• 제목/요약/키워드: Distribution factor

검색결과 4,929건 처리시간 0.033초

터널의 3차원 수치해석에서 하중분배율 적용에 관한 연구 (A Study on the Application of Load Distribution Factor through the Three-Dimensional Numerical Analysis in Tunnel)

  • 윤원섭;조철현;박상준;김종국;채영수
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 춘계 학술발표회 초청강연 및 논문집
    • /
    • pp.784-791
    • /
    • 2008
  • In this study, we recognized about application of the load distribution factor for design of tunnel in 3D numerical analysis. Generally, load distribution factor of tunnel is applied to describe 3D arching effect that can not describe when 2D numerical analysis. Through result of 3D numerical analysis, we used to apply in numerical analysis for the load distribution factor that ratio of finally displacement to displacement of construction step. But 3D numerical analysis need to apply to load distribution factor for convenience of numerical analysis. Therefore, we proposed load distribution factor that reduce time and coast. It corrected variable of advanced length in load distribution factor of 3D numerical analysis.

  • PDF

彈性支持를 받는 四角多孔板의 荷重分布係數에 관한 연구 (A Study on the Load Distribution Factor in the Perforated Square Plate with Elastic Support at Four Corners)

  • 임정식;이영신
    • 대한기계학회논문집
    • /
    • 제13권4호
    • /
    • pp.563-571
    • /
    • 1989
  • 본 연구에서는 이들 무시된 영향을 고려하여 하중작용점에서의 하중분포계수 를 구하여, 이 하중분포계수에 의해 위치에 따라 실제와 가까운 하중을 가하므로서 보다 엄밀한 판의 해석을 할 수 있도록 제시하였다.

Prediction of rock fragmentation and design of blasting pattern based on 3-D spatial distribution of rock factor

  • 심현진;한창연;남현우
    • 지반과기술
    • /
    • 제3권3호
    • /
    • pp.15-22
    • /
    • 2006
  • The optimum blasting pattern to excavate a quarry efficiently and economically can be determined based on the minimum production cost, which is generally estimated according to rock fragmentation. Therefore, it is a critical problem to predict fragment size distribution of blasted rocks over an entire quarry. By comparing various prediction models, it can be ascertained that the result obtained from Kuz-Ram model relatively coincides with that of field measurements. Kuz-Ram model uses the concept of rock factor to signify conditions of rock mass such as block size, rock jointing, strength and others. For the evaluation of total production cost, it is imperative to estimate 3-D spatial distribution of rock factor for the entire quarry. In this study, a sequential indicator simulation technique is adopted for estimation of spatial distribution of rock factor due to its higher reproducibility of spatial variability and distribution models than Kriging methods. Further, this can reduce the uncertainty of predictor using distribution information of sample data. The entire quarry is classified into three types of rock mass and optimum blasting pattern is proposed for each type based on 3-D spatial distribution of rock factor. In addition, plane maps of rock factor distribution for each ground level are provided to estimate production costs for each process and to make a plan for an optimum blasting pattern.

  • PDF

C계수의 추정오차가 배수관망해석에 미치는 영향 (Effect of C Factor Errors on the Analysis of Water Distribution Systems)

  • 현인환;이철규
    • 상하수도학회지
    • /
    • 제13권2호
    • /
    • pp.23-33
    • /
    • 1999
  • This study is to investigate the effect of C factor errors on the analysis of water distribution systems. For this purpose, an artificial distribution network and a real distribution network were selected as the study networks. Results are as follows. 1. The C factor of a pipe which has small velocity didn't give significant effect on the analysis of a water distribution system. 2. The effect of decreased value of C factors give more influence on the analysis of water distribution systems than that of the increased values. 3. For the C factor calibration, errors of the residual water heads as well as those of the head losses should be considered together. 4. In the analysis of water distribution systems, changes of C factors can give influences only on the nodes which locate behind the pipe. Therefore, this characteristics should be considered in the selection of nodes for the measurement of water heads.

  • PDF

Optimal Calculation Method of Distribution Loss in Distribution Systems

  • Rho Dae-Seok
    • KIEE International Transactions on Power Engineering
    • /
    • 제5A권2호
    • /
    • pp.109-115
    • /
    • 2005
  • Recently, the needs and concerns regarding power loss have been increasing according to energy conservation at the level of the national policies and the business strategies of power utilities. In particular, the issue of power loss is the main factor for determining rates for electrical consumption in the deregulation of the electrical industry. However, because of the lack of management for power loss load factors (LLF) it is difficult to make a calculation for power loss and to make a decision concerning the electric rates. Furthermore, loss factor (k-factor) in Korea, which is of primary significance in the calculation of distribution power loss, has been used as a fixed value of 0.32 since the fiscal year 1973. Therefore, this study presents the statistical calculation methods of the loss factors classified by load types and seasons by using the practical data of 65 primary feeders that have been selected by appropriate procedures. Based on the above, the algorithms and methods, as well as the optimal method of the distribution loss management classified by facilities such as primary feeders, distribution transformers and secondary feeders is presented. The simulation results demonstrate the effectiveness and usefulness of the proposed methods.

