• Title/Summary/Keyword: Dividing cutting area

Search Result 8, Processing Time 0.027 seconds

A Study on Five-Axis Roughing of Impeller with Ruled Surface (룰드 곡면으로 된 임펠러의 5축 황삭 가공에 관한 연구)

  • Jang, Dong-Kyu;Lim, Ki-Nam;Yang, Gyun-Eui
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.24 no.7 s.196
    • /
    • pp.60-68
    • /
    • 2007
  • This paper presents an efficient 5-axis roughing method for centrifugal impeller. The efficient roughing is minimization of cutting time through minimizing tool tilting and rotating motions. To minimized cutting time, machining area is divided into sub-cutting regions using control points on hub curves and shroud curves of blade used to design and analyze centrifugal impeller. For sub-cutting regions, diameters of cutting tools are determined as big as possible. Then, tool paths are generated with the tilting axis and rotating axis of 5-axis machine limited and fixed, which can give more efficient machining speed and machining stability than the conventional methods. Experimental results show that the proposed method is more efficient than the conventional methods to mill with the only one cutting tool without dividing area and the previous methods to mill with simultaneous 5-axis processing with dividing area.

A Study on Efficient Roughing of Impeller with 5-Axis NC Machine (임펠러의 효율적인 5축 NC 황삭가공에 관한 연구)

  • Cho, Hwan-Young;Jang, Dong-Kyu;Lee, Hi-Koan;Yang, Gyun-Eui
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.27 no.11
    • /
    • pp.1917-1924
    • /
    • 2003
  • This paper proposes a roughing path generation method fer machining impeller with 5-axis machining center. Traditional researches are focus on finishing for machining impeller. To achieve efficient machining, roughing method must be studied. The proposed method consists two steps : One is to select optimal tool size and tool attitude by dividing cutting area into two regions to reduce cutting time. The regions are automatically divided by character point on the geometry of impeller blade. After dividing, the tool of the optimal size is selected for each divided region. The other is avoidance of tool interference. Tool interference in cutting areas is avoided by checking the distance between tool axis vector and ruling line on blade surface or approximated plan between ruling line. Using this method, the cutting time is reduced efficiently.

A Study on Efficient Roughing of Impeller with Ruled Surface (룰드 곡면으로 된 임펠러의 효율적인 황삭 가공에 관한 연구)

  • 임기남;장동규;이희관;양균의
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2004.10a
    • /
    • pp.568-571
    • /
    • 2004
  • This paper presents an efficient 5-axis roughing method for centrifugal impeller. The efficient roughing is minimization of cutting time through minimizing tool tilting & rotating motions. Roughing tool path plan consists of the three steps. First, machining areas are divided into sub cutting regions using ruling lines. The biggest tool diameter is, then, determined for each region. Finally, tool paths are generated after fixing the tilting and rotating axis of 5-axis machine. Experimental results showed that the proposed roughing plan considering the divided machining regions is more efficient than the conventional methods.

  • PDF

A Study on The Process of Land-dividing of Urban-Hanok Area in 11 Gahoe-dong, Seoul (서울 가회동11번지 도시한옥주거지의 필지형성과정 연구)

  • Song, Inho;Jung, Kee Hwang
    • Journal of architectural history
    • /
    • v.23 no.5
    • /
    • pp.47-60
    • /
    • 2014
  • Urban-Hanok emerged as a result of urbanization of Hanok in the modern period. In particular, Urban-Hanok has been mass-produced from the early 1920s, when the population is concentrated in cities, until the middle. Large-scale development by the professional developer has been developed in large-scale land rather than individual client because housing shortage was serious problem. 11 Gahoe-dong was made in 1935-36 is representative Urban-hanok area of Bukchon. It was formed through division of large-scale Land in 1930's. In the 1930's, the large-scale development projects of Urban-Hanok was triggered by the two events. One is Land Investigation Project performed by the Japanese government to capitalization of property, another is the pro-japanese bought the large scale-land in Gahoe-dong at bargain price from The Japanese government. Each lot has still a topographical characteristics such as land-dividing quality, the way of development, characteristic quality of urban-tissue. 11 Gahoe-dong, Urban-hanok area was developed two ways. First, development have been adapted to the topography. The lots have reflected topographical conditions such as land cutting area, a retaining wall, land-diving was maintaining the original topography almost. Second, it was street oriented development. The lots have developed sequentially along the street. So, the lots's shape and size is different each. For this reason, this area distribute various type of Hanok.

