• Title/Summary/Keyword: Drainage work

Search Result 98, Processing Time 0.023 seconds

An experimental study on the improvement of tunnel drainage system using a geogrid composite (지오그리드 복합 배수재를 이용한 터널 배수성능 개선에 관한 실험적 연구)

  • Lee, Jun S.;Choi, Il-yoon;Lim, Jihoon;Yoon, Suk Chul
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.1
    • /
    • pp.31-40
    • /
    • 2016
  • A new testing equipment is designed to investigate the characteristics of the drainage fabric which is used in the tunnel drain system. The equipment is possible to model the loading as well as boundary conditions of the shotcrete precisely and it follows the general guideline of ASTM D4716 so that the interface between shotcrete and concrete lining retains the real situation in the tunnel site. Using the real loading conditions and surface irregularities, the flow rate and its capacity of the regular fabric has been estimated. A composite drainage fabric having geogrid inside was also used to investigate the flow rate and its efficiency. The advantages of the composite fabric compared with the regular one have been demonstrated using the experimental data and brief outline of the future work is finally proposed.

Effects of Manual Lymph Drainage on Patients with Secondary Lymphedema of Legs After Gynecologic Cancer (부인과 암 이후 이차적인 다리 림프 부종 환자에게 적용한 림프흡수 마사지의 효과)

  • Jeong, Seong-gwan;Lee, Seung-byung
    • The Journal of Korean Academy of Orthopedic Manual Physical Therapy
    • /
    • v.22 no.2
    • /
    • pp.35-39
    • /
    • 2016
  • Background: The superficial lymphatic system is divided into areas called lymphatic territories which are separated by watersheds. When the lymphatic system fails to remove its load either due to surgery, radiotherapy or some congenital malformation of it then the fluid and the proteins and wastes contained within it accumulates in that territory. Anastomotic connections exist across the watersheds and while they can work unaided manual lymph drainage (MLD) can significantly help drainage across them into unaffected lymphatic territories. The purpose of the study is to examine the effectiveness of a manual technique in moving fluids and softening hardened tissues using a tape measure and Patient-Specific Functional Scale. Methods: We examined the movement of fluids from the affected limbs of lymphedema patients who underwent a standardized 30-min treatment using the Dr. Vodder method of MLD. We chose a typical cross section of patients with secondary leg or secondary arm lymphedema. The lymphedema patient was also measured after the conclusion of treatment and underwent a follow-up control measurement, within 8 weeks. Both evaluation tools indicated a movement of fluid to different and unblocked lymphatic territories as well as a softening of tissues in some of the affected limbs. Results: MLD is an effective means of fluid clearance when it accumulates as a consequence of a failure of the lymphatic system. It seems likely that MLD has a systemic effect on the lymphatic system and that it can improve flow from otherwise normal tissues. Conclusions: It is hypothesized that a series of treatments would result in even more significant improvements.

  • PDF

Numerical simulation on gas continuous emission from face during roadway excavation

  • Chen, Liang;Wang, Enyuan;Feng, Junjun;Li, Xuelong;Kong, Xiangguo;Zhang, Zhibo
    • Geomechanics and Engineering
    • /
    • v.10 no.3
    • /
    • pp.297-314
    • /
    • 2016
  • With the mining depth continuously increasing, gas emission behaviors become more and more complex. Gas emission is an important basis for choosing the method of gas drainage, gas controlling. Thus, the accurate prediction of gas emission is of great significance for coal mine. In this work, based on the sources of gas emission from the heading faces and the fluid-solid coupling process, we established a gas continuous dynamic emission model, numerically simulated and applied it to the engineering. The result was roughly consistent with the actual situation and shows the model is correct. We proposed the measures of reducing the excavation distance and borehole gas drainage based on the model. The measures were applied and the result shows the overproof problem of gas emission disappears. The model considered the influence factors of gas emission wholly, and has a wide applicability, promotional value. The research is of great significance for the controlling of gas disaster, gas drainage and pre-warning coal and gas outbursts based on gas emission anomaly at the heading face.

