• Title/Summary/Keyword: Downtime

Search Result 131, Processing Time 0.023 seconds

Analysis of the Wave Induced Downtimes in Pohang New Harbor (포항신항내 파랑에 의한 Downtime 분석)

  • 정원무;오세범;채장원;김상익
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.9 no.1
    • /
    • pp.24-34
    • /
    • 1997
  • To find the causes of the downtime problems in Pohang New Harbor, extensive field measurements of short- and long-period waves for 1.5 months and their analyses were made taking into account of wind and downtime records. Measured wave height ratios inside the harbor are appeared to be slightly larger than predicted ones using numerical methods in the previous studies. It is shown that the major causes of the downtime are the wind wave (or swell) higher than loading criteria and also swell with even smaller wave height but longer period(more than 10 sec). Waves of long-period components[0(min)] were recorded as 20 cm high in case of dominant seiche phenomena but they might not be related with the downtime problems.

  • PDF

Downtime cost analysis of offloading operations under irregular waves in Malaysian waters

  • Patel, M.S.;Liew, M.S.;Mustaffa, Zahiraniza;Abdurasheed, Abdurrasheed Said;Whyte, Andrew
    • Ocean Systems Engineering
    • /
    • v.10 no.2
    • /
    • pp.131-161
    • /
    • 2020
  • The objective of this study was to evaluate the downtime cost of side-by-side offloading operations in Malaysian waters. With the help of a numerical time domain tool, the structure and cable response of moored FPSO vessel was simulated for heading and beam sea-states under irregular waves. The weather downtime was assessed by comparing the response under operational wave condition with the pre defined industrial safe offloading criteria. Additionally, two cases of cable failure were simulated for each sea-state. The novel study on downtime cost was presented for three different location of Malaysia subcontinent for which the location specific wave scatter diagram facilitated to estimate the probability of occurrence of operational wave condition. It was concluded that an unpredictable increment in wave height by 0.5 m can significantly impact the production cost.

Downtime tracking for small-medium sized manufacturing company using shop floor monitoring (생산현장 모니터링을 이용한 중소 제조기업용 비가동 시간 수집 및 분석)

  • Lee, Jai-Kyung;Lee, Seung-Woo
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.19 no.4
    • /
    • pp.65-72
    • /
    • 2014
  • To improve the productivity of manufacturing company, the analysis of loss in shop floor has to be conducted and validated. This paper introduces the downtime tracking module using the pre-developed shop floor information acquisition system. To collect the downtime, it utilized shop floor monitoring information, user-registered downtime event, equipment diagnosis algorithm and operator's input. Also, it provided the user interface for the analysis of downtime. From the results of a pilot study, the usability of developed system was validated.

Optimization of Cost and Downtime for Periodic PM Model Following the Expiration of Warranty

  • Jung, Ki-Mun
    • Journal of the Korean Data and Information Science Society
    • /
    • v.19 no.2
    • /
    • pp.587-596
    • /
    • 2008
  • This paper develops the optimal periodic preventive maintenance policies following the expiration of warranty: renewing warranty and non-renewing warranty. After the warranty period is expired, the system undergoes the PM periodically and is minimally repaired at each failure between two successive PMs. Firstly, we determine the expected cost rate per unit time and the expected downtime per unit time for the periodic PM model. Then the overall value function suggested by Jiang and Ji(2002) is applied to obtain the optimal PM period and the optimal PM number. Finally, the numerical examples are presented for illustrative purpose.

  • PDF

Replacement Model Based on Cost and Downtime

  • Jung, Ki-Mun;Han, Sung-Sil;Lim, Jae-Hak
    • Journal of the Korean Data and Information Science Society
    • /
    • v.14 no.4
    • /
    • pp.889-901
    • /
    • 2003
  • In this paper, we consider the optimal replacement policies following the expiration of the combination warranty. The combination warranty can be divided into the renewing combination warranty and the non-renewing combination warranty. The criterion used to determine the optimal replacement period is the overall value function based on the expected cost and the expected downtime. Thus, we obtain the expected cost rate per unit time and the expected downtime per unit time for our model. And then the overall value function suggested by Jiagn and Ji(2002) is applied to obtain the optimal replacement period. The numerical examples are presented for illustrative purpose.

  • PDF

A Bayesian Approach to Replacement Policy Based on Cost and Downtime

  • Jung, Ki-Mun;Han, Sung-Sil
    • Journal of the Korean Data and Information Science Society
    • /
    • v.17 no.3
    • /
    • pp.743-752
    • /
    • 2006
  • This paper considers a Bayesian approach to replacement policy model with minimal repair. We use the criterion based on the expected cost and the expected downtime to determine the optimal replacement period. To do so, we obtain the expected cost rate per unit time and the expected downtime per unit time, respectively. When the failure time is Weibull distribution with uncertain parameters, a Bayesian approach is established to formally express and update the uncertain parameters for determining an optimal maintenance policy. Especially, the overall value function suggested by Jiagn and Ji(2002) is applied to obtain the optimal replacement period. The numerical examples are presented for illustrative purpose.