A Study on Dividing the Feasible Areas to Cut and Calculating the Stumpage Value of Forests using Geographic Information System (지리정보시스템(GIS)을 이용한 벌채가능지역의 구분 및 입목가격 산정에 관한 연구)

  • Kim, Han-Soo;Won, Hyun-Kyu;Choi, Jo-Ryong;Woo, Jong-Choon
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.3 no.3
    • /
    • pp.54-68
    • /
    • 2000
  • This study was tried to calculate the stumpage value using GIS technique. Before calculating this price the feasible areas to cut were divided from all forests. The stumpage value per $m^3$ was calculated by the method of calculating back from the market price, according to the working volume of logging unit and clearing a felling area using GIS. The distribution of the stumpage value for the coniferous stands was estimated from minimum 10,000 won to maximum 50,000 won, and for the deciduous stands the stumpage value was distributed from minimum 20,000 won to maximum 40,000 won. The total estimated selling price for the cutting available area (197.3ha) among this study area(250ha) except the cutting limited area was about 1.13 billions won. And the estimated selling price for the korean white pine stands was about 650 millions won, occupied 57% among the total selling price, and for the deciduous stands showed 383 millions won, occupied 34% of the total price, and for the japanese larch was 9.69 millions won, occupied 9% of the total price. But the rigida pine stands showed only 1.22 millions won.

  • PDF

A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work (아스팔트포장 유지보수 적정공사비 산정방안 연구)

  • Oh, JaeHun;Song, TaeSeok;An, BangYul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.16-26
    • /
    • 2020
  • Road Pavement Maintenance Work is generated in a variety of different field conditions, and it is difficult to calculate the construction cost because there are no detailed criteria when preparing the estimated construction cost. Unlike new pavements, Road Pavement Maintenance has to be constructed with operating vehicles, and there are many differences in productivity depending on urban areas, limited work hours, night-time, construction area, etc. To compensate for this, the standard for calculation of construction cost provides additional charges for the number of lanes, residential areas, working hours, and night work, but it applied differently depending on construction officials. In this study, construction cost estimation standards that can properly reflect the conditions of the site was investigated for major types of Road Pavement Maintenance work. The site was investigated and analyzed mainly for many construction sites with 'overlay of asphalt after cutting', 'restore surface', 'repair of pavement', and 'recovery of roadway'. The criteria for the application of construction volume separately according to working hours, public places, and land area including extra charges for basic downtown and residential area. The hours of operation were divided into three types(7 hours, 5 hours, 3 hours) excluding movement and preparation time, and each type provided a coefficient for dividing the area of the construction site into five types. The construction cost calculation method based on the construction purpose is site conditions is proposed accordingly, and it is deemed that a plan for the designer to calculate the construction cost has been prepared in consideration of the site conditions.

Meningeal Layers Around Anterior Clinoid Process as a Delicate Area in Extradural Anterior Clinoidectomy : Anatomical and Clinical Study

  • Yoon, Byul Hee;Kim, Han Kyu;Park, Mun Sun;Kim, Seong Min;Chung, Seung Young;Lanzino, Giuseppe
    • Journal of Korean Neurosurgical Society
    • /
    • v.52 no.4
    • /
    • pp.391-395
    • /
    • 2012
  • Objective : Removal of the anterior clinoid process (ACP) is an essential process in the surgery of giant or complex aneurysms located near the proximal internal carotid artery or the distal basilar artery. An extradural clinoidectomy must be performed within the limits of the meningeal layers surrounding the ACP to prevent morbid complications. To identify the safest method of extradural exposure of the ACP, anatomical studies were done on cadaver heads. Methods : Anatomical dissections for extradural exposure of the ACP were performed on both sides of seven cadavers. Before dividing the frontotemporal dural fold (FTDF), we measured its length from the superomedial apex attached to the periorbita to the posterolateral apex which connects to the anterosuperior end of the cavernous sinus. Results : The average length of the FTDF on cadaver dissections was 7 mm on the right side and 7.14 mm on the left side. Cranial nerves were usually exposed when cutting FTDF more than 7 mm of the FTDF. Conclusion : The most delicate area in an extradural anterior clinoidectomy is the junction of the FTDF and the anterior triangular apex of the cavernous sinus. The FTDF must be cut from the anterior side of the triangle at the periorbital side rather than from the dural side. The length of the FTDF incision must not exceed 7 mm to avoid cranial nerve injury.

