• Title/Summary/Keyword: Duration Curve

Search Result 445, Processing Time 0.025 seconds

Estimation of Pollutant Loads Delivery Ratio by Flow Duration Using Regression Equation in Hwangryong A Watershed (회귀식을 이용한 황룡A 유역에서의 유황별 유달율 산정)

  • Jung, Jae-Woon;Yoon, Kwang-Sik;Joo, Seuk-Hun;Choi, Woo-Young;Lee, Yong-Woon;Rhew, Doug-Hee;Lee, Su-Woong;Chang, Nam-Ik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.51 no.6
    • /
    • pp.25-31
    • /
    • 2009
  • In this study, pollutant loads delivery ratio by flow duration in Hwangryoung A watershed was estimated. The delivery ratio was estimated with measured data by Ministry of Environment(MOE) and the regression equation based on geomorphic parameters. Eight day interval flow data measured by the MOE were converted to daily flow to calculate daily load and flow duration curve by correlating data of neighboring station which has daily flow data. Regression equation developed by previous study was tested to study watershed and found to be satisfactory. The delivery ratios estimated by two methods were compared. For the case of Biochemical oxygen demand(BOD), the delivery ratios of low flow condition were 7.6 and 15.5% by measured and regression equation, respectively. Also, the delivery ratios of Total phosphorus(T-P) for normal flow condition were 13.3 and 6.3% by measured and regression equation, respectively.

Considerations for the Generation of In-Structure Response Spectra in Seismically Isolated Structures (면진구조물 내 층응답스펙트럼 작성을 위한 고려사항)

  • Lee, Seung Jae;Kim, Jung Han
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.26 no.2
    • /
    • pp.95-103
    • /
    • 2022
  • In order to evaluate the earthquake safety of equipment in structures, it is essential to analyze the In-Structure Response Spectrum (ISRS). The ISRS has a peak value at the frequency corresponding to the structural vibration mode, but the frequency and amplitude at the peak can vary because of many uncertain parameters. There are several seismic design criteria for ISRS peak-broadening for fixed base structures. However, there are no suggested criteria for constructing the design ISRS of seismically isolated structures. The ISRS of isolated structures may change due to the major uncertainty parameter of the isolator, which is the shear stiffness of the isolator and the several uncertainty parameters caused by the nonlinear behavior of isolators. This study evaluated the effects on the ISRS due to the initial stiffness of the bi-linear curve of isolators and the variation of effective stiffness by the input ground motion intensity and intense motion duration. Analyzing a simplified structural model for isolated base structure confirmed that the ISRS at the frequency of structural mode was amplified and shifted. It was found that the uncertainty of the initial stiffness of isolators significantly affects the shape of ISRS. The variation caused by the intensity and duration of input ground motions was also evaluated. These results suggested several considerations for generating ISRS for seismically isolated structures.

Estimation of Settlement Caused by Lateral Displacement by Means of the Differences of Settlements from Consolidation Theory and Field Measurement (압밀이론에 의한 침하량과 현장계측 침하량의 차에 의한 측방유동 침하량 산정)

  • Kang, Min-Soo;Jeon, Sang-Ok;Eam, Sung-Hoon
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.51 no.5
    • /
    • pp.59-68
    • /
    • 2009
  • In this study, it was developed that the software could be used to estimate consolidation settlement by curve fitting method according to Terzaghi's consolidation theory on the condition of gradual incremental loading, and the method of estimating settlement caused by lateral displacement was suggested, in which the settlement was calculated from the difference between the settlement calculated with the developed software using the early part of measured data and the settlement measured for the short duration from the beginning of embankment in the field. The verification of the suggested method of estimating settlement caused by lateral displacement showed good results.

Development of the Leaf-Footed Bug Molipteryx fuliginosa (Hemiptera: Coreidae) (큰허리노린재(노린재목: 허리노린재과)의 발육)

  • Park, Sang Ock
    • The Korean Journal of Ecology
    • /
    • v.19 no.6
    • /
    • pp.575-582
    • /
    • 1996
  • Molipteryx fuliginosa (Uhler, 1860) is a plant juice sucker which feeds on new tips of Rubus oldhami Miquel and Zelkowa serrata Makino, and it has a strong preference for teses two plants in Korea. M. fuliginosa has one generation a year and hibernates as a young adult. Most of the winter survivors emerge in early May. It is the first time their host plants were found and reported. Females mainly lay their eggs one by one separately on the leaves of R. oldhami, and even on the steel wire, the lid guaze and the ground in the laboratory. Nymphs do not gather, but stay on the hatching site, Nymphs except the non-feeding first instar feed on young shoots. From the second to the fifth instar nymphs migrate to the upper part of the shoot and congregate in part on an expanded leaf. The new adults first appeared on 11 August, and remained in the host plant, and fed on until mid October. The duration of the hatching and molting, and the survivorship curve based on the laboratory rearing were determined.