A Calculation of Agricultural Water Demand According to the Farmland Developing Plan on the Saemangeum Tidal Land Reclamation Project (새만금 간척지구의 농업용지 토지이용계획을 고려한 농업용수 수요량 산정)

  • Jang, JeongRyeol;Lee, SungHack;Cho, Youngkweon;Choi, JinYong
    • KCID journal
    • /
    • v.21 no.1
    • /
    • pp.1-16
    • /
    • 2014
  • The purpose of this study is to calculate agricultural water demand as considering landuse plan of the farm land on the Saemangeum tidal land reclamation project. This study based on the farm landuse plan(2012) and considered some items which did not included previous work like prevention water for resalinization for paddy and upland and muli-purpose water for upland. This study showed that the agricultural water demand estimated $145.123Mm^3/yr$, which is needed as much $14.792Mm^3/yr$ as more water than previous work. The difference comes from the change of unit water demand. Water demand is possible to be changed if guidelines are improved and detailed design work is completed through further study. Especially, the more studies for prevention water for resalinization in a tidal reclaimed farmland and water demand for a horticulture are needed.

  • PDF

Assessment and Damage Reduction Strategy of Acid Rock Drainage in Highway Construction Site: ○○ Highway Construction Site (고속도로 건설현장의 산성배수 발생개연성평가 및 피해저감대책: ○○고속도로건설현장)

  • Lee, Jin-Soo;Kim, Jae Gon;Park, Jeong-Sik;Chon, Chul-Min;Nam, In-Hyun
    • Economic and Environmental Geology
    • /
    • v.46 no.5
    • /
    • pp.411-424
    • /
    • 2013
  • Assessment and damage reduction strategy of acidic rock drainage were conducted in a section of ${\bigcirc}{\bigcirc}$ highway construction site. The geology of the studied section consists of Icheonri sandstone and intermediate to acidic volcanic rocks. Sulfides occur as a disseminated type in sandstone and volcanics which were altered by the hydrothermal solution of granite intrusion. Volcanics and sandstone with a high content of sulfide were classified as a potentially acid rock drainage(ARD) forming rock. The drainage originated from those rocks may acidify and contaminate the surrounding area during the highway construction. Therefore, the drainage should be treated before it is discharged. A slope landslide hazard due to the ARD was also expected and the coating technology was recommended for the reduction of ARD generation as a preemptive measure before reinforcement work for enhancing slope stability such as shotcrete and anchor. According to the ARD risk analysis, those rocks should not be used as cement aggregate, but only to be used as a bank fill material of a filling-up system that allows minimal contact with rainfall and groundwater.

Analysis of Nutrients Balance during Paddy Rice Cultivation (수도재배시 논에서의 영양물질 수지 분석)

  • Hwang, Ha-Sun;Jeon, Ji-Hong;Ham, Jong-Hwa;Yoon, Chun-Gyeong
    • Korean Journal of Ecology and Environment
    • /
    • v.36 no.1 s.102
    • /
    • pp.66-73
    • /
    • 2003
  • Field experimental study was performed to evaluate water and nutrient balances in paddy rice culture. The water balance showed that outflow generally balanced the inflow showing that about half (47${\sim}$54%) of total outflow was lost by surface drainage. No significant effect of fertilization rate was observed from three treatments (150%, 100%, and 70% of standard fertilization) on both rice yield and nutrient outflow from surface drainage. Therefore, reducing nonpoint source nutrient loading by reducing fertilization may not work well in the range of normal paddy rice farming practice, and instead it could be achieved by reducing surface drainage outflow. Water-saving irrigation by reducing pending depth, raising ridge height in rice field, and minimizing forced surface drainage are suggested to reduce surface drainage outflow. These practices can save water and protect water quality, however, deviation from conventional standard practices might affect the rice yield and further investigations are necessary. It was demonstrated that rainfall affects nutrient net outflow and paddy rice culture might be beneficial to wafer quality protection under normal rainfall condition.

