• Title/Summary/Keyword: Downstream water level

Search Result 351, Processing Time 0.026 seconds

Modeling Artificial Groundwater Recharge in the Hancheon Drainage Area, Jeju island, Korea (제주도 한천유역 지하수 모델개발을 통한 인공함양 평가)

  • Oh, Se-Hyoung;Kim, Yong-Cheol;Koo, Min-Ho
    • Journal of Soil and Groundwater Environment
    • /
    • v.16 no.6
    • /
    • pp.34-45
    • /
    • 2011
  • For the Hancheon drainage area in Jeju island, a groundwater flow model using Visual MODFLOW was developed to simulate artificial recharge through injection wells installed in the Hancheon reservoir. The model was used to analyze changes of the groundwater level and the water budget due to the artificial recharge. The model assumed that $2{\times}10^6m^3$ of storm water would recharge annually through the injection wells during the rainy season. The transient simulation results showed that the water level rose by 39.6 m at the nearest monitoring well and by 0.26 m at the well located 7 km downstream from the injection wells demonstrating a large extent of the affected area by the artificial recharge. It also shown that, at the time when the recharge ended in the 5th year, the water level increased by 81 m at the artificial reservoir and the radius of influence was about 2.1 km downstream toward the coast. The residence time of recharged groundwater was estimated to be no less than 5 years. The model also illustrated that 15 years of artificial recharge could increase the average linear velocity of groundwater up to 1540 m/yr, which showed 100 m/yr higher than before. Increase of groundwater storage due to artificial recharge was calculated to be $2.4{\times}10^6$ and $4.3{\times}10^6m^3$ at the end of the 5th and 10th years of artificial recharge, respectively. The rate of storage increase was gradually diminished afterwards, and storage increase of $5.0{\times}10^6m^3$ was retained after 15 years of artificial recharge. Conclusively, the artificial recharge system could augment $5.0{\times}10^6m^3$ of additional groundwater resources in the Hancheon area.

The estimation of water level fluctuation in the down stream water mark by water level fluctuation in the upper region water mark (상류지점 수위표 수위변동에 따른 하류지점 수위표 수위변동예측)

  • Choi, Han-Kuy;Lim, Yoon-Soo;Baek, Hyo-Seon
    • Journal of Industrial Technology
    • /
    • v.30 no.B
    • /
    • pp.83-89
    • /
    • 2010
  • Generally, the accuracy of the prediction of flood elevation is difficult to identify due to the sedimentation on a river bed, earth and sand being moved by flow, and localized torrential downpours caused by climate change. It is also because of natural and artificial influences on rivers. To predict river floodings successfully, more precise and reliable flood elevation prediction system is needed, in which the concentration time of downstream is numerically interpreted through analyzing and utilizing the watermark of the upper region. Therefore, this research analyzed the prediction methods of the changes in water levels, which use the watermarks of the upper region. The watermarks which impacts the spot being predicted of flood was selected through floodgate analysis and correlation analysis. With the selected watermarks, a statistically reliable regression equation was yielded.

  • PDF

Effect of Observed Discharge Data on Regional Flood Frequency Analysis in the Han River Basin (한강유역 관측유출자료가 지역홍수빈도분석 결과에 미치는 영향)

  • Kim, Nam Won;Lee, Jeong Eun;Lee, Jeongwoo;Jung, Yong
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.6
    • /
    • pp.511-522
    • /
    • 2015
  • This study assessed the impact of uncertainties in flood data on the results of flood frequency analysis for Han river basin. To meet this aim, this study quantified assessment focused on the index flood and quantile by regional flood frequency analysis using the flood data from 17 water level gauges in Han river basin. We analysed the results categorized by three cases according to the characteristics of the measured data. Firstly, we analyzed the regional flood frequency for the water level gauge in the Pyungchang river basin to investigate the impact of water level data. The results has the error of 0.240 with respect to the mean flood. Secondly, we examined the impact of uncertainty in measurement data generated by the application of rating on the results of regional flood frequency analysis. We have compared the results by applying the rating estimated for each year to the one by the recently estimated rating. The results showed that the mean error has 0.246 in terms of the mean flood. Finally, we have inferred the regional flood frequency analysis results with the regulated flow in the downstream area of dams. The regulated specific discharge in the downstream area of dams controlled by dam operation showed a large difference to the estimated specific discharge in the downstream area of dams by extension of the natural specific discharge in the upstream area using the regionalization method.