  • PDF

Development of the Leaf-Footed Bug, Anoplocnemis dallasi (Hemiptera: Coreidae) (장수허리노린재(Anoplocnemis dallasi)의 발육)

  • Park, Sang Ock
    • The Korean Journal of Ecology
    • /
    • v.18 no.4
    • /
    • pp.463-470
    • /
    • 1995
  • Anoplocnemis dallasi Kiritchencho is a sap-sucker which feeds on tips of amorpha fruticosa Linne in Korea. A. Dallasi had one generation a year and overwintered as the young adult stage. Most overwintered survivors emerged in early-mid May to late May. Known host plants were reviewed, and new host records were added. Females mainly laid eggs in linear single chain masses on leaves of Miscanthus sinensis var. purpurascens. Nymphs (except the non-feeding first instars) fed on young shoots. First instar nymphs clustered on leaves or shoots where they hatched, and, if disturbed, reformed aggregations soon. The second to the fifth instar nymphs migrate to the upper part of the shoot and congreagate on a partly expanded leaf. New adults firstly appeared in late August, remained on A.fruticosa, host plant, and fed on until mid October. The duration and survivorship curve, in laboratory rearing, of the egg and each nymphal stadium was determined.

  • PDF

Variation of Load Management Incentive Considering Prenotification Period (예고기간별 차이를 반영한 부하조정제도 지원금 차등방안)

  • Won, Jong-Ryul
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.11
    • /
    • pp.1578-1583
    • /
    • 2012
  • There are 3 systems in incentive-based normal load management in Korea; day or hour-ahead, week-ahead, months-ahead. These are originally similar in their operational implementation, but differ in their pre-notification period. Therefore the incentive of these systems should be different according to prenotification period. This is the key problem in implementing these load managements. Customers participating in these load managements feel their economic differences, depending on the risk by prenotification dates. The shorter prenotification period, the more risk take the customers. This paper proposes the method of incentive variation in prenotification difference, by using the theory of financial yield curve, which is used in analysing short and long duration bond interesting rates and is reflecting risk premium in their period.

A new approach to calculations of the expected energy and reliability indices in the generations system (발전시스템의 발전에너지기대치 및 신뢰도 계산에 관한 연구)

  • 박영문;서보혁;박준호
    • 전기의세계
    • /
    • v.30 no.2
    • /
    • pp.112-118
    • /
    • 1981
  • This paper derives two new algorithms to calculate the expected energy generated and the reliability indices of a generating system when the loading order of the generating units and the load data of the system are given. These algorithms use the probabilistic simulation model considering the two-block system, and can be easily extended to the three or more block system if necesssary. Suggested model I is a more improved algorithm from the conventional ones, in which the load duration curve is used as is in any other conventional algorithms. And model II, by using the newly developed " ENERGY CURVE", remarkably saves the computing time with reducing the computational errors. Case studies were carried out for the actual load data of Korea Electric Company.c Company.

  • PDF

The Development of Methodology in order to consider Combined Heat and Power in the Basic Plan of Long Term Electricity Supply & Demand (전력수급기본계획에 열병합발전 설비 반영 방법론의 개발)

  • Kim, Yong-Ha;Kim, Mi-Ye;Woo, Sung-Min;Cho, Sung-Rin;Lim, Hyun-Sung
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.55 no.12
    • /
    • pp.570-575
    • /
    • 2006
  • This paper develops methodology in order to consider CHP(Combined Heat and Power) capacity in the Basic Plan of Long Term Electricity Supply & Demand. We develop generating cost of CHP considering electric and heat. Also we develop mixed load duration curve which includes the electric load and heat load and then apply CHP capacity to SCM(Screening Curve Method) considering CHP feature. Accordingly, it decide the optimal CHP capacity in the Basic Plan of Long Term Electricity Supply & Demand. Also, We perform the sensitivity analysis according to cost variation.

Variation of Slope Stability under rainfall considering Train Speed (열차의 속도 하중을 고려한 강우시 성토사면의 안정성 변화)

  • 김정기;김현기;박영곤;신민호;김수삼
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.601-607
    • /
    • 2002
  • Infiltration of rainfall causes railway embankment to be unstable and may result in failure. Basic relationship between the stability of railway embankment and rainfall introducing the partial saturation concept of ground are defined to analyze the stability of embankment by rainfall. A pressure plate test is also peformed to obtain soil-water characteristic curve of unsaturated soils. Based on this curve, the variables in the shear strength function and permeability function are also defined. These functions are used fur the numerical model for evaluation of railway embankments under rainfall. As comparing the model and case studies, the variation of shear strength, the degree of saturation and pore-water pressure for railway embankment during rainfall can be predicted and the safety factor of railway embankment can be expressed as the function of rainfall amount namely rainfall index. Therefore, the research on safety factor on railway embankment considering train speed and rainfall infiltration with the variation of rainfall intensity and rainfall duration was carried out in this paper.

  • PDF

The Relationship between the Type of New Product Idea Sources and the Rate of Success of NEW Product Development and Commercialization (신제품 아이디어 창출유형과 개발 및 사업화 성패에 관한 연구)

  • 홍종원;용세중
    • Journal of Technology Innovation
    • /
    • v.2 no.1
    • /
    • pp.219-241
    • /
    • 1994
  • This paper presents the results of an empirical study on the relationship between the type of new product idea sources and the rate of success of new product development and commercialization in Korean industries. The sample was taken from various Korean industries including telecommunication, electronics, chemical, machinery, textile, etc. and composed of 45 failure and 73 success cases. The findings are not much different from those of previous studies done in the developed countries, but show some typical characteristics of new product development activities and the idea sources, information acquisition methods, type of information , incentives for idea generation, etc. of the firms in developing country like Korea. Especially the survival rate curve and the accumulative investment curve from the idea generation to commercialization phase show a little different behavior from the previous study, which also reflect the manpower, duration of each phase of the new product development process in the Korean firms.

  • PDF