Reclamation Plan and Design for The Yeochon Industrial Complex (여천 임해공업단지 매립 계획 및 설계)

  • 한경석;신승철
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1992.10a
    • /
    • pp.75-86
    • /
    • 1992
  • The elevation of reclamation work in the coastal area for the industrial complex is determined through the investigation and review of marine conditions, drainage plan and fill materials. The embankment to be constructed with crushed stone on the soft soil should be safe against the wave force, immediate and long term consolidation settlement, overturning and sliding due to self-weight and other forces. Because of lack of fill material from the borrow pit, the soft marine clay to be dredged shall be used as the reclamation material. And Paper Drain Board is used as the improvement method for the deep soft clay strata.

  • PDF

Risk Assessment of Agricultural Construction Works using Accident Analysis and Analytic Hierarchy Process (재해분석을 통한 농업토목공사의 공종별 위험성 평가)

  • Yang, Young Jin;Oh, Sue Hoon;Noh, Jae Kyoung
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.4
    • /
    • pp.15-25
    • /
    • 2018
  • The accident risk at the construction workplace associated with agricultural engineering is comparatively higher than those of other fields due mainly to its complex work types and processes. Agricultural engineering deals with a variety of agricultural infrastructures from irrigation and drainage facilities to giant-scale coastal reclamation land infrastructures. The characteristics that most agricultural projects have conducted on a small-scale even worsen the situation drawing low attentions to risk management. Therefore, systematical risk assessment that focuses on details of agricultural construction work process is required in order to enhance safety management capacity and to prevent repetitive accidents ultimately. This study aims to categorize construction work types and processes of agricultural construction works, and to quantitatively assess the accident risk of them based on accident analysis. Regarding classification of construction works, actual 827 accident cases were thoroughly reviewed and coded by their construction site, facility and work type, project scale and so on. Most accidents (71.8 % of total cases) occurred in small-scale construction workplaces with less than 5 billion Korean won project budget. And those accidents related to agricultural infrastructure project (37.4%) and agricultural water development project (22.4%). In terms of work types, accidents frequently took place in form-work followed by pipe installation work, steel bar work and concrete work. The potential risks were compared with actual outbreak of accidents based on Analytic Hierarchy Process (AHP). The results show that the potential conditions of accident expected to be took place is somewhat different from the actual conditions where accidents actually happened. This implicates that risk management manuals or education needs to be adjusted by reflecting unexpected circumstances. Overall, this study is meaningful in that the results could be foundations as to strengthen risk management capacity for agricultural engineering projects.

Development of Work Breakdown Structure and Analysis of Precedence Relations by Activity in School Facilities Construction Work (학교시설 건설공사의 작업분류체계 구축 및 단위작업별 선후행 관계 분석)

  • Bang, Jong-Dae;Sohn, Jeong-Rak
    • Land and Housing Review
    • /
    • v.8 no.3
    • /
    • pp.189-200
    • /
    • 2017
  • The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.

Effect of Drainage Methods on Machine Workability and Rice Growth for Dry Seeding in Paddy Soil (벼 건답직파시(乾畓直播時) 배수방법(排水方法)이 기계화조건(機械化條件)과 수도생육(水稻生育)에 미치는 영향(影響))

  • Yoo, Chul-Hyun;Yang, Chang-Hyu;Lee, Kyung-Bo;Shin, Bog-Woo;Kim, Sun-Kwan;So, Jae-Don;Rhee, Gyeong-Soo
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.27 no.2
    • /
    • pp.117-124
    • /
    • 1994
  • A study was conducted to dectermine the days with optimum soil moisture after drainage or rain for machine workability and seeding establishment on dry seeding in paddy soils(Jeon buk Series, Haplaquepts). The results are summarized as follows. 1. The possible days of tractor-rotary plough were 5days or more for non-mole hole plot(control). The possible days were 2~4days and the optimum days were 5~6days for mole hale plat. 2. The ratio of soil clod(<1cm) was 1 % and 15% for control and mole hole plats, respectively. The optimum soil moisture range for seeding establishment was 31~32% in this soils. 3. The possible days of combine harvesting work were 9days and 5days after drainage for control and mole hole plots, respectively. 4. Soil physical properties were improved but soil organic matter calcium and magnesium in the soil were decreased in the mole hole plats. 5. Yield was 415kg/10a at seeding after 6day drainage in control and 440kg/10a at seeding after 4day drainage in the mole plots.

  • PDF