Status and Causes of Cyanobacterial Blooming in the Downstream of Jecheon Stream (제천천 하류 지역에서 녹조 발생 현황 및 원인 분석)

  • Yu-Ho Jeon;Do-Hwan Kim;Kyoung-Hee Oh;Young-Cheol Cho
    • Korean Journal of Ecology and Environment
    • /
    • v.55 no.2
    • /
    • pp.111-119
    • /
    • 2022
  • The occurrence of cyanobacterial blooming and the contaminant sources were analyzed in the downstream of Jecheon Stream, a tributary of Chungju Reservoir. The concentrations of chlorophyll a at the Myungseo Fishing Point (GPS; 37°03'25.5"N, 128°03'13.6"E) were 399.2 and 184.8 mg m-3 on October 18, 2015 and September 25, 2016, respectively, and the concentrations of total microcystins, a cyanobacterial toxin mainly produced by Microcystis, were 124.09 and 79.71 ㎍ L-1, respectively. The occurrence of cyanobacterial blooming at the downstream of Jecheon Stream was closely related to the water level of Chungju Reservoir. The cyanobacterial blooming occurred after the increase of water level in Chungju Reservoir, when the water body stagnated. As a result of analyzing National Water Quality Monitoring Data of the upper region of Jecheon Stream, the main source of pollutant was Jangpyeong Stream, the tributary of Jecheon Stream, and the discharge water from Jecheon Wastewater Treatment Plant located in Jangpyeong Stream was considered to be the most important source of contaminant.

A Study on the Impact Range Calculation at the Downstream of Dam (댐이 하류하천에 미치는 영향권 산정에 관한 연구)

  • Park, Bong-Jin;Kim, Hyeon-Sik;Jung, Kwan-Sue;Ji, Hong-Ki
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.10
    • /
    • pp.1009-1021
    • /
    • 2008
  • In this study, 4 indices of hydraulic & hydrological, geomorphological, eco & environmental, social effect and 38 items are selected to calculate impact range of downstream of dam. The Analytic Hierarchy Process(AHP) was applied to determine the priority of impact range calculation indices and items. As results of indices valuation, hydraulic & hydrological effect is the first priority, the second is eco & environmental, next are geomorphological and social effect. As results of items valuation, the design flood of dam is the first priority, the second is the natural flood & design flood of channel, next are the design flood rate of channel, drainage area and back water level caused by downstream of dam. In the case of Daechung dam, impact ranges were estimated 47.21 km in terms of the design flood of dam, 45.71 km of the design flood rate of channel, 13.94 km of the drainage area.

Analysis of temperature monitoring data for leakage detection of earth dam (흙댐의 누수구역 판별을 위한 온도 모니터링 자료의 해석)

  • Oh, Seok-Hoon;Seo, Baek-Soo
    • Journal of Industrial Technology
    • /
    • v.28 no.B
    • /
    • pp.39-45
    • /
    • 2008
  • Temperature variation according to space and time on the inner parts of engineering constructions(e.g.: dam, slope) can be a basic information for diagnosing their safety problem. In general, as constructions become superannuated, structural deformation(e.g.: cracks, defects) could be occurred by various factors. Seepage or leakage of water through these cracks or defects in old dams will directly cause temperature anomaly. Groundwater level also can be easily observed by abrupt change of temperature on the level. This study shows that the position of seepage or leakage in dam body can be detected by multi-channel temperature monitoring using thermal line sensor. For this, diverse temperature monitoring experiments for a leakage physical model were performed in the laboratory. In field application of an old earth fill dam, temperature variations for water depth and for inner parts of boreholes located at downstream slope were measured. Temperature monitoring results for a long time at the bottom of downstream slope of the dam showed the possibility that temperature monitoring can provide the synthetic information about flowing path and quantity of seepage of leakage in dam body.

  • PDF

Development of Reservoir Operation Model using Simulation Technique in Flood Season (I) (모의기법에 의한 홍수기 저수지 운영 모형 개발 (I))

  • Sin, Yong-No;Maeng, Seung-Jin;Go, Ik-Hwan;Lee, Hwan-Gi
    • Journal of Korea Water Resources Association
    • /
    • v.33 no.6
    • /
    • pp.745-755
    • /
    • 2000
  • The dam operation system of KOWACO for flood control doesn't have capability to account for the downstream hydrologic conditions and any feasible index to decide the pre-release from the forecasted rainfall and inflow. In this study, a dam operation model for flood control was developed to account for the flood flow condition of its downstream to give users the dam release schedules. Application test of EV ROM to Keum River showed that EV ROM is superior to the Rigid ROM and Technical ROM which are currently used by KOWACO. EV ROM developed in this study provides a release schedule accounting for the cumulative lateral flow hydrograph at the downstream control points where the discharge does not depend only on the dam operation. but also on lateral inflow from the tributaries. In order to reduce the peak discharge at the control points, it suggests the preliminary release during the early rising phase of the predicted hydrograph, holding the flood flow inside the dam during a peak phase, and afterward resuming the release. Three case studies of flood control by the operation of Daechung Multipurpose Dam in Geum River Basin show that the EV ROM is superior to the Rigid ROM and Technical ROM. This must be due to its nature to account for the downstream flow condition as well as the inflow and water level of the dam. It was also conceived that further case studies of EV ROM and more accurate rainfall prediction would improve the dam operation for flood control.ontrol.