A bimodal Weibull distribution - capacity factor for different heights at sulur

  • Seshaiah, C.V.;Indhumathy, D.
    • Wind and Structures
    • /
    • 제28권1호
    • /
    • pp.63-70
    • /
    • 2019
  • Due to developing environmental concern use of renewable energy source is very essential. The great demand for the energy supply coupled with inadequate energy sources creates an emergency to find a new solution for the energy shortage. The appropriate wind energy distribution is the fundamental requirement for the assessment of wind energy potential available at the particular site essential for the design of wind farms. Hence the proper specification of the wind speed distribution plays a vital role. In this paper the Bimodal Weibull distribution is used to estimate the Capacity factor at the proposed site. The shape and scale parameters estimated using Maximum likelihood method is used as the initial value for extrapolation. Application of this model will give an accurate result overwhelming the concept of overestimation or underestimation of Capacity factor.

호당 수용률 조정을 통한 동력용 배전 변압기 최대부하 예측 개선 방안 (Improvement Method of Peak Load Forecasting for Mortor-use Distribution Transformer by Readjustment of Demand Factor)

  • 박경호;김재철;이희태;윤상윤;박창호;이영석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.41-43
    • /
    • 2002
  • The contracted electric power and the demand factor of customers are used to predict the peak load in distribution transformers. The conventional demand factor was determined more than ten years ago. The contracted electric power and power demand have been increased. Therefore, we need to prepare the novel demand factor that appropriates at present. In this paper, we modify the demand factor to improve the peak load prediction of distribution transformers. To modify the demand factor, we utilize the 169 data acquisition devices for sample distribution transformers in winter, spring summer. And, the peak load currents were measured by the case studies using the actual load data, through which we verified that the proposed demand factors were correct than the conventional factors. A newly demand factor will be used to predict the peak load of distribution transformers.

  • PDF

설계속도 상향에 따른 인간공학적 특성을 반영한 편경사와 횡방향마찰계수 분배방법에 관한 연구 (A Study for Distribution Methods Between Superelevation and Side Friction Factor Reflecting Ergonomic Characteristics by Increasing Design Speed)

  • 정승원;김상엽;최재성;김홍진;장태연
    • 한국도로학회논문집
    • /
    • 제15권3호
    • /
    • pp.103-115
    • /
    • 2013
  • PURPOSES: The purpose of this study is to develop a method for distribution between superelevation and side friction factor by increasing design speed. METHODS: First of all, a method for distribution between superelevation and side friction factor and a theory for the functional formula of side friction factor in compliance with horizontal radius applied in South Korea and the United States are considered. Especially, design speed of 140km/h and numerical value of design elements are applied to the theory for the functional formula of side friction factor in AASHTO's methods. Also, the anxiety EEG upon running speed is measured to reflect ergonomic characteristics through field experiments at seven curve sections of the West Coast Freeway, and this data is applied to graph for the functional formula of side friction factor. RESULTS : Matching side friction factor against the anxiety EEG, the results that a critical points of driver's anxiety EEG sharply increase locate under existing parabola are figured out. CONCLUSIONS : Therefore, we could get a new type of the functional formula that driver's driving comfortability is guaranteed if the existing the functional formula of side friction factor goes down under boundary of the critical points of the anxiety EEG.

동력용 배전 변압기의 최대부하 예측 개선 방안에 관한 연구 (A Study on the Peak Load Prediction for Molter-use Distribution Transformer)

  • 박경호;김재철;윤상윤;이영석;박창호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 A
    • /
    • pp.530-532
    • /
    • 2002
  • The contracted electric power and the demand factor of customers are used to predict the peak load in distribution transformers. The conventional demand factor was determined more than ten years ago. The contracted electric power and power demand have been increased. Therefore, we need to prepare the novel demand factor that appropriates at present. In this paper, we modify the demand factor to improve the peak load prediction of distribution transformers. To modify the demand factor, we utilize the 169 data acquisition devices for sample distribution transformers. The peak load currents were measured by the case studies using the actual load data, through which we verified that the proposed demand factors were correct than the conventional factors. A newly demand factor will be used to predict the peak load of distribution transformers.

  • PDF

배전선로에 유도발전기 연결시 역률 변동에 관한 연구 (A study on the variation of power factor by connection of the induction generator to the distribution line)

  • 김종겸;박영진;이경배;김영국
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2015년도 제46회 하계학술대회
    • /
    • pp.1469-1470
    • /
    • 2015
  • Recently induction generator has been applied to many small hydro power plants. Induction generator needs a reactive power for magnetization. The reactive power of induction generator is being supplied from the supply side mostly. The use of induction generators in the power distribution grid can affect the power factor. The power factor of induction generator is fixed already during production. The power factor in the distribution system is due to the increase or decrease of the load rather than due to the induction generator. In this study, we analyzed how the power factor is changed according to the load increase or decrease in the distribution lines.

  • PDF