}0.9971$로써 매우 높게 나타나고 있기 때문에 본 연구에서 제시한 재현기간별 확률강우강도식이 상당히 의미 있는 것으로 사려된다. 공주지역의 확률강우강도식은 최소자승법을 사용하여 Talbot형, Sherman형, Japanese형, 일반형의 4가지로 분석한 결과 본 연구에서 적용한 Sherman형이 가장 적합한 것으로 나타났다. 따라서 공주지역의 수공구조물 설계시 본 연구에서 산정된 재현기간별 확률강우강도식을 이용함으로써 보다 정도가 높은 설계를 할 수 있으리라 판단된다.

수질오염총량 단위유역별 LDC(Load Duration Curve, 부하지속곡선) 적용을 통한 수질관리 대안 모색 - 금호강 유역 대상 (Water Quality Management Measures for TMDL Unit Watershed Using Load Duration Curve)

  • 윤소영;류재나;오재일
    • 상하수도학회지
    • /
    • 제27권4호
    • /
    • pp.429-438
    • /
    • 2013
  • This study was to develop effective water quality management measures using LDC (Load Duration Curve) curves for TMDL (Total Maximum Daily Loads) unit watershed. Using LDC curves, major factors for BOD and T-P concentration loads generation (i.e. point source or non-point source) in the case study area (Geumho river basin) were found for different hydrologic conditions. Different measures to deal with the pollutant loads were suggested to establish BMPs (Best Management Practices). It was found that the target area has urgent T-P management methods especially at moist and midrange hydrologic conditions because of point source pollutants occurred in developed areas. One example measure for this could be establishment of advanced treatment facility. This study proved that the use of LDC was a useful way to achieve TWQ (Target Water Quality) on the target watershed considered. It was also expected that the methodology applied in this study could have a wider application on the establishment of watershed water management measures.