  • PDF

Forecasting Technique of Downstream Water Level using the Observed Water Level (관측 수위자료를 이용한 하류 홍수위 예측기법)

  • Kim, Sang Mun;Choi, Heung Sik
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.354-354
    • /
    • 2017
  • 홍수예경보는 발생되는 홍수의 규모와 시간을 가능한 정확하고 빠르게 예측하여 홍수에 대한 위험성을 사전에 알리고자 하는데 목적이 있다. 따라서 하천범람에 따른 피해를 최소화하기 위한 홍수예경보는 일정시간의 선행시간을 확보하는 것이 매우 중요하다. 본 연구에서는 현재 하천에서 측정되고 있는 수위 관측 자료를 이용하여 하류의 수위를 예측하였다. 수위 예측을 위해 다중회귀모형 및 신경망 모형을 한강의 제1지류인 횡성댐 상류 섬강 시험유역에 적용하였다. 다중회귀모형 및 신경망 모형의 학습에는 섬강 시험유역의 2002년부터 2010년까지의 수위 관측 자료를 이용하였으며, 학습된 모형을 이용하여 30분 이내에 발생 가능한 수위를 예측하였다. 모의 결과 신경망 수위예측모형의 결정계수는 0.967으로 나타났으며, 다중회귀수위예측 모형의 결정계수는 0.815로 나타나 신경망을 이용한 수위예측모형이 다중회귀모형보다 좀 더 나은 예측 결과를 나타내는 것을 확인할 수 있었다. 본 연구결과는 향후 중소하천에서 선행시간을 확보한 홍수 예경보 구축에 활용할 수 있을 것으로 판단된다.

  • PDF

Seasonal Changes in Structure and Landscape of Urban Stream Corridor - In the Case of Gongji Stream in Chuncheon- (도시하천 하도구조와 경관의 계절변화 - 춘천시 공지천을 중심으로 -)

  • Jo Hyun-Kil;Han Gab-Soo
    • Journal of Environmental Science International
    • /
    • v.14 no.8
    • /
    • pp.739-748
    • /
    • 2005
  • The purpose of this study is to analyze seasonal changes in structure and landscape of Gongji stream corridor in Chuncheon, and to suggest some guidelines to contribute to creating a desirable close-to- nature stream. The study seasonally surveyed floodplain and revetment conditions, channel micro-topography, streamflow level and velocity, and vegetational cover. Flooding, water level, and vegetation were major factors of affecting seasonal changes in streambed structure and stream landscape. Small sand bars and islands were considerably disturbed by flooding and water level change. However, large islands and sand bars in the upper and middle section of the study stream remained or reappeared even after flooding. Flooding also tended to repeat channel sedimentation at the same spot. Controlling water volume of the Euiam Lake, which is adjacent to the study stream, caused higher water level downstream in the dry seasons. The majority of vegetation in sand bars and islands was washed away by the floods. Vehicle passing, crop cultivation, and ball game were other elements which disturbed vegetation in the floodplain. Creating a close-to-nature stream should reflect micro-topographical changes of channel by flooding, prevent improper vehicle entry and human use, and remove concrete material in the revetment and floodplain.

Safety evaluation of agricultural reservoir embankment according to backside extension (후면 덧쌓기에 따른 농업용 저수지 제체의 안정성 평가)

  • Lee, Dal-Won;Noh, Jae-Jin
    • Korean Journal of Agricultural Science
    • /
    • v.39 no.1
    • /
    • pp.97-110
    • /
    • 2012
  • This study was carried out for safety evaluation, the practical application and improvement of design method of the agricultural reservoir embankment according to backside extension. Seepage analysis, slope stability analysis and finite element analysis were performed for steady state and transient conditions. Also, the pore water pressure, seepage quantity, safety factor and stress-strain behavior according to high water level and rapid drawdown were compared and analyzed. The pore water pressure at contact region between backside extension and old embankment was kept high after rapid drawdown. Therefore, backside extension is recommended that design method is required to be improved and reinforced more than the others raising embankment. The hydraulic gradients before and after backside extension showed high value at the base of the core, but they showed stable state at the upstream slope and downstream slope. The seepage quantity per 1 day and the leakage per 100 m for the steady state and transient conditions appeared to be safe against the piping. The safety factor of slope stability showed high at the steady state, and transient conditions did not show differences depending on the rapid drawdown. The safety factor was appeared high at the upstream slope before backside extension and downstream slope after extension. The excess pore water pressure for steady state and transient conditions showed negative(-) at the upstream slope, it was small at the downstream slope. The mean effective stress (p') showed high at the base of the core and to be wild distribution after the extension. The displacement after extension showed 0.02-0.06 m in the upstream slope, the maximum shear strain after extension was smaller than that before extension.