A Study on the Methodology of Land-Consolidation Sloping Paddies in land Vallry for the Farm-Mechanization (II) (기계화를 전제로 한 산간경사지답경지정리방안에 관한 연구(II))

  • Hwang, Eun
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.24 no.4
    • /
    • pp.57-68
    • /
    • 1982
  • The paddy fiels slope located in Kangweon province Hwyongsung gun Gonggeun myon Shinchonri was considerably steep and so it was impossible to economically consolidate the field up to date. But for the porpose of farm mechanization, the field (32. 27ha) was consolidated by the auther under the assitance of the Ministry of Agriculture and Fishery and,;the Administration of Kangweon province. This paddy field consolidation was caused by the treatise on "Land-consolidation methods for farm mechanization in the steep-sloped paddy field", of which the auther is the same. The constrution was carried out from September, 1981 to April, 1982. During the 4esign and construction, some Peculiarities were found and discussed. That is, in design, besides the common condititions for a design, some special conditions were considered and written below; (1) The ranges of field slope in this design were 1/100-1/30. (2) Long sides of the land readjustment blocks must be arranged abreast contour line, and so they make the amount of cutting and banking decreased so as to take the maximum advantage of the configuration of the field. (3) In design, the main principles of dividing blocks were written below; i) First of all, long side of a block should be drawn straight abreast a contour line. ii) Long side of a block should arrange abreast contour line and make its length 100-150m, if not, l)reak the side in order to make a bended rectangle. iii) Length of a short side should be determinded within differences of elevation (0.6 -1. 2m) between the two adjacent blocks toward the normal to a contour line. iv) Length of a short side should be above 15m and the ratio of long and short side should be slso kept 1: (4-6). v) A new field surface leveling was determinded from the elevation which produce the least amount of cuttingand banking within the range of 0.6-1. 2m diffe rences of elevation between the two adjacent blocks. vi) In the course of dividing blocks with the same width along the line which was normal to a contour line, all blocks connot keep their shape in a retangle because of steep slope of the field and so on, and so it was also necessory to make some non-retanglar and small blocks such as a trianglar or trapezoidal shape, which was impossible to use some of farm machinery. But because this non-rectanglar and small blocks were divided, larger and many rectanglar blocks can be divided and construction cost can also be lowered. According to the conditions discussed above, the paddy field consolidation project designed and constructed. And the results of this study were obtained as below; (1) Three-forth of total cost of this paddy field consolidation was not construction cost, and these cost consist of land grading (1/4), road and canal construction cost (1/4) and the other cost (1/4) such as surveying or materials and 56 on. (2) The steeper the land slope, the greater cost was assigned for road and canal construction, and than land grading. (3) Curtailment of the road and canal construction cost depended on simplificating their strutures. (4) In the case of the land slopes were low, the land grading cost was high by 1: 1.4 in comparison with the road and canal construction cost, and conversely when the slops were steep, the road and canal construction cost was high by 1 : 5 in compa- rison with the land grading cost. (5) The densities of irrigation canal, drainage canal and trunk and branch road were 150. Sm/ha, 60. im/ha and 17. 4m/ha respectively. The density of irrigation canal of the area was high by 2 times in comparison with the average one of Kangweon Province, and the others were nearly the same. (6) Most farmers (above 85%) knew the effects of paddy field consolidation. The effects are; 1) Improvement of irrigation 2) Improvement of farm management 3) Improvement of transportarion 4) farm mechanization and 5) grouping of the scattered land. And the more farm modernization was accomplished by these projects, the more farmers wanted to live in their land. (7) In spite of the very steep sloped paddy field, the diminution rate of the net farm land caused by consolidation was 7.7% which was nearly the same as the one of Chulweon plain of Kangweon province. Land grading cost was 971, OOOwon/ha which was rather cheap by 13.2% than the one of Ghulweon plain, and unit construction cost was 5, 341, OOOwon/ha (included soil addition) which was also nearly the same as the one of Chulweon plain and FNFIA (The federation of national farmland improvement association).

  • PDF