  • PDF

Analysis on Downtime element of Gripper TBM based on field data (현장 데이터 분석을 통한 Gripper TBM의 Downtime 요소 분석)

  • Park, Jinsoo;Song, Ki-Il
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.6
    • /
    • pp.393-402
    • /
    • 2021
  • The first TBM introduced in Korea was the gripper TBM, which was applied to the Gudeok Waterway Tunnel in 1985. In the initial stage of the introduction of the gripper TBM, many applications were mainly focused on waterway tunnels (Tunnel Mechanized Construction Design, 2008). Currently, the construction range of gripper TBM in Korea is widely applied to not only waterway tunnels, but also subways, railway tunnels, and TBM+NATM expansion. Overseas, gripper TBM is generally applied, and even when NATM tunnel is applied, it is applied as an exploration tunnel because of the excellent advance rate of gripper TBM and used as an evacuation tunnel after completion. Due to the fast excavation speed, the application of the gripper TBM in the rock section of weathered rock or higher can minimize the environmental and civil complaints caused by creating a large number of work areas when planning long tunnels or mountain tunnels. In this study, the work process of the general gripper TBM was analyzed by analyzing the construction cycle and the gripper TBM with a diameter of 2.6~5.0 m, which was applied the most in Korea. Downtime was investigated and analyzed.

Downtime Optimization for Fishing Vessel Equipment Using Delay Time Analysis

  • Jung, Gi-Mun;Kwon, Young-Sub;Anand Pillay;Jin Wang
    • International Journal of Reliability and Applications
    • /
    • v.2 no.2
    • /
    • pp.99-105
    • /
    • 2001
  • Delay time analysis is a pragmatic mathematical concept readily embraced by engineers which has been developed as a means to model maintenance decision problem. This paper considers an inspection period using delay time analysis for fishing vessel equipment. We assume that delay time has a Weibull distribution. In this paper, we determine the optimal inspection period which minimize the expected downtime per unit time. Explicit solutions for the optimal inspection are presented for illustrative purposes.

  • PDF

DRL based Dynamic Service Mobility for Marginal Downtime in Multi-access Edge Computing

  • Mwasinga, Lusungu Josh;Raza, Syed Muhammad;Chu, Hyeon-Seung
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2022.05a
    • /
    • pp.114-116
    • /
    • 2022
  • The advent of the Multi-access Edge Computing (MEC) paradigm allows mobile users to offload resource-intensive and delay-stringent services to nearby servers, thereby significantly enhancing the quality of experience. Due to erratic roaming of mobile users in the network environment, maintaining maximum quality of experience becomes challenging as they move farther away from the serving edge server, particularly due to the increased latency resulting from the extended distance. The services could be migrated, under policies obtained using Deep Reinforcement Learning (DRL) techniques, to an optimal edge server, however, this operation incurs significant costs in terms of service downtime, thereby adversely affecting service quality of experience. Thus, this study addresses the service mobility problem of deciding whether to migrate and where to migrate the service instance for maximized migration benefits and marginal service downtime.

Wave Height and Downtime Event Forecasting in Harbour with Complex Topography Using Auto-Regressive and Artificial Neural Networks Models (자기회귀 모델과 신경망 모델을 이용한 복잡한 지형 내 항만에서의 파고 및 하역중단 예측)

  • Yi, Jin-Hak;Ryu, Kyong-Ho;Baek, Won-Dae;Jeong, Weon-Mu
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.29 no.4
    • /
    • pp.180-188
    • /
    • 2017
  • Recently, as the strength of winds and waves increases due to the climate change, abnormal waves such as swells have been also increased, which results in the increase of downtime events of loading/unloading in a harbour. To reduce the downtime events, breakwaters were constructed in a harbour to improve the tranquility. However, it is also important and useful for efficient port operation by predicting accurately and also quickly the downtime events when the harbour operation is in a limiting condition. In this study, numerical simulations were carried out to calculate the wave conditions based on the forecasted wind data in offshore area/outside harbour and also the long-term observation was carried out to obtain the wave data in a harbour. A forecasting method was designed using an auto-regressive (AR) and artificial neural networks (ANN) models in order to establish the relationship between the wave conditions calculated by wave model (SWAN) in offshore area and observed ones in a harbour. To evaluate the applicability of the proposed method, this method was applied to predict wave heights in a harbour and to forecast the downtime events in Pohang New Harbour with highly complex topography were compared. From the verification study, it was observed that the ANN model was more accurate than